IR 05000298/1993017
| ML20058E466 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 11/30/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 9312070024 | |
| Download: ML20058E466 (39) | |
Text
l
"
>
,
(
,
NUCLEAR REGULATORY COMMISSION
'j
_,j,
REGION 4V j
c
[
611 A Y AN PL AZA DFilVE. SW1 E 400 g
.. : 4 g AHUNGTON TCXAS 4 011-8064
.
i
!
NOV 3 0 933 l
' " *
i'
l Docket:
50-298 License: DPR-46 I
,
i Nebraska Public Power District ATTN: Guy R. Horn, Vice President - Nuclear P.O. Box 98
!
Brownville, Nebraska 68321 SUBJECT: PUBLIC MANAGEMENT MEETING ON NOVEMBER 23, 1993
,
This refers to the public meeting conducted, at NRC's request, in the Region IV Office on November 23, 1993. The meeting was attended by those listed in Enclosure 1.
,
i s
The subjects discussed at this meeting included:
(1) the Operating Experience
!
Review Program, (2) upgrade status of the Corrective Action Program, and
'
(3) an overview of the recent NRC Operational Safety Team Inspection (OSTI) at Cooper Nuclear Station. Enclosure 2 of this letter is a copy of your l
l presentation slides (for NRC distribution only).
[
It is our opinion that this meeting was beneficial and has provided our staff i'
with a better understanding of your programs and your efforts to address the shortcomings identified by the NRC in Inspection Report 50-298/93-17. The NRC i
staff will monitor the results of your implementation of these efforts during i
l future inspections.
l'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in l
l the NRC's Public Document Room.
[
Should you have any questions concerning this matter, we will be pleased to
l discuss them with you.
\\
Si,ncerely,
-
V!
i l
bI )}awV
-[
/
I
'A.
Bill Beach, Director Division of Reactor Projects l
c t'
,
Enclosures:
1.
Attendance List
!
2.
Licensee Presentation l
!
I /
,
.
9312070024 931130
/g-
-l
'
PDR ADOCK 05000298 t
PDR, y
l J
{
!
-l
,
.-
-
-_
--
_
- -.
.-
-
.
t
-
!
!
"
Nebraska Public Power District-2-
-3 0 1993 i
!
l l
I cc w/ Enclosure 1:
Nebraska Public Power District ATTN:
G. D. Watson, General Counsel P.O. Box 499
!
Columbus, Nebraska 68602-0499 i
!
Nebraska Public Power District
-!
ATTH: Mr. David A. Whitman
,
P.O. Box 499 i
Columbus, Nebraska 68602-0499
[
Nebraska Department of Environmental Control
!
ATTN:
Randolph Wood, Director P.O. Box 98922 Lincoln, Nebraska 68509-8922
,
r Nemaha County Board of Commissioners
!
ATTN: Larry Bohlken, Chairman Nemaha County Courthouse 1824 N Street Auburn, Neb-aska 68305
,
f Nebraska Department of Health
!
!-
ATTN: Harold Borchert, Director j
Division of Radiological Health i
'
301 Centennial Hall, South
'
P.O. Box 95007 Lincoln, Nebraska 68509-5007 l
l Department of Natural Resotarces
!
ATTN: Ronald A. Kucera, Department Director i
of Intergovernmental Cooperation l
P.O. Box 176 i
Jefferson City, Missouri 65102 l
Kansas Radiation Control Program Director
!
t
!
,
!
!
!
I
!
-
l
^
!
j f
l
!-
I I
'
i i
!
. - _.
_ _
.
-
i
.
)
,
.
Nebraska Public Power District-3-fGI 3 01993 i
!
!
cbec to DMB (IE45)
!
bcc distrib. by RIV:
l J, L. Milhoan Resident Inspector
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503
!
MIS System DRSS-FIPS
Section Chief (DRP/TSS)
Project Engineer (DRP/C)
l RIV File
.
Senior Resident Inspector - River Bend i
Senior Resident Inspector - Fort Calhoun i
!
