IR 05000298/1993028
| ML20059J080 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/19/1994 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9401310342 | |
| Download: ML20059J080 (3) | |
Text
.
- _ _ _ _
'
UNITED STATES 90 cecog NUCLEAR REGULATORY COMMISSION e,
g
,
3-E REolON IV n
<
$*
611 RYAN PLAZA DRIVE, SUITE 400 o
',
ARLINGTON, TEXAS 76011-8064
<
.....
JAN I 91994
,
f NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:
Nebraska Public Power District
,
Name of Facility:
Cooper Nuclear Station (CNS)
Docket No.:
50-298
.
t
!
Date and Time January 24, 1994 i
l of Meeting:
1 p.m. (CST)
Location of Meeting: NRC Region IV office, Arlington, Texas Training Conference Room, 4th floor Purpose of Meeting:
Enforcement Conference to discuss apparent violations identified in NRC Special Inspection Report 50-298/93-28
!
NRC Attendees:
J. Callan, Regional Administrator J. Montgomery, Deputy Regional Administrator A. Beach, Director, Division of Reactor Projects (DRP)
T. Gwynn, Director, Division of Reactor Safety J. Gagliardo, Chief, Project Section C, DRP R. Kopriva, Senior Resident Inspector, DRP E. Collins, Project Engineer, DRP W. Brown, Regional Counsel G. Sanborn, Enforcement Officer Licensee Attendees:
G. Horn, Nuclear Power Group Manager i
J. Meacham, CNS Site Manager R. Gardner, CNS Plant Manager G. Smith, Manager, Nuclear Licensing & Safety K. Walden, Manager, Nuclear Configuration Management R. Krause, Senior Maintenance Engineer l
T. Poindexter, Legal Consultant
!
l NOTE:
(1) Attendance by other NRC personnel at this meeting should be made known by COB on January 21 via telephone call to Elmo Collins at 817/850-8291.
9401310342 940119 PDR ADOCK 05000290
.
.
G PDR j
.
.
.. -
...
-..
.
'
.
.
Nebraska Public Power District-2-JAN I 91994 (2) Due to the nature of the subject matter, this meeting is not open to attendance by members of the general public.
I f
kamc Approved By:
X/3ill Beach, Director
[nvision of Reactor Projects
_
.
P
,
Nebr,aska Fublic Power District-3-Distribution:
DMB (IE 45) N%
J. H. Sniezek, EDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 12D1)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, 0GC (MS 15B18)
K. Connaughtr i, Project Manager, NRR OEDO RIV Ciora 7ator (MS 17G21)
C. A. Hackn:y. RSLO J. Gilliland, PAO, RIV NRC Attendees (E-Mail only)
RA Secretary Carol Gordon Division Secretary (DRP, DRS)
L. S. Ousley RIV File i
,
en
-
-
-
-
.