UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30323 Report Nos.:
50-280/85-37 and 50-281/85-37 Licensee:
Virginia Electric and Power Company Richmond, VA 23261 Docket Nos.:
50-280 and 50-281 Facility Name:
Surry 1 and 2 License Nos.:
DPR-32 and DPR-37 1985 Approved by: =---=-~-=,,--..,:;;.J,,a~..::;__,;;...Jq.....::....:;.::::;:....-________
_
T. E. Con 1 on, Plant Systems Engineering Branch Division of Reactor Safety SUMMARY 12 -I Z-85'
Date Signed i -z_, -1 i,,-- f {
Date Signed Scope:
This routine, unannounced inspection entailed 39 inspector-hours on site in the areas of Fire Protection/prevention and followup on previously identified inspection item Results:
No violations or deviations were identifie *
REPORT DETAILS Persons Contacted Licensee Employees
- R. F. Saunders, Station Manager
- H. L. Miller, Asst. Station Manager
- S. D. Woodyard, QA Inspector
- L. Farinholt, Jr., Site Loss Prevention Supervisor
- B. Robbins, Corporate Loss Prevention
- J. B. Logan, Licensing Coordinator C. Core, Site Asst. Loss Prevention Supervisor F. Burke, Fire Protection Specialist L. White, Fire Protection Specialist Other licensee employees contacted included engineers, technicians, operators, security force members, and office personne NRC Resident Inspector
- M. J. Davis
- Attended exit interview Exit Interview The inspection scope and findings were summarized on November 22, 1985, with those persons indicated in paragraph 1 abov The inspector described the areas inspected and discussed in detail the inspection finding No dissenting comments were received from the license Inspector Followup Item (280/85-37-01 and 281/85-37-01), Firefighting Preplans Lack Brigiade Guidance in Smoke Control, Fire Damage Control and Fire Suppression Water Runoff Control - paragraph Inspector Followup Item (280/85-37-02 and 281/85-37-02), Annual Fire Pump Test Not Being Conducted Following the Guidance of NFPA-20-paragraph Inspector Followup Item (280/85-37-03 and 281/85-37-03), Review of Appendix R Fire Barrier Upgrade Program - paragraph Inspector Followup Item (280/85-37-04 and 281/85-37-04), Review of Fire Protection Valve Cycle Test Program to Verify All Testable Valves Are Being Tested - paragraph * Inspector Followup Item (280/85-37-05 and 281/85-37-05) Failure to Revise FPSER Commitment Regarding Replacement of Foam Cart By Fire Truck - paragraph The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio.
Licensee Action on Previous Enforcement Matters (Closed) Violation Item (280/81-32-03 and 281/81-32-03), Failure to Complete All of The Fire Protection Modifications Required By The Fire Protection Safety Evaluation Report (FPSER):
The licensee has installed a fire Damper Assembly in the Supply Air Ventilation opening from the Turbine Building into the No. 3 Mechanical Equipment Roo In addition, the licensee installed fire dampers in two ventilation duct penetrations in the fire barrier wall between the two fire pump rooms and changed out the fire dampers between the lube oil storage room and the turbine building to 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> Damper Also, the licensee has sealed the fl oar drain system in the di ese 1 fire pump room to prevent the spread of combustible liquids into the electric motor driven pump roo The licensee has implemented the appropriate surveillance procedure for non electrically supervised fire door The licensee is assuring that these doors are being maintained closed by either inspecting locked closed doors weekly, inspecting doors equipped with automatic release mechanisms monthly or inspecting doors equipped with self closing mechanisms and not locked closed dail It appears that the licensee has completed the fire protection modifications required by para-graph 3.I of license Nos. DPR-32 and DPR-3 This item is close (Closed) Deviation Item (280/81-32-02 and 281/85-32-02), Fire Dampers For Intake Structure - Oil Storage Room Are Not Arranged To Automati-cally Close Upon Actuation Of The Fi re Suppression System:
The licensee has arranged the 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire dampers in the fire barrier walls separating the fuel oil tank from the emergency service water pumps to close upon activation of the carbon dioxide suppression in the fuel oil tank roo Therefore, this item is close.
Unresolved Items Unresolved items were not identified during the inspectio.