!
!
!
t
!
t i
!
!
!
!
l
,
!
!
!
>
$
I
!
i
-
RIV:(j1QRP/C OthRP JGaglikrdo;df ABhekch II/9/h3 II/t /93 i
i L: R.. O f.' : p
!
c
.
i
_.
.
. - -
__
__
_ -. _
'
,
i i
Nebraska Public Power District-3-NOV 3 01993 l
.
.,
bec to DMB (IE45)
j bec distrib. by RIV:
J. L. Milhoan Resident Inspector
.
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503 l
MIS System DRSS-FIPS j
Section Chief (DRP/TSS)
Project Engineer (DRP/C)
RIV File Senior Resident Inspector - River Bend L
.
Senior Resident Inspector - Fort Calhoun
i
I
i
,
!
!
I i
!
"
!
!
i l
a
!
<
!
,
t
'
l i
!
'
!
>
?
]
!
!
'
RIV:(AQRP/C DfhRP
!
'
JGaglik,rdo;df ABBekch
II/b)/93 11/t/93 i
,.
>
l I
!
!
'
i
!
~
!
f
,,... _ -. -
.. -..
_
- - -.
.
)
.-
.-.
.
...
.
I
-
,
P
-
!
Enclosure I
!
ATTENDANCE LIST
!
t Nebraska Public Power District i
G. Horn, Vice President, Nuclear l
J. Meacham, Senior Nuclear Division Manager of Safety Assessment t
D. Whitman, Division Manager of Nuclear Support
!
E. Mace, Senior Manager of Site Support
C. Moeller, Technical Staff Manager
I NRC i
!
J. Montgomery, Deputy Regional Administrator, Region IV i
T. Gwynn, Deputy Director, Division of Reactor Projects, Region IV
!
.
A. Howell, Deputy Director, Division of Reactor Safety, Region IV i
C. Thomas, Acting Deputy Director, Division of Radiation Safety and
Safeguards, Region IV W. Beckner, Director, Reactor Projects Directorate IV-1, NRR
J. Wilcox, Team Leader, OSTI
,
J. Gagliardo, Chief, Project Section C, Division of Reactor Projects,
[
Region IV i
C. Hackney, Regional State Liaison Officer, Region IV l
W. Jones, Assistant Team Leader, OSTI
!
-
H. Bundy, Reactor Inspector, Division of Reactor Safety, Region IV
..
-
t
>
.
,
t I
?
h
i
!
!
!
-:
[
._.._.,
.
. -.
?
EtiCLOSURE 2 NRC/NPPD MANAGEMENT MEETING NOVEMBER 23,1993 BG
,
,
,
.,
_.., _,. _
-,.
.
.
. -. - -., -. -..
.
...
.
.
._
..,..
.
_ _
_
_
.
_
- r l
NRC/NPPD MANAGEMENT MEETING
'
November 23,1993 Opening Remarks Guy R. Horn Operating Experience Review Program John M. Meacham Corrective Action Program Upgrade Status Chris R. Moeller NRC OSTI Overview Eugene M. Mace Comments / Questions All BG
..
,...
CNS OPERA TING EXPERIENCE PROGRAM John M. Meacham Senior Nuclear Division Manager of Safety Assessment BG
-
.
.
..
.
..
r b
EL i:
INTRODUCTION e
History Purpose and Scope e
Process Description e
e Effectiveness Assessment e
Findings
Action Plan e
Summary N
.
..
.
.
r HISTORY OF THE CNS OER PROGRAM
Pre-TMI Period e
Post-TML Period OER Program Formalized - 1984 o
OER Program improved - 1986
"INPO" Upgrade of OER Program - 1992 e
e Effectiveness Review - 1993 N
-
-
.
.
.
PURPOSE AND SCOPE
Purpose To ensure industry experience is disseminated and acted upon
-
within CNS.
-
To ensure that lessons learned are applied at CNS to promote safe operation, proper maintenance and pro-active management activities.
i
!
