IR 05000298/1993028
ML20059J080 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 01/19/1994 |
From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
References | |
NUDOCS 9401310342 | |
Download: ML20059J080 (3) | |
Similar Documents at Cooper | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196F7641999-06-23023 June 1999 Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment ML20196B5291999-06-15015 June 1999 Notification of Significant Licensee Meeting with Util on 990715 Re Introduction of New Members of Midamerican Energy Co Senior Mgt to NRC Region IV Managers ML20207E6241999-05-28028 May 1999 Notification of 990622 Meeting with Util in Auburn,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Cooper Nuclear Station ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205R6021999-04-16016 April 1999 Notification of 990506 Mgt Meeting with Util in Arlington,Tx to Discuss Rev 3 to Cooper Engineering Improvement Strategy & Implementation of Cooper C/A Program ML20205A4311999-03-22022 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990208-12 ML20205A5671999-03-22022 March 1999 Forwards Exam Rept 50-298/99-301 with as Given Written Exam Administered on 990212 ML20204J0371999-03-19019 March 1999 Notification of 990330 Meeting with Util to Discuss Results of Most Recent NRC Plant Performance Review ML20206U1431999-02-0505 February 1999 Notification of Significant Licensee Meeting with Util on 990224 to Discuss Lessons Learned from Recent Refueling Outage & Status of Cooper Engineering Strategy ML20155E6301998-10-30030 October 1998 Notification of Licensee Meeting with Util on 981217 in Arlington,Tx to Discuss Progress of Cooper Engineering Improvement Strategy ML20237C3461998-08-17017 August 1998 Revised Notification of 980903 Meeting W/Util in Brownville,Ne to Discuss Results of Salp.Meeting Revised to Change Time of SALP Meeting ML20236X8271998-08-0606 August 1998 Notification of Licensee Meeting W/Util on 980821 to Discuss Cooper Engineering Improvement Strategy & Actions to Improve Engineering ML20236X8901998-08-0303 August 1998 Notification of Licensee Meeting W/Util in Brownville,Ne on 980903 to Discuss Results of Systematic Assessment of Licensee Performance ML20217Q2161998-05-0404 May 1998 Notification of Licensee Meeting W/Util on 980518 in Brownville,Ne to Discuss Cooper Engineering Improvement Strategy ML20216J4651998-04-20020 April 1998 Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970502 Request to Revise Plant Quality Assurance Program for Operation Policy Document ML20217B6811998-04-20020 April 1998 Notification of 980504 Meeting W/Util in Arlington,Tx to Provide NRC Reviewers W/Opportunity to Obtain Clarification on Details of Revised Cooper Engineering Improvement Strategy ML20196E4381998-04-13013 April 1998 Discusses Insp Rept 50-298/96-24 Re Review of Instrument Impulse Line Configuration for Various Instruments,Including Drywell Pressure Instruments.Assistance Requested Re Licensee Method for Verifying Status of Subject Valves ML20217B6211998-03-23023 March 1998 Notification of 980327 Meeting W/Util to Discuss Regulatory Perspectives of Plant NUREG-1433, Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-14331998-03-19019 March 1998 Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-1433 ML20216H7581998-03-18018 March 1998 Notification of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee 971222 Responses to NRC 971106 RAI Re ITS Section 3.6, Containment Sys ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy NUREG-1433, Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-14331998-02-0404 February 1998 Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-1433 ML20199F6551998-01-30030 January 1998 Forwards TIA 95-010 Response Re Plant,For Placement in PDR ML20198N2671998-01-15015 January 1998 Notification of 980130 Meeting W/Util in Arlington,Tx to Discuss Lessons Learned from Design Basis Insp,Overview of Plans for Engineering Improvement & Engineering Performance Indicators ML20198Q1881998-01-13013 January 1998 Forwards Nonproprietary Version of Montecello & Cooper Trip Rept to PDR ML20199D0021997-11-17017 November 1997 Notification of 971204 Meeting W/Util in Brownville,Ne for Exit Meeting for NRC Design Insp