Insp Rept 50-289/73-26 on 731213-14.No Noncompliance Noted. Major Areas Inspected:Containment Bldg Test Tensioning, Containment Liner Plate Welding Matl & Reactor Coolant Bleed Tank Welding Matl Control
ML19256D418
Person / Time
Site: Crane 
Issue date: 01/09/1974
From: Tillou J, Varela A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19256D415 List:
References
50-289-73-26, NUDOCS 7910180762
Download: ML19256D418 (6)


Text

>!3

.

'

~

-

')1

.

I

.

d U. S. ATOMIC ENCRGY C0h?!ISSION

,9-

!

DIRECTORATE OF REGULATORY OPERATIONS O

)

rec 10N 1

.

s

\\

',l RO Inspection Report No.: 50-289/73-26

\\

Docket No.: 50-289

'!

Licensee:

Metropolitan Edison Company License No.:CPPR-4

P.O. Box 542

.

Priority:

,.;

Reading, Pennsylvania 19603 B

Category:

=i

't

,

Location:

Middletown, Dauphin County, Pennsylvania

.

I

'

Type of Licensee:

PWR:871 MWe (B&W)

i

-)

Type of Inspection:

Routine, Unannounced December 13-14, 1973 Dstes of Inspection:

Dates of Previous Inspection:

_

O Reporting Inspector:

I

/*

/ - 7-- 7 /

-

.,

l ANE.(Varela,ReactorInspector Date

""

Acco.npanying Inspectors:

-!

Date i

l i

l Date None Other Accompanying Personnel:

i e,

-

i

Reviewed By:

M N /,*u,.,,_ M

/, f_ yg

,

J. E, Tillou, Senior ctor Inspector Da't e

!

1449 J81 c

1910180 7 7

-

____-_._____7.t_.___.---

.,

--

.y

..,..,.

.

.

me--

.. _ - -

--

---

- - - - ~

-

-~

"~

~~

-2-

,

I l

'

t i

United Engineers & Contractors (UE&C)

'

'I V. E. Cichocki, Quality Assurance / Quality Control Coordinator R. L. Hawkins, Quality Assurance / Quality Control Coordinator

.

.}

f,)

D. C. Lambert, Quality Control Field Supervisor

F. F. Long, Quality Control Engineer

The following subjects were discussed:

J A.

Results of Containment Building Post Tensioning The inspector stated he had reviewed the subcontractor's report and engineering study of post tensioned tendons and found that the engineer-

.

ing evaluation supported acceptance of individual tendons elongated in i

excess of the five percent allowed by ACI 318-63.

l (Details Paragraph 2)

.;

The licensee acknowledged this without comment.

B.

.

Control of Welding Material Used in Containment Liner Plate Welding

.

The inspector stated that welding material control documentation for

.

the containment liner plate had been reviewed and indicated that the others, attested to satisfactory control of weld materia

t used in the construction of the containment liner.

(Details Paragraph 3)

The licensee confirmed that their QA surveillance maintained during con-the containment liner plate erection.struction had found no deficien 7-3 O

Control'of Welding Material Used in Reactor Coolant Bleed Tanks C.

The inspector stated that welding material control records for the reactor purchase, receipt, coolant bleed tanks had been reviewed and that the d control of the weld material issued and used during constru containment liner.

(Details Paragraph 4)

The licensee accepted this with the comment that one audit report on welding documented the corrective action taken during construction to establish completely acceptable control of welding material.

D.

Reactor Vessel Sole Plate Fabrication and Installation The inspector stated that he reviewed the vendor's fabrication records on the reactor vessel sole plates, site records on receipt and storage, and the constructor's installation records.

No deficiencies were id entified.

(Details Paragraph 5)

1449 082

-,_

.

.

..,

y.

.

..

.__

._._ _.

_Ed

_

_1_

_. _.. _ _ _

_

_

. _.

. _ _ _

<

=

_

-3-

,

The licensee accepted this without comment.

k E.

Reactor Coolant Bleed Tank Record Deficiency

^

f]

The inspector stated that he reviewed the as-built construction drawings

for the reactor coolant bleed tanks and could find no correlation be-

'

tween the welds and the responsible welder's.

(Details Paragraph 6)

The licensee replied that this will be investigated to assure that complete documentation is available for the inspector's review at a sub-sequent inspection.

,,

tie inspector replied that this would remain an open item.

.i

,

l-b

-

.

l 1449 J83

.

-

.

$

\\..j

.

$

e f

.

s a

m e-

.

~-w-

.

--,

--.==+

-e.am*

- - - +

=-n

.e-

- - -

-

"

.

.

DETAILS

\\

-

i g

_

l.

Persons Contacted

GPUSC P. A. Levine, Quality Assurance Engineer S. Levin, Project Engineer Unit 1 G. L. Roshy, Quality Assurance Engineer M. J. Stromberg, Site Quality Assurance Auditor J. A. Vetter, Quality Assurance Engineer J. Wright, Resident Civil Engineer

,

,

UE&C M. Bedford, Assistant Job Engineer M. Beyers, Quality Control Engineer

V. E. Cichocki, Quality Assurance / Quality Control Coordinator H. Finlan, Quality Control Engineer R. L. Hawkins, Quality Assurance / Quality Control Coordinator

,

D. C. Lambert, Quality Control Field Supervisor F. F. Long, Quality Control Engineer D. Mason, Job Engineer

!