N I
i
..
. -
_
-.--
.
...
-
-
, -
.
.
...
. - -
...
-
-
-
.
.
.
..
. -..
PURPOSE AND SCOPE (Cont'd)
e Scope INPO Information
-
Vendor Bulletins
-
NRC Information
-
N
..
..
cr APPLICABLE CNS PROCEDURES 0.10, industry And in-House Operating Experience Review Programs 0.10. 7, Operating Experience Review 0.10.2, Operating Plant Experience Report 0.10.3, Industry Operating Experience Program Effectiveness Review H
.
.
-
-.
.
.-
.
O e
.
SIMPLIFIED OER PROCESS DESCRIPTION DOCUMENT CNS TECHNICAL ACTION ORGANIZA TION CONT'D RECEIPT STAFF REVIEW EVALUA TION INFORMATIONAL ROUTING 1.NRC 1. APPLICABILITY TO 1. DETAILED TECHNICAL CNS EVALUA TION 2. INPO 2. ACTION ASSIGNMENT 2. DEVELOPS CORRECTIVE 3. VENDORS AND INFORMA TIONAL ACTION STRA TEGY ROUTING 3. TAKES OR PROPOSES 3. ACTION ITEM ACTION TRACKING H
.
.
.
pw.
SIMPLIFIED OER PROCESS DESCRIPTION CNS TECHNICAL CNS TECHNICAL STAFF STAFF REVIEW TRACKS TO CLOSURE INFORMA TIONAL ROUTING 1. ADEQUACY OF 1. A CTIONS TRA CKED TO EVALUATION AND FINAL CLOSURE ACTION PROPOSED OR TAKEN 2. TRANSMITTAL TO RECORDS 2. FURTHER ACTION ASSIGNMENT 3. ACTION ITEM TRACKING H
.
.
.
.
.
..
_-
OER PROGRAM EFFECTIVENESS ASSESSMENT Supplement to previous review of past documentation.
e e
Performed by CAPOG Members.
Sampled documents from previous two year period.
e N
-
-
-
.
'
-
-
OER PROGRAM EFFECTIVENESS ASSESSMENT
(Cont'd)
.
e Assessment included:
59 Information Notices 3 INPO Good Practices 12 Vendor Information Iterns l
5 INPO Operations and Maintenance Reminders 17 RICSILs/SILs
_22 INPO Significant Event items 118 Totalitems Responses were reviewed for completeness and accuracy.
e M
.
.
.
.
.
_.
,,..
.m.
.
OER PROGRAM EFFECTIVENESS ASSESSMENT FINDINGS Findings included inadequate responses on:
7 Information Notices 4 Significant Event items 1 INPO Good Practice All have been re-assigned for re-evaluation.
- N
'
_
-
_
_.
.-
,
-
"'
~. -. _
IT CAPOG OER EFFECTIVENESS REVIEW SUMMARY ITEM TOPIC PROBLEM PROGRAM NEED INDIVIDUAL NEED INFOGP 92-010 Self Checking Did not respond to Assignment and Program all specific items critical review Training SEN 88 Failure of main turbine to trip Shallow response Critical review Diligence
.
SER 13-93 Reversed excore detector signals Shallow response Critical review Technical Training SER 16-92 Loss of Control Room annunciators Shallow respense Critical review Program Training
SOER 92-01 Improved human performance Misunderstood Assignment Program responsibilities review Training IN 86-014, S2 AFW overspeed trips Misunderstood Assignment Program responsibilities review Training
_
IN 88-092, S1 Fuel pool inventory loss Shallow response Critical review Program Training IN 91-012 SLC NPSH Shallow response Critical review Technical Training IN 92-052 Building seals between environments Shallow response Critical review Program Training
IN 92-057 Shroud support radial cracks Shallow response Critical review Technical Training IN 92-067 Mod deficiencies for' Hiller Actuators Shallow response Critical review Program Training i
IN 93-025 Electrical penetration leakage Did not respond to Critical review Program all specific items Training l
,
i l.