Fire Protection Prevention Program (64704) Fire Prevention/Administrative Control Procedures The inspector reviewed the following Fire Prevention/Administrative Procedures:
- Procedure N FPP ADM-56
Title Fire Protection Program December 17, 1984 Special Processes Involving Ignition Sources, June 25, 1985 Based on this review, it appears that the above procedures except for the fire preplans in the fire protection program meet the NRC guide-lines of the Document Entitled 11 Nuclear Plant Fire Protection Func-tional Responsibilities, Administrative Controls and Quality Assurance
Dated June 1977 and the licensee's commitments in their letters to the NRC dated July 14, 1977, April 5, 1977 and July 21. 197 The licensee is currently revising the fire preplans to provide additional firefighting guidance to the fire brigade with regard to the control of plant fire protection features which will assist the brigade in the reduction of fire damage, smoke control, fire suppression water runoff control, et In addition, the fire preplans are incorporating the fire area boundaries presently proposed by the licensee's Appendix Revaluatio The licensee's current schedule indicates that the revised firefighting preplans will be fully implemented by the end of the first quarter of 198 This is identified as Inspector Followup Item ( 280/85-37-01 and 281/85-37-01), Firefighting Prep 1 ans Lac~
Brigade Guidance In Smoke Control, Fire Damage Control and Fire Suppression Water Runoff Control, and will be reviewed during a subsequent NRC inspectio Fire Protection Surveillance Procedures The inspector reviewed the following Fire Protection System Surveill-ance Procedures:
Procedure N Title PT. 2 Fire Prot. Water Pump (Rev. 11-5-85)
PT. 2 High Pressure CO2 (Rev. 5-10-84)
PT. 24.4C Fire Prot. Syst. Extinguishers Hose Station (Rev. 10-8-85)
PT. 24.4D Fire Protection System Hydrants and Hose Stations (Rev. 11-5-85)
PT. 24.4H Fire protection System Hydrants and Hose Station (Rev. 9.17-85)
PT. 2 Vital Areas Smoke Detector Functional Test (Rev. 10-30-84)
PT. 2 Fire Protection - Fixed Suppression System (Rev. 10-24-85)
PT. 24.11 Fire Barriers (Rev. 2-23-84)
PT. 24.11A PT 24.12 PT 24.32 PT. 24.33 PT. 24.44
Fire Doors (Rev. 5-23-85)
Fire Pump Flow Rate Test (Rev. 6-21-84)
Fire Protection - Water Spray Sprinkler System Cable Vault and Tunnel (Rev. 4-19-84)
Fire Protection Valve Position Surveillance (Rev. 2-21-85)
Emergency Switch Gear Room Halon (Rev. 9-24-85)
The above surveillance procedures were reviewed to determine if the various test outlines and inspection instructions adequately implement the surveillance requirements of the Plant 1 s Fire Protection Technical Specification In addition, these procedures were reviewed to determine if the inspection and test instructions followed General Industry Fire Protection Practices, NRC Fire Protection Program Guidelines and the Guidelines of the National Fire Protection Associa-tion (NFPA) Fire Code Based on this review, it appears that the above. procedures are satisfactory except for survei 11 ance test procedure PT. 24.12 Fire Pump Flow Rate Tes The annual fire pump test does not follow the testing guidance provided in National Fire Protection Association (NFPA) Standard-20 11 Installa-tion of Centrifugal Fire Pumps
- The present acceptance criteria only records the 100% fl ow rate capacity of the pump and the discharge pressure and does not denote engine/motor performance characteristic In addition, the annual fire pump test does not test peak l~ad (150%
capacity) condition Therefore, the test procedure does not utilize the NFPA pump test data (Discharge flow and pressure, engine/motor speed, etc.) for comparison to the original pump acceptance curve thus, the true performance of the pump is not specifically determined by the subject test procedur The 1 i censee recognizes the inspectors concerns and committed to revise the procedure appropriately. This is identified as Inspector Followup Item (280/85-37-02 and 281/85-37-02),
Annua 1 Fi re Pump Test Not Being Conducted Fo 11 owing The Gui dance of NFPA-20, and will be reviewed during a subsequent NRC inspectio Fire protection System Surveillance Inspections and tests The inspector reviewed the following surveillance inspection and test records for the dates indicated:
(1)
PT-2 Fire Protection Water Pump (Weekly)
September 1, 1985 Through October 31, 1985 ( 2)
PT-2 High pressure Carbon Dioxide System (Semi Annual)
April 30, 1985 (3)
PT-24.4C Fire Protection System Extinguishers and Hose Stations (Monthly)
January 9, 1985 Through October 1, 1985
(4)
PT-24.4D Fire Protection System Extinguishers and Hose Stations (Monthly)
January 6, 1985 Through November 3, 1985 (5)
PT 24.4H Fire protection System Extinguishers and Hose Station (Monthly)
January 7, 1985 Through November 8, 1985 (6)
PT-2 Vital Areas - Smoke Detectors Functional Test (Every 6 Months)
March 7, and September 5, 1984 and June 8, and October 14, 1985 (7)