J. Schmidt, Quality Control Records

2.

Results of Containment Building Tendon Tensioning i

The prestress subcontrator's final report was submitted October 16, 1973.

(.)

It contains a summary of individual vertical, dome and horizontal tendons in containment building for Unit 1.

The reasons for discrepancies in elongation in the tendons have been analyzed as required by ACI 318.

l The final review concludes that loss of prestress due to broken or out-j of-tolerance wires is below the value of one-half (1/2) percent as i

allowed in specifications.

The constructor, the A-E and the licensee j

have concurred in the corrective action, disposition and have signed off all deviation reports on tendon tensioning.

3.

Control of Welding Material Used in Containment Liner Plate Welding Procedure WRC-ll, Revision 3, of the containment liner plate contractor, Chicago Bridge and Iron Company (IB&I) dated 11/11/69 requires that records of all weld rod received and verified mill certificates be kept at the job site.

The RO inspector's review found good trace-ability without deficiency in these records. The CB&I procedure additionally states that supervisory personnel and quality control personnel only will have access to electrode storage and be re-sponsible for issuing electrodes.

CB&I's welding supervisor is responsible for issue and temperature control of E-7018 electrodes for selection of the proper rod and control of weld rods in the work area.

Documentation of these requirements at the time the containment liner plate welding was presented were not required by specifications nor by the CB&I procedure. However, the RO inspector verified by surveillance and audit reports that the requirements of the CB&I procedures were met

~

and no weld rod control deficiencies were found.

s k)

i

--

- -

.{

Fe

-

-5-

.

.

4.

Control of Welding Materici Used in Reactor Bleed Tanks

.

p Procedure DB 119-189, Revision dated 3/20/69, controlled the work on the g-)

reactor coolant bleed tanks fabricated at the site by the Pittsburgh-Des

Moines Steel Company (PDM).

The procedure requires that electrodes and s.

filler metal conforming to specific requirements be purchased in hermetical-

!

ly sealed containers from an approved supplier.

Procedural controls are established for issuance from containers, time out of container, holding oven temperature, and rebake temperature when electrodes are not dis-carded.

The RO inspector reviewed evidence that the specified electrodes were cbtained from an approved supplier, and that receiving inspection reports included chemical and physical test cerrifications for each order.

The job specifications and the PDM procedures in force at the time did not require that records be kept by PDM covering electrode issuance and field

,

-

control.

However, the RO inspector verified in audit reports by others that after some corrective action was taken, the specification and procedural re-quirements controlling the use of welding material were satisfactorily implemented, and no further deficiencies were identified.

,

}

5.

Record Review of Reactor Vessel Sole Plate Fabrication and Installation

'

i The reactor vessel sole plate and appurtenant :ardware was vendor fabricated i

by the Northern Steel Corporation (NSC) of Oswego, New York and machined

'

i by Simmons Machine and Tool Corporation (SMIC) of Albany, New York during 1970.

The following documentation was reviewed by the RO inspector and fcund to contain no deficiencies or non-conformancas.

(

-

~

A.

G!-lbert Associates drawings and specifications.

-

I /T B.

Purchase orders.

C.

UE&C manufacturer's facility survey of NSC and SMIC.

i D.

UE&C review and evaluation of NSC's QC system for:

l 1.

Welder and weld procedure qualification.

i 2.

NDT technicians'

qualification, NDT procedures and reporting of NDT results.

E.

PTL welder, weld procedure qualifications and NDT reports on work at NSC.

F.

UE&C final vendor inspection report dated 4/27/7'i and all work by NSC.

G.

UE&C vendor insper. tion report on machining by SMTC.

The segmented bearing plates', anchor bolts and plates, shear anchor plates with welded anchor, and the accompanying mill test reports and QC records for each were received at the site by UE&C, and noted in acceptance report No. 000029, 5/6/70 and No. 000030, 7/25/70.

formed by UE&C craftsmen.

Installation work was per-The following UE&C QC records were reviewed and found to contain no deficiencies or non-conformances.

1449 085

-

&

y,wy o

~-

m e-

,

y ~.

  • *

_

_._

-

.

., _ _ -. - - -

-~ -

~

<*ee, m

____

- ---

g

,

-6-i

.

-

a)

i; QC inspection reports covering the period from foundation

preparation in October 1969 thru equipacnt installation and

- 3 final grouting in November 1971

/~T

'

'

'

-

b)

s QC inspection report of 3/15/72 covering shear pin installation.

c)

QC inspection report of 4/14/72 on torquing of reactor vessel

!

anchor bolts.

!

6.

_ Reactor Coolant Bleed Tank Record Review and Deficiency The RO inspector reviewed PDM's QC systen, records and inspected the

completed work on the reactor coolant bleed tanks.

quirements for these assemblics are established in ASNE Section III.The

.

'

a)

Qualification of NDT techniques and technicians.

j b)

Identification of welder and NDT technician.

,i c)

Radiographic quality.

.

Records on weld saterial procurement,

.

and found to contain no deficiencies. storage and control were audited The RO inspector reviewed the completed work and QC records for the

-

reactor coolant bleed tanks.

No deficiencies were identified which indicated non-conformance with specified requirements of the purchase order or applicable ASHE Code.

.

The RO inspector observed no identification of qualified welders in

-_'

the. as-built records for the reactor coolant bleed tanks i '~

cord deficiency was identified at the management interview This re-

.

an open item to be taken up at the next inspection.