ML20211J1211997-10-0303 October 1997 Notification of 971017 Predecisional Enforcement Conference W/Nppd in Arlington,Texas to Discuss Apparent Violations in NRC Insp Rept 50-298/97-12 ML20217E1031997-09-25025 September 1997 Notification of 971008 Meeting W/Util in Rockville,Md to Provide Status of Ongoing Plant USAR Rebaselining Project ML20210T4041997-09-0909 September 1997 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970616-20 at Plant,Unit 1 ML20199F6911997-08-14014 August 1997 Forwards SE Accepting Licensee Design of torus-to-reactor Building Vacuum Breakers at Plant ML20198F7971997-08-0707 August 1997 Notification of Significant Licensee Meeting W/Util on 970821 in Brownville,Ne to Discuss Operability Assessments, 10CFR50.59 SEs & Plant Performance Indicators ML20149J0841997-07-23023 July 1997 Notification of 970807 Meeting W/Nppd Industrial Advisory Group (Iag) in Arlington,Texas to Discuss Iag Functions & Roles ML20141H4801997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610-11 Grid Disturbance.Nppd Was Notified & Expressed No Objection to Placement of Info in PDR ML20141H4131997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610 Grid Disturbance.Memo Documents Staff Actions Taken & Planned & to Make Subj Info Publicly Available ML20138E2961997-04-30030 April 1997 Notification of Significant Licensee Meeting W/Util on 970513 to Discuss Engineering ML20137L2591997-04-0101 April 1997 Notification of 970425 Meeting W/Util in Arlington,Tx to Discuss EP Status & Direction ML20137J7171997-04-0101 April 1997 Notification of Predecisional EC on 970401 to Discuss Apparent Failures to Maintain License Basis as Discussed in NRC Insp Repts 50-298/96-24 & 50-298/96-31 ML20135E1511996-12-0404 December 1996 Notification of 961219 Meeting W/Util in Arlington,Tx to Discuss Engineering & Other Plant Challenges ML20134M0551996-11-19019 November 1996 Notification of 961210 Licensee Meeting W/Util in Arlington, Tx to Discuss Emergency Preparedness Status ML20149F6611994-08-0505 August 1994 Notification of Licensee Meeting W/Util on 940812 to Discuss Licensee Response to Confirmatory Action Ltr IR 05000298/19930281994-01-19019 January 1994 Notification of Significant Licensee Meeting W/Util in Arlington,Tx to Discuss Apparent Violations Identified in NRC Insp Rept 50-298/93-28 ML20059L3301993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931123 in Arlington,Tx to Discuss Corrective Action Program Upgrade Status,Overview of Operational Safety Team Insp & Licensee Operational Experience Program ML20059H2531993-11-0404 November 1993 Notification of Significant Licensee Meeting W/Util on 931119 to Discuss Results of Operational Safety Team Insp (Osti) Being Conducted at Plant.Dates of Insp Are 931101-05 & 931115-19 ML20057A8201993-09-0909 September 1993 Notification of 930921 Meeting W/Util in Rockville,Md to Discuss Organizational Changes Designed to Bring About Improved Performance ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128B5271993-01-28028 January 1993 Notification of Significant Licensee Meeting W/Util on 930226 to Discuss QA Audit Issues & Licensee Action Plan in Response to Salp,Nrc Insp Rept 50-298/92-99 1999-08-27 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A9811999-10-30030 October 1999
[Table view]Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196F7641999-06-23023 June 1999 Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment ML20196B5291999-06-15015 June 1999 Notification of Significant Licensee Meeting with Util on 990715 Re Introduction of New Members of Midamerican Energy Co Senior Mgt to NRC Region IV Managers ML20207E6241999-05-28028 May 1999 Notification of 990622 Meeting with Util in Auburn,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Cooper Nuclear Station ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205R6021999-04-16016 April 1999 Notification of 990506 Mgt Meeting with Util in Arlington,Tx to Discuss Rev 3 to Cooper Engineering Improvement Strategy & Implementation of Cooper C/A Program ML20205A4311999-03-22022 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990208-12 ML20205A5671999-03-22022 March 1999 Forwards Exam Rept 50-298/99-301 with as Given Written Exam Administered on 990212 ML20204J0371999-03-19019 