~+,ms.-,+..-,c
,, ~,,.
-..-m...-,-m,
.... _ _ _,,,..
,,,_..._._,...,,,,,%,.,_,.,,m._,._
,,,._,,m.__
, ____ _,., _ _,
,. _ - _ _,,. _, _,,. _ _..,
,,,,
, _ _ _ _.
.
.
...%-
OER PROGRAM EFFECTIVENESS ASSESSMENT FINDINGS (Cont'd)
Root causes included:
Shallow responses (8 of 12 indications, predominant cause)
-
Misunderstood responsibilities (2 of 12)
-
Did not respond to allitems (2 of 12)
-
H
-
-
-
-
--
-
.
,
--,e, i
OER PROGRAM EFFECTIVENESS ASSESSMENT ACTION PLAN For documents reviewed in the past:
o Perform additional reviews.
- Evaluate data / decide if further review is warranted.
- Complete by February 1994.
N
-
-
--
-
.
.
.
.
.
w -
-
s
- +, _,,
OER PROGRAM EFFECTIVENESS ASSESSMENT ACTION PLAN (Cont'd)
For future program activities:
im lem nt the l ssons learned from the CAPOG effectiveness review e
p e
e
.
e independently review the OER Program.
Resources allocated to program are being assessed.
e BG
.
.,p-m_,,
w
,
-, - - -
,., - -,
-e-.
-
m
,
---w g
+-m r
. -,
w
-, -.
-,,., -
+----
.,
_
_._
SUMMARY OER Program is an integral part of our business.
e Weaknesses exist in the OER Program and are being addressed.
- Data reviews are continuing and program improvements are being e
pursued.
Periodic effectiveness reviews will be enhanced and will continue.
e H
.
.
.
COOPER NUCLEAR STA TION
_C_ORRE_CTlVE ACTlON_ PROG _BAM
-
UPGRADE STA TUS NO VEMBER 23,1993 Chris R. Moeller Technical Staff Manager BG
-
-.a FOCUS OF PRESENTA TION
,
ENHANCEMENTS TO CORRECTIVE ACTION PROGRAM (CAP) TAKEN TO o
ADDRESS IDENTIFIED WEAKNESSES:
- LACK OF PROBLEM OWNERSHIP AND ACCOUNTABILITY
- FRAGMENTED, NOT USER FRIENDL Y, CONFUSING THRESHOLDS
- RIGID PROGRAM AND INEFFICIENT UTILIZA TION OF RESOURCES
- LACK OF DA Y-TO-DA Y MANA GEMENT INVOL VEMENT
- EXCESSIVE OVERVIEW H
_
-
.
._ _
CORRECTIVE ACTION PROGRAM ENHANCEMENTS
\\
l I
INTEGRATED PROGRAM DESIGN e
- THE CONDITION REPORTING (CR) PROGRAM WILL ENCOMPASS MANY EXISTING CORRECTIVE ACTION PROGRAMS:
NCR/DR PROGRAMS RSIR/RDR PROGRAMS GA FINDINGS AND OBSERVATIONS CHEMISTRY OUT-OF-LIMIT REPORTING DRILL DEFICIENCIES AND WEAKNESSES SELF ASSESSMENT RECOMMENDA TIONS BENEFITS:
1. ELIMINATES PROGRAM-TO-PROGRAM INTERFACES / WEAKNESSES 2. ASSURES CONSISTENCY IN PROBLEM RESOLUTION
,
BG
_
.
..____-_.-_-A__
-.-..--
-_._-___m-_
_. - _ - _ -. _
__-__-mm.-..--_m___..w
'
-
-
-
.. -
.
h CORRECTIVE ACTION PROGRAM ENHANCEMENTS INTEGRA TED PROGRAM DESIGN (CONT'D)
e
- CR FORM INTEGRA TED WITH WORK ITEM FORM B_ENEFITS:
1. ELIMINA TES HA VING TO WRITE UP PROBLEM TWICE 2. ENSURES ALL EQUIPMENT DEFICIENCIES ARE REVIEWED IN CAP 3. PROMOTES WORKER FAMILIARITY WITH CAP WHICH WILL RESUL TIN MORE NON-EQUIPMENT DEFICIENCIES REPORTED BG
_
-
.
