9.2 (Closed) LER 298/92-15:
Initiation Reactor Isolations Following a Manual
!
.
This LER documented the initiation of engineered safety features during a
,
normal shutdown from power. On September 11, 1992, during a normal shutdown
from power, the reactor was scrammed at 22 percent power. During the water i
level drop inside the reactor associated with the scram, water level fell
below the low level setpoint of 4.5 inches, causing the following systems to l
isolate; primary containment, reactor water cleanup, and secondary
containment.
The licensee determined that the root cause of the event was an inadequate
!
I procedure for controlling the alignment of the feedwater pump and valves i
during a noimal shutdown of the plant. The procedure failed to specify the
!
alignment to be used to raise water level prior to initiating a manual scram.
The licensee's corrective actions include:
I Procedure 2.1.4, " Normal Shutdown From Power," and 2.2.28.1, "Feedwater
"
e System Operator," were revised to provide improved instructions for system alignments and operational guidance in support of a manual scram
,
at various power levels during shutdown operations.
'
Training for licensed control room personnel was provided which reviewed i
,
operating procedure revisions to provide better guidance for operator
!
control of vessel level during a controlled plant scram / shutdown.
'
The inspector reviewed documentation for the completion of the corrective i
actions taken by the. licensee. Based on the review performed by the l
inspection. it appeared the licensee had taken appropriate actions to preclude
'
repetition of this event.
>
,
4 l
l
!
!
^
,
!
9307130118 930702 PDR ADDCK 05000293
O PDR
.
,
.
..
-.
..
.
.
-
-
..
.
..
.
-
-
- -.
.,.
._
.
.
.
_ _ - _ _ - _ _ _ - _
-
l i
Nebraska Public Power District-3-
- E ~2 t-t f
bcc to DMB (IE01)
{
t bcc distrib. by RIV:
J. L. Milhoan Resident Inspector
!
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503
'
MIS System DRSS-FIPS Section Chief (DRP/TSS)
Project Engineer (DRP/C)
RIV File Senior Resident Inspector - River Bend
Sr. Resident Inspector - FCS A. Bill Beach, D:DRP
'
.
I I
,
I
,
,
RIV:C:DRPfG
[DRP
~
JGaglia'[do;df A%each j