Forwards IE Insp Rept 50-293/82-24 on 820907-1018 & Notice of Deviation
ML20028B060
Person / Time
Site: Pilgrim
Issue date: 11/12/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20028B061 List:
References
NUDOCS 8211290414
Download: ML20028B060 (2)


Text

{{#Wiki_filter: e 'y ., 'i UNITED STATES .c g !' P % NUCLEAR REGULATORY COMMISSION $ E

REGION I

, b /'[[ 631 PARK AVENUE t AO

KING OF PRUSSIA. PENNSYLVANIA 19406 %,

, ..... Docket No. 50-293 NOV 12 1982 Boston Edison Company M/C Nuclear ATTN: Mr. William D. Harrington Senior Vice President, Nuclear 800 Boylston Street Boston, Massachusetts 02199 Gentlemen: Subject: Inspection 50-293/82-24 This refers to the routine safety inspection conducted by Mr. J. Johnson of this office on September 7 - October 18, 1982, at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35 and to the discussions of our findings held by Mr. Johnson with Mr.

C. Mathis and other members of your staff periodically during the inspection and at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I inspection report enclosed with this letter. Within these areas, the in-spection consisted of selective examinations of procedures and representa-tive records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you had taken to correct the violation brought to your attention in a letter dated November 25, 1981.

We have no further questions regarding the steps you took to correct Item A(2).

Within the scope of this inspection, no violations were observed. However, one activity appears to be a deviation from your commitment to the NRC contained in a letter dated January 15, 1982, concerning actions that would be taken regarding the revision of procedures relating to liquid radioactive discharges (item 81-19-01 described in Detail Paragraph 2 of the enclosed inspection report). You are requested to respond to this item; and, in preparing your response, you should follow the instructions in Appendix A.

The responses directed by this letter are not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

P OFFICIAL RECORD COPY L B211290414 821112-i I / / PDR ADOCK 05000293 v G PDR

.. , i Boston Edison Company M/C

NOV 121982 Nuclear In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will be placed in the NRC Public Document Room, unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter. Such application mu::t be consistent with the require-ments of 2.790(b)(1).

Your cooperation with us in this matter is appreciated.

Sincerely, Original Signed By: Richard W. Starostecki, Director Division of Project and Resident Programs Enclosures: 1.

Appendix A, Notice of Deviation 2.

NRC Region I Inspection Report No. 50-293/82-24 cc w/encls: J. N. Bonsall, Chaiman, Department of Public Utilities J.

T.. Howard, Vice President Nuclear C. J. Mathis, Pilgrim Station Manager i

A. V. Morisi, Manager, Nuclear Operations Support Department Joanne Shotwell, Assistant Attorney General ' l Plymenth Board of Selectmen . Public Document Room (PDR) ! LocalPublicDocumentRoom(LPDR) Nuclear Safety Information Center (NSIC) NRC Resident Inspector Commonwealth of Massachusetts (2) Senator Edward P. Kirby bec w/encls: ! Region I Docket Room (w/ concurrences) l Chief,OperationalSupportSection(w/oencis)

Ri:DPRP h RI:DPRP RI: PRP RI:hPRP b Johnson /jf Elsa ser Brunner Starostecki NO f7[P' 0FFICIAL RECORD COPY }}