. - _.
..
CORRECTIVE ACTION PROGRAM ENHANCEMENTS e
WilLTIPLE CATEGORIES FOR PROBLEM CLASSIFICATION CA TEGORY 1 - MOST SIGNIFICANT; REQUIRES TEAM EVALUA TION AND SENIOR MANAGER LEVEL APPROVAL CATEGORY 2 - SIGNIFICANT CONDITIONS ADVERSE TO QUALITY; REQUIRES ROOT CAUSE EVALUA TION AND MANAGER APPROVAL CA TEGORY
CONDITIONS AD VERSE TO QUALITY; REQUIRES
-
EVALUA TION TO ASSESS CONCERNS AND MANAGER APPROVAL CA TEGORY 4
-
TREND ONLY; NO ADDITIONAL FORMAL ACTION REQUIRED BEYOND THATIN PROGRESS CATEGORY 5 - NO ADDITIONAL FORMAL ACTION REQUIRED BEYOND THA T IN PROGRESS N
.
-
-
-
.
r a
CORRECTIVE ACTION PROGRAM ENHANCEMENTS e
MULTIPLE CATEGORIES FOR PROBLEM CLASSIFICATION (CONT'D)
BENEFITS:
1. ALLOWS PRIORITIZA TION AND FLEXIBILITY TO MA TCH RESOURCES WITH SIGNIFICANCE 2. " TREND ONL Y" CA TEGORY:
- ACCOMMODATES NON-CONSEQUENTIAL HUMAN ERRORS
- PROVIDES EARL Y WARNING OF POTENTIAL PROBLEMS 3. "NO ADDITIONAL ACTION" CA TEGORY ELIMINA TES NEED FOR RIGID THRESHOLDS 4. ELIMINATION OF RIGID THRESHOLDS MAKES PROCESS MORE USER FRIENDL Y IN THE FIELD N
- -
-
-
--
-
-
-
.
.
_
.
.
M'
CORRECTIVE ACTION PROGRAM ENHANCEMENTS DAIL Y SCREENING BY CONDITION REVIEW GROUP (CRG)
- MANAGER LEVEL COMMITTEE CHAIRED BY PLANT MANAGER
- ASSIGNS CA TEGORY, RESPONSIBLE MANAGER, DUE DA TE B_ENEFITS_:
1. PRO VIDES DA Y-TO-DA Y MANA GEMENTIN VOL VEMENT AND A SSURES PROBLEM AWARENESS 2. REINFORCES MANAGEMENT EXPECTA TIONS AND HEIGHTENS ACCOUNTABILITY 3. DEMONSTRA TES THA T CAP IS NOT "NRC PROGRAM" N
.
..
. -....
-_
._-
CORRECTIVE ACTION PROGRAM ENHANCEMENTS RESPONSIBLE MANAGER / SINGLE OWNER CONCEPT
- RESPONSIBLE MANAGER ASSIGNED BY CRG, OWNER ASSIGNED BY MANAGER
- MAINTAINS OVERALL RESPONSIBILITY FOR PROBLEM BENEFITS _:
1. ESTABLISHES OWNERSHIP AND ACCOUNTABILITY 2. IMPROVES OVERALL QUALITY OF FINAL PRODUCT 3. REDUCES NEED FOR EXCESSIVE OVERVIEW BG
-
=
-
..
.
.
.
-
.
?i spff n't CORRECTWE ACTION PROGRAM ENHANCEMENTS ENHANCED ROOT CAUSE PROGRAM e
- PATTERNED AFTER SONGS
- BEING DEVELOPED BY FPI BENEFITS:
1. PRODUCES EFFECTIVE CORRECTIVE ACTIONS AND MINIMlZES POTENTIAL FOR RECURRENCE 2. REDUCES NEED FOR EXCESSIVE OVERVIEW 3. PROVIDES BASIS FOR EFFECTIVE TREND PROGRAM N
.-
-
.
