U. S NUCLEAR REGULATORY COMMISSION
REGION I
Report No. 50-293/82-15 Docket No. 50-293 License No. DPR-35 Safeguards Group IV Licensee: Boston Edison Company
.
25 Braintree Hill Office Park Braintree, Massachusetts 02184 Facility Name: Pilgrim Nuclear Power Station Inspection At: Plymouth, Massachusetts Inspection Conducted:
May 11-12, 1982 Date of Last Material Control and Accounting Inspection:
March 7, 1980 Type of Inspection: Unannounced Material Control and Accounting
\\
!
__
Inspector:
V Q uat 1. l W L
. Cohen, Chemist date Approved by:
.
A. T. Gody, CEief, uards Section, date Technical Program anch
_ Inspection Summary: Unannounced Inspection on May 11-12, 1982 (Inspection Report No. 50-293/82-15)
J Areas Inspected:
Routine inspection of nuclear material control and accounting by a regional based inspector including; Organization; Operations; Storage and Internal Controls; Records and Reperts, Fission, Transmutation, and Decay of SNM; Inventory and Inventory Verification; and Procedure Manual.
The inspection involved 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> onsite by one NRC inspector and was begun during regular hours.
Results: The licensee was found tc be in compliance with NRC requirements in the areas examined during the inspection.
THE INFORMATION ON THIS PAGE IS DEEMED TO BE APPROPRIATE S-F1-82-98 FOR PUBLIC DISCLOSURE DURSUANT TO 10 CFR 2.790 Copy of Copies
'
THE REPORT DETAILS CONTAIN 10 CIR 2.7901NF0EMATION l
8206220309 820604 PDR ADOCK 05000293
.
_ _ _ _.
. _ _
_ _ _ _ _ _
, _ _ _ _ _ _ _ _ _ _ ___
_
_ _, _
_
_ _ _ _ _
___.