Insp Rept 50-289/73-18 on 731003-05.Noncompliance Noted: Failure to Follow Document Control Instructions During Issuance of Preoperational Test Procedure TP305/2
ML19256D477
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/18/1973
From: Brickley R, Brunner E, Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19256D471 List:
References
50-289-73-18, NUDOCS 7910180807
Download: ML19256D477 (9)


Text

{{#Wiki_filter:* i, . , , U. S. ATOMIC ENERGY C0!DilSSION - , . ,' DIRECTORATE OF REGULATORY OPERATIONS

!

REGION I

_yv , RO Inspection Report No.: 50-289/73-18 Docket No.: 50-289 , Licensee: Metropolitan 2dison Coceany License No.: CPPR-40 Three Mile Island - Unit 1 Priority: B.1 Category: <

I , Middletown, Pennsylvania " Location:. . ! ~ Type of Licensee: B&W 871 MWe (PWR) < ' l '. .. Type of Inspection: Routine . i Dates of Inspection: October 3-5, 1973 Dates of Previous Inspection: October 2-5, 1973 t , Reporting Inspector: 7.N,3 g/tv /o[/f!TS V UAT8

. R.' H. Brickley, Reactor Inspector .. } DATE Acconpanying Inspectors: M X vLA

!73 R.L.Spessard,ReactorInspector DATE . ' DATE . i.

Other Acconpanying Personnel: DATE ' 1449 W [ ~ "V I# $ 73 Reviewed By: _ ( /. Brimner, Chief, Facility Test and Startup Branch ' DATC E. fJ ' f 'N ( o IT 08b7 u i st?93#4,W sj' , , . _ _ _ - -.. -... -_ -_ _ _ .

' ' . - -.. - _ _ - - _ _.. . .. .- _ - _ _. _ _ _ _,. .. _ - r i - l - .

I SU??!ARY OF FINDINGS . x Enforcement Action \\_) A.

Violations

The licensee failed to follow his document control ins tructions during the issuance of preeperational test procedure TP 305/2 in apparent violation of 10 CFR 50, Appendix B, Criterion V (Details, Paragraph 2.a. (1) ). i ! B.

Safety

None identified relative to test and startup activities i Licensee Action on Previousiv Identified Enforcement Items ! l None required relative to test and startup activities.

I Unusual Occurrences , ' . . None j Other Signficant Findings l A.

Current Findings l 1.

Information obtained during the inspection revea? ed the , , i following with respect to project status: f' , a.

All systems required to support initial fill and i hydro of the Reactor Coolant System have been constructed

and released to Startup for testing.

! b.

Preoperational testing of all systems required to support installation of the Reactor Vessel Head (preparatory to initial fill and hydro of the Reactor Coolant System) have been completed.

- c.

Installation of the Reactor Vessel Head and Stud Tensioning is scheduled to begin on October 5, 1973.

d.

Initial fill of the Reactor Coolant System is scheduled to hbgin on October 15, 1973, and the hydrostatic test of the Reactor Coolant System is scheduled to begin on October 28, 1973.

i t e.

Hot functional tes ting is scheduled to begin on January 2, , 1974, and fuel loading is scheduled to begin on March 22, 1974.

1449 203 _ $

., --- _____ .. _.. _ _. . _ .- l e ' . . ~ -2- , B.

Status of Previousiv Reported Unresolved Items ( ) No change

Management Interview =. =.. _.. An exit interview was conducted on October 5,1973 at the conclusion .. of the inspection.

Items discussed and personnel in attendance were as follous: . Licensee's Representatives i J. Herbein, Assistant Plant Superintendent, IMt. Ed.

I G. Miller, Tes t Superintendent, GPUSC ! RO:I Representatives ! R. Brichley , L. Spessard ,

. A.

Preooerational Test Procedures i 1.

Inspection findings relative to the review of TP 202/3, TP 305/13, and TP 330/2 were discussed. (Paragraph 2.a) 2.

Inspection findings relative to an apparent violation of 10 CFR 50, Appendix B, Criterion' V during the issuance of TP 305/2 were , ,3 ! ,1 discussed. (Paragraph 2.a.(1) )

1 3.

Ins'pection findings relative to the review of tes ta recently ' completed and accepted by the Test Work Group (TWC) were

dis cus s ed.

(Paragraph 2.b) . 4.

Inspec:Lon findings relative to the review of procedure history files for implementation of TI-18 were discussed. (Paragraph 2.c) 5.

Inspection findings relative to the review of TWG and PORC meeting minutes were discussed. (Paragraphs 2.d and 2.e) B.