..
-
e
.,
gn
%
CORRECTIVE ACTION PROGRAM ENHANCEMENTS CORRECTIVE ACTION REVIEW BOARD (CARB)
e
- REQUIRED FOR CATEGORY 1 CRs
- MANAGER LEVEL COMMITTEE CHAIRED BY COGNIZANT SENIOR MANAGER
- ASSESSES ADEQUACY OF EVALUATION AND CORRECTIVE ACTIONS BENEFITS; 1. PROVIDES MANAGEMENT INVOL VEMENT AND COMMITMENT IN RESOLUTION OF SIGNIFICANT PROBLEMS 2. MAINTAINS ACCOUNTABILITY l
l 3. REDUCES NEED FOR EXCESSIVE OVERVIEW
!
M
-
_
_ _ _.
.....
-
.
CORRECTIVE ACTION PROGRAM ENHANCEMENTS e
ADDITIONAL ENHANCEMENTS:
1. OPERA TIONS SCREENING - TIMEL Y REVIEW TO INTEGRA TE OPERABILITY AND REPORTABILITY 2. FORMAL CORRECTIVE ACTION PLAN - REQUIRES ACCEPTANCE BY ASSIGNED DEPARTMENT TO STIMULA TE INTERDEPARTMENTAL COMMUNICA TION 3. EXPANDED TRENDING CODES-WILL ENHANCE TRENDING CAPABILITY 4. IMPRO VED FEEDBA CK TO ORIGINA TOR - FEEDBA CK PRO VIDED AFTER CRG SCREENING AND UPON CLOSURE N
-
--
'
'
._
,,
CORRECTIVE ACTION PROGRAM UPGRADE DEVELOPMENTAL INPUTS:
- PREVIOUS NRC INSPECTION REPORTS
- CORRECTIVE ACTION PROGRAM SELF ASSESSMENT e PROGRAM PROCEDURES FROM NUMEROUS OTHER PLANTS
- SITE VISITS TO THREE OTHER PLANTS e STEERING COMMITTEE
- INDUSTRY EXPERTS
- MANAGER / SUPERVISOR WORKSHOP (TO BE CONDUCTED)
l l
l N
=
__
,,
CORRECTIVE ACTION PROGRAM UPGRADE SUMMARY NUMEROUS PROGRAM ENHANCEMENTS:
- INTEGRATED PROGRAM DESIGN
- MATCHES SIGNIFICANCE AND RESOURCES e MANAGEMENT INVOL VEMENT
- PROBLEM OWNERSHIP AND ACCOUNTABILITY STRESSED ENHANC_EMENTS BAS _E_D_ ON DIVERSE INPUTS:
- PAST FAILURES
- INDUSTRY EXPERIENCE e PEERS l'
N
.
.=
.
.
.
CORRECTIVE ACTION PROGRAM UPGRADE IMPLEMENTA TION EFFECTIVENESS e
EFFECTIVENESS REVIEW
ENHANCED TRENDING AND FEEDBACK
SAFETY ASSESSMENT / OVERVIEW H
-
-
.
-,.. - -
.
..
NRC OSTI OVERVIEW Eugene M. Mace Senior Manager of Site Support
,
N
.
._
.
,,,
- -
.
!
I
- '
7.+..;p c }c6
'
.,
s
..
. ;.,
- 8 a
,
?y JA +(y Z( -
y
_. ;tn?gsy;q
, er;-~8 44;yg
...irJ4f & 6"geir s
OSTI OVERVIEW
- x6?idt ysaw maps ci /..*) 3' ~
.
-,,
Overview of the issues
- %%
.
. sup<a.
.
OSTI Experience i_
j..,)
' %:. 4 T,
e
.
e Plan of Action
Conclusion H