March 1999 Notification of 990330 Meeting with Util to Discuss Results of Most Recent NRC Plant Performance Review ML20206U1431999-02-0505 February 1999 Notification of Significant Licensee Meeting with Util on 990224 to Discuss Lessons Learned from Recent Refueling Outage & Status of Cooper Engineering Strategy ML20155E6301998-10-30030 October 1998 Notification of Licensee Meeting with Util on 981217 in Arlington,Tx to Discuss Progress of Cooper Engineering Improvement Strategy ML20237C3461998-08-17017 August 1998 Revised Notification of 980903 Meeting W/Util in Brownville,Ne to Discuss Results of Salp.Meeting Revised to Change Time of SALP Meeting ML20236X8271998-08-0606 August 1998 Notification of Licensee Meeting W/Util on 980821 to Discuss Cooper Engineering Improvement Strategy & Actions to Improve Engineering ML20236X8901998-08-0303 August 1998 Notification of Licensee Meeting W/Util in Brownville,Ne on 980903 to Discuss Results of Systematic Assessment of Licensee Performance ML20217Q2161998-05-0404 May 1998 Notification of Licensee Meeting W/Util on 980518 in Brownville,Ne to Discuss Cooper Engineering Improvement Strategy ML20216J4651998-04-20020 April 1998 Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970502 Request to Revise Plant Quality Assurance Program for Operation Policy Document ML20217B6811998-04-20020 April 1998 Notification of 980504 Meeting W/Util in Arlington,Tx to Provide NRC Reviewers W/Opportunity to Obtain Clarification on Details of Revised Cooper Engineering Improvement Strategy ML20196E4381998-04-13013 April 1998 Discusses Insp Rept 50-298/96-24 Re Review of Instrument Impulse Line Configuration for Various Instruments,Including Drywell Pressure Instruments.Assistance Requested Re Licensee Method for Verifying Status of Subject Valves ML20217B6211998-03-23023 March 1998 Notification of 980327 Meeting W/Util to Discuss Regulatory Perspectives of Plant NUREG-1433, Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-14331998-03-19019 March 1998 Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-1433 ML20216H7581998-03-18018 March 1998 Notification of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee 971222 Responses to NRC 971106 RAI Re ITS Section 3.6, Containment Sys ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy NUREG-1433, Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-14331998-02-0404 February 1998 Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-1433 ML20199F6551998-01-30030 January 1998 Forwards TIA 95-010 Response Re Plant,For Placement in PDR ML20198N2671998-01-15015 January 1998 Notification of 980130 Meeting W/Util in Arlington,Tx to Discuss Lessons Learned from Design Basis Insp,Overview of Plans for Engineering Improvement & Engineering Performance Indicators ML20198Q1881998-01-13013 January 1998 Forwards Nonproprietary Version of Montecello & Cooper Trip Rept to PDR ML20199D0021997-11-17017 November 1997 Notification of 971204 Meeting W/Util in Brownville,Ne for Exit Meeting for NRC Design Insp ML20211J1211997-10-0303 October 1997 Notification of 971017 Predecisional Enforcement Conference W/Nppd in Arlington,Texas to Discuss Apparent Violations in NRC Insp Rept 50-298/97-12 ML20217E1031997-09-25025 September 1997 Notification of 971008 Meeting W/Util in Rockville,Md to Provide Status of Ongoing Plant USAR Rebaselining Project ML20210T4041997-09-0909 September 1997 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970616-20 at Plant,Unit 1 ML20199F6911997-08-14014 August 1997 Forwards SE Accepting Licensee Design of torus-to-reactor Building Vacuum Breakers at Plant ML20198F7971997-08-0707 August 1997 Notification of Significant Licensee Meeting W/Util on 970821 in Brownville,Ne to Discuss Operability Assessments, 10CFR50.59 SEs & Plant Performance Indicators ML20149J0841997-07-23023 July 1997 Notification of 970807 Meeting W/Nppd Industrial Advisory Group (Iag) in Arlington,Texas to Discuss Iag Functions & Roles ML20141H4801997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610-11 Grid Disturbance.Nppd Was Notified & Expressed No Objection to Placement of Info in PDR ML20141H4131997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610 Grid Disturbance.Memo Documents Staff Actions Taken & Planned & to Make Subj Info Publicly Available ML20138E2961997-04-30030 April 1997 Notification of Significant Licensee Meeting W/Util on 970513 to Discuss Engineering ML20137L2591997-04-0101 April 1997 Notification of 970425 Meeting W/Util in Arlington,Tx to Discuss EP Status & Direction ML20137J7171997-04-0101 April 1997 Notification of Predecisional EC on 970401 to Discuss Apparent Failures to Maintain License Basis as Discussed in NRC Insp Repts 50-298/96-24 & 50-298/96-31 ML20135E1511996-12-0404 December 1996 Notification of 961219 Meeting W/Util in Arlington,Tx to Discuss Engineering & Other Plant Challenges ML20134M0551996-11-19019 November 1996 Notification of 961210 Licensee Meeting W/Util in Arlington, Tx to Discuss Emergency Preparedness Status ML20149F6611994-08-0505 August 1994 Notification of Licensee Meeting W/Util on 940812 to Discuss Licensee Response to Confirmatory Action Ltr IR 05000298/19930281994-01-19019 January 1994 Notification of Significant Licensee Meeting W/Util in Arlington,Tx to Discuss Apparent Violations Identified in NRC Insp Rept 50-298/93-28 ML20059L3301993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931123 in Arlington,Tx to Discuss Corrective Action Program Upgrade Status,Overview of Operational Safety Team Insp & Licensee Operational Experience Program ML20059H2531993-11-0404 November 1993 Notification of Significant Licensee Meeting W/Util on 931119 to Discuss Results of Operational Safety Team Insp (Osti) Being Conducted at Plant.Dates of Insp Are 931101-05 & 931115-19 ML20057A8201993-09-0909 September 1993 Notification of 930921 Meeting W/Util in Rockville,Md to Discuss Organizational Changes Designed to Bring About Improved Performance ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128B5271993-01-28028 January 1993 Notification of Significant Licensee Meeting W/Util on 930226 to Discuss QA Audit Issues & Licensee Action Plan in Response to Salp,Nrc Insp Rept 50-298/92-99 1999-08-27 |
Inspection Report - Cooper - 1993028 | |
---|---|
Text
. - _ _ _ _
'
90 cec og UNITED STATES e, g NUCLEAR REGULATORY COMMISSION
,
3- E
<
REolON IV n 611 RYAN PLAZA DRIVE, SUITE 400 o $*
<
', 8 ARLINGTON, TEXAS 76011-8064
.....
JAN I 91994 ,
NOTICE OF SIGNIFICANT LICENSEE MEETING f Name of Licensee: Nebraska Public Power District
,
Name of Facility: Cooper Nuclear Station (CNS)
Docket No.: 50-298 .
t
! Date and Time January 24, 1994 i l of Meeting: 1 p.m. (CST)
Location of Meeting: NRC Region IV office, Arlington, Texas Training Conference Room, 4th floor Purpose of Meeting: Enforcement Conference to discuss apparent violations identified in NRC Special Inspection Report 50-298/93-28 l
!
NRC Attendees: J. Callan, Regional Administrator J. Montgomery, Deputy Regional Administrator A. Beach, Director, Division of Reactor Projects (DRP)
T. Gwynn, Director, Division of Reactor Safety J. Gagliardo, Chief, Project Section C, DRP R. Kopriva, Senior Resident Inspector, DRP E. Collins, Project Engineer, DRP W. Brown, Regional Counsel !
G. Sanborn, Enforcement Officer l Licensee Attendees: G. Horn, Nuclear Power Group Manager i J. Meacham, CNS Site Manager l R. Gardner, CNS Plant Manager G. Smith, Manager, Nuclear Licensing & Safety K. Walden, Manager, Nuclear Configuration Management R. Krause, Senior Maintenance Engineer l T. Poindexter, Legal Consultant
!
l NOTE:
(1) Attendance by other NRC personnel at this meeting should be made known by COB on January 21 via telephone call to Elmo Collins at 817/850-829 PDR ADOCK 05000290 .
.
G PDR j
__ ._ ___ _ _ _ . _ . . - _ . . . _ _ _ _ _ - . .
.
'
.
.
Nebraska Public Power District -2- JAN I 91994 (2) Due to the nature of the subject matter, this meeting is not open to attendance by members of the general publi I f Approved By: ; kamc X/3ill Beach, Director
[nvision of Reactor Projects
_
.
P
,
Nebr,aska Fublic Power District -3-Distribution:
DMB (IE 45) N%
J. H. Sniezek, EDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 12D1)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, 0GC (MS 15B18)
K. Connaughtr i, Project Manager, NRR OEDO RIV Ciora 7ator (MS 17G21)
C. A. Hackn:y. RSLO J. Gilliland, PAO, RIV NRC Attendees (E-Mail only)
RA Secretary Carol Gordon Division Secretary (DRP, DRS)
L. S. Ousley RIV File i
l
,
en