Control of Combustible Material in the Reactor Buildine The inspector stated it was his unders tanding, based on information received during this RO inspection, that prior to Hot Functional Testing all combustible material would be removed from inside the i a*1 mary and sedondary shield walls and that combus tib 3 material ' located outside these areas would not be in close proximity to systems / components carrying hot fluid.

The inspector further stated it was his understanding that this matter would be controlled by adding it to the Prerequisite List for Hot Functional Testing.

The licensee representatives acknowledged the inspector's under-standings.

4, ' 1449 2o4 < -

. . . __ _ _ ._.

_... _ - s . . . -3- . \\. ) C.

Generic Tes ting i Inspection findings relative to the review of TCN-3 to TP 250/2 were discussed. (Paragraph 3) l D.

Providine, Test Program Documents to RO:1 I The inspector stated that approved test program documents (Tes t , ' Procedures, Prerequisite Lis ts, Tes t Schedules, Tes t Man 12ng P Assignments, and Tes t Instructions) needed to be provided :o { R0:1 in a timely manner.

In this regard, t' e inspecto r s tated that TP 202/3 Makeup rad Purification System Functional Test had not been provided to RO:1 in a timely manner in that the i TP had been approved on September 19, 1973 and portions of the , test had been conducted prior to this RO inspection. Licens ee representatives acknowledged this matter.

. - . I i . ' 1449 265

... l

f ' I

! ! !

. $ . I ~ ~ ~ ~ i ' m.

"

'.. - - - - _ _ _ _ _. _ _ _ - - - + . . . . , DETAILS . ., 1.

Persons Contacted %) Metropolitan Edison Coenany R. Klingaman, Plant Superintendent Herbein, Assistant Flant Superintendent s.

General Public Utilities Service Corporation

J. Barton, S tartup and Tes t Manager

G. Miller, Tes t Superinter ent R. Toole, Assistant Test Superintendent , . M. Nelson, Technical Engineer ' R. Claussen, Lead Engineer - Instrument and Controls W. Bateman, Lead Ergineer - Mechanical j i 2.

Preoperational Tes t Procedures ' , a.

RO:I Review of Preoperational Tes t Procedures ' i The inspector discussed his review of the following preoperational . test procedures:

1 TP 202/3 - Makeup and Purification System

TP 305/lB - Reactor Protection System Preoperational Calibration ,, TP 305/2 - Reactor Protection System Response Time TP 33d/2 - C. R. D. Control System P 'olution was obtained on all items except the following: (1) TP 305/2 - Reactor Protection System Response Time Numerous pen and ink type dhanges were made throughout this procedure without identification as to the individual making the changes, when the changes were made, and that these changes were authorized.

' The licensee's representative stated that the marked up copy of the procedure was the one reviewed and approved by the TWG for official issuance.

The inspector reques ted, received, anu reviewed the history file for this procedure. This review revealed that the licensee failed to follow tes t ins truction TI-lS, Tes t __ .. _. _, Procedure Documents, in that: (a) The procedure did not receive a preliminary review by the TWG as required by Part I-Section 2.1.4, and Part III-Step 9 of Enclosure 1.

1449 266 .

. - -. . . . - -.. . - o . - 5-(b) The GPU Test Auditor had not reviewed the procedure . and submitted his connents prior to final approval by the WG as required by Part III-Step 12 of Enclosure x n 1.

(c) The Test Superintendent did not obtain and present the results of the GPU Tes t Auditor's review at the final ' WG meeting as required by Part III-Step 19 of Enclosure 1.

' (d) A marked up copy of this procedure, rather than the

smooth copy that was reviewed and approved by the WG, was issued as the "Of ficial Field Copy" in noncompliance with Part III-Step 21 of Enclosure 1.

'Ihe inspector compared parts of the marked up copy that has been erroneously issued against the smooth copy that had been approved , and found the two to be identical.

! ! The licensee was informed that, in view of the above findings and discussions with their representatives that indicated a ' , possible misinterpretation of the requirements of TI-18, RO:I , would reexamine this document for areas that need clarification.

' The licensee responded that they also intended to reevaluate ' TI-18 and revise it to provide more definative requirements.

I b.

Review of Preoperational Test Results , The inspector reviewed the completed test packages as accepted l by,the licensee and is satisfied with the documentation of ' performance and results o.' the following tests:

F1104/29Y - Liquid Waste Disposal System - Operation and Use of . ! Precoat Filtr.rs F1104/34 - Turbine Luba Oil Conditioner & Supply Functional Test F1104/3 - Condensate Chemical Feed " l F1106/13 - Powdex Filter Sys tem ! F1104/35 - Circulating Water Chlorination & Chemical Feed SP143.17 - Steam Generator Initial Nitrogen Purge, Fill, and Flush, and Wet Lay-up. c.

