1,

.1

.

.

.Aj M

U. S. ATOMIC ENERGY C0} MISSION

, il

.

'

'

DIRECTORATE OF REGUIATORY OPERATIONS '

,g El

,

REGION I

50-289 h )

Docket No. : 50-289 RO Inspection Report No.:

!!.

I.icensee :

Metropolitan Edison Company License No.: CPPR l.

y Three Mile Island 1 Priority:

..

-

B.1 Category:

-,

i j

=

j Location:

Middletown, Pennsylvania i

!

B&W 871 MWE l

Type of Licensee:

.

I h

Type of Inspection: S ecial, Quality Assurance Status Review P

j i

October 25, 1973 I

Dates of Inspection:

.

Dates of Previous Inspection:

,

('

.

l Reporting' Inspector:_ i_ [

MM i

_ _ _.

U a.

n.

uussevuu,,neuwsut Aaspe ""'

Date M/~, / - 7 Ac' companying Inspectors:

/

^

^

-

.

. Spessard

-

.

Date

-.

Other Ac.co=panying Personnel:

h7 Reviewed By:

--

'

-

- - -

E[J. Brunner, Chhf, Reactor Operatbns Branch

1449 233 r.

-

-

--

~-

-

.

-

.

.

.

.

SLEMARY OF FINDINGS

-

]

Enforcement Action v

None Licensee Action on Previously Identified Enforcement Items Not Applicable Design Changes Not Applicable Unusual Occurrences Not Applicable Other Significant Findings A.

Current

.

None B.

Status of Previously Reported Unresolved Items

.

-

Not Applicable

y v'

Management Interview

-

The management meeting was conducted in the offices at Ihree Mile Island with the foflowing individuals present:

.

Metropolitan Edison Company

,

L. L. Lawyer, Operational Quality Assurance Manager (Effective November 1,1973)

R. McLaughin, Operational Quality Assurance Manager W. Potts, Quality Assurance Engineer Suntac Nuclear Corporation

.

D. L. Maxwell

,

Catalytic r

.

F. N. Manella, Quality Assurance Engineer j44g

)

USAEC RO:I R. Glasscock, Reactor Inspector

,

L. Spessard, Reactor Inspector

.

The items discussed are summarized below:

(

v s

,,

_

.,

e

...,

m -. *

    • - *

-**

D

=

F

'

i

e-2-l,5 s

A.

The inspector stated the purpose of the meeting was to review the scope of the Quality Assurance Program and to obtain a commitm nt for completion of the program.

B.

The inspector presented the overall scope of the program necessary

.

to implement the Appendix B requirements for the operations phase.

This included detail discussions of the program applicability to all quality affecting activities, and the details of the procedures and procedure controls required to implement the Quality Assurance

.

Program.

C.

The licensee agreed to provide RO:I with the date for completion of the program. December 3,1973 was subsequently provided as the date the program will be available for the RO:I review.

'

1449' 235

.

.

e x.s

.

e

e

-

I i

ii

,

/

e

,

, -. - -

.

a

-

-

a

.

,-.

..

,

6

=

.

~

DETAILS None

.

1449 236

.

o

.%L-

.

.

O O

+

/

,

M

  • .'emw

e - me em%e %e

==

-,-

,._.

,.

,,

e