Review of Preonerational Test Procedure His torv Files The inspectors reviewed the following preoperational test procedures history file for implementation of TI-18: TP 160/3 - Reactor Building Purge 4kh 1bf , TP 203/4 - Decay Heat Removal Sys ten Functional Tes t

i TP 305/2 - Reactor Protection System Response Time

. . - - . - - - - .-- ' e

, .-6- . . . The inspector found documentation to indicate implementation _} of TI-18 for TP 160/3 and TP 203A.

The requirements of TI-18 ' were not completely implemented in the case of TP 305/2 (Reference Paragraph 2.a. (1) ). p


9 Review of TWG Minutes The inspector reviewed TWG meeting minutes for the period August 1 through September 24, 1973 (Meetings No. 56 through 62).

The following observations were made: I (1) TWG actions relative to approval of test procedure scopes, , test procedures, TCN's to the MIX and tes t procedures, test results, and the Prerequisite List for Initial Fill and , Hydro of the Reactor Coolant System were documented; however, the inspector was unable to determine which version (Draf t 1, 2, 3 etc) of the test procedure had been revieued and i approved.

- , , { (2) Comments by '.vidual TWG members relative to test procedures ' and resolut_.. of these comments, as appropriate, were l documented in the meeting minutes.

! t (3) A TWG quorum was present at each meeting, and the Met Ed , Test Auditor was present at meetings No. 57 and 60.

, ~') Based on *.he above observations, the inspector concluded that the TWG was functioning in accordance with the requirements of the Test Manual.

, e.

Review of PORC Minutes The inspector reviewed the PORC meeting minutes for the t eriod August 8 through September 24,1973 (Meetings No.186 th "ough 194). The following observations were made:

. 1.

A PORC quorum was present at each meeting.

2.

PORC actions relative to their review of tes t procedures and results were documented; however, the inspector was unable to determine which version (Draf t 1, 2, 3 etc) had been reviewed.

3.

Generic Tes ting . - - - -. The inspector reviewed TCN-3 to TP 250/2 Tes ting and Checking of Mechanical and Electrical Equipment dated September 21, 1973 which was approved on September 24, 1973 in accordance, "h the Test Manual.

This TCN revised data sheets SE-1, IE-2, ME-3, and !N-2 to include, as appropriate, provisions for identifying and , recording the test equipment used during the performance of these - 1449 2o8 - . -- - ._ - _ .

,. . . - - -. ... -. . _ _. - -.. - -. . -. ., -{ ~ ,. . ' !A zj .

-7-UU 's \\. / , eneric tests and for identifying vibration readings tal'en on , the pump outboard bearing. Tha previous RO:1 findings relative to these matters are resolved.* .

!, ! . i - i . O) { _.

- i: . ! ! ! . ,

  • RO Inspectiod Report No. 50-289/73-15, Paragraph 7.e t

.. - 1449 ?o9 t _ s _ _ _. _. . _. _ -...._ ___- ..__-.- _.... _... _ , ._

. _ . _ _.

. , J .. - . r . " . . . . - . . ,, .

.' ...... <] . LJ ' - . ' . .. . . MEMO ROUTE SUP s.....wut inia.

m cecun.nc.. m.ctie.

Form AIC.9 5 ( Rev. May 14.1947) Af(,M O240 Note and retura.

.s 5:c ature.

X For informeFon.

TO (Narne and unst) aNTIALS REMARKS RO Chief, FS&EB, HQ METROPOLITAN EDISON COMPANY RO:HQ (5)

    • "

GC RO Files REPORT NUMBER 50-289/73-18 TO (Name and unit) INIT1 REMAAKS The above inspection report is forwarded for Central Mail & Files Regulatory Standards /% om' information.

Distribution will be made by this Directorate of Licensing (13) . office to the PDR, Local PDR, NSIC, DTIE, T O (Narre and unit) INITIALS REMAAKS and State Representa&es aRer redew by Regional Directors, RD (4) ! the licensee for proprietary infor=ation.

om I i . '{M (Name and unst) REMARKS ' .' ":D [ E.[ /[f - -

J. Brunner -

pegionI . PHOhE pe(1 oAft / 8-337-1264 10/f g USE OTMER SIDE FOR ACDITIO*eAL R(MARK $ CPO: 1,78 O. 445-443

/. .t 8C 1449 270 .

e

. . . M

- _ ... - --_ }}