PT-2 Fire Protection Fixed Suppression System (Quarterly)
Unit 1 - February 20, May 21, and August 20, 1985 Unit 2 - November 23, 1984 and February 20, May 21, and August 23, 1985 (8)
PT-24.11 Fire Barriers (18 Months)
February 21, 1984 and September 25, 1985 (9)
PT-24.llA Fire Doors (Monthly)
November 14, 1984 Through October 10, 1985 (10)
PT-24.12 Fire Pump flow Test (Annual)
March 18, 1984 and April 4, 1985 (11)
PT-24.32 Fire Protection - Water Spray/Sprinkler - cable Vault and Tunnel (18 Months)
April 30, 1984 (12)
PT-24.33 Fire Protection - Valve Position Surveillance (Monthly)
November 29, 1984 Through November 27, 1985 The surveillance test record data and testing frequency associated with the above fire protection system surveillance tests/inspections were found to be satisfactory with regard to meeting the requirements of the plant's Fire Protection Technical Specification Fire Protection Audit The most recent audit reports of the Surry Fire Protection Program were reviewe These audits were:
(1)
Annual Corporate Loss Prevention Audit, February 15, 1985, Report No. S84-01 (2)
24 Month Corporate QA/QC Audit, May 30, 1985, Report No. S85-1 (3)
Three Year Audit - Professional Loss Control, November 10, 198 These audits identified several fire protection program discrepancies and unreso 1 ved i terns, and recommended severa 1 program improvement The license has either implemented the corrective actions associated with these audit findings or a scheduled date for completion of the correction actions had been establishe The licensee appears to be taking the appropriate corrective actions on these audits finding Fire Brigade (1) Organization The fire brigade is composed of approximately 74 personnel from the operations and security staff The brigade leader at the scene is normally one of the plant operators and the remaining four fire brigade members are composed of operations and security personne The inspector reviewed the 11 0n Shift Duty Roster 11 for the following dates and verified that sufficient qualified fire brigade personnel were on duty to meet the provisions of Technical Specification 6.2.2:
November 18, 1985 November 20, 1985 November 21, 1985 In addition, the inspector verified that sufficient personnel were assigned to each shift to meet the minimum operating and fire brigade staff requirements of the Techni ca 1 Specification Therefore, it appears based on the review of the duty rosters associated with the above dates, that there was sufficient manpower on duty to meet both the operational and the fire brigade requirements of the plant's Technical Specification (2) Training The inspector reviewed the training and drill records for three brigade scene leaders and three brigade members for 1984 and the first three quarters of 198 The records reviewed indicated that each of these leaders and members had received an annual medical review, attended the required training and participated into the required number of drill The inspector also verified that a fire brigade drill had been conducted every 92 days in 1984 and for the first three quarters of 1985 for each shif The fire brigade training records which were inspected were found satis-factor *
(3)
Fire Brigade Equipment The inspector performed an inspection of the personnel protective Fire Brigade Equipment which is stored at the 11 fire brigade equipment response locations located throughout the Unit 1 and 2 turbine building A total of 22 sets of turnout gear (coats, boots, helmets, etc.),
and 22 sets of self-contained breathing apparatus are stored at these Fire Brigade Equipment Responses location Based on this inspection, the designated fire brigade turnout equipment and self-contained breathing apparatus stored at the fire brigade equipment response locations appeared to be properly maintained and stored in a ready conditio (4)
Fire Brigade Drill During this inspection, the inspector witnessed an announced fire brigade dri 1 The dri 11 fire scenario was a fire in the Technical Support Center Mechanical Equipment Roo The apparent drill fire condition was caused by a fire in a trash ca Six fire brigade members responded to the pending fire emergenc The brigade assembled outside the Mechanical Equipment Room in the corridor in full protective firefighting turnout clothing and self contained breathing apparatu An initial size-up of the fire condition was made by the fire brigade scene leader and two lt inch fire attack hose lines were advanced into the mechanical equipment roo The fire attack hose lines were placed in service on the fire and the fire was placed under control in 12 minute In addition, the fire brigade initiated fire victim search and rescue, fire extension, and water control operation The fire brigade utilized proper manual firefighting methods and reacted to the fire drill scenario in an effective and efficient manne Pl ant Tour A plant tour was made by the inspecto During the plant tour, the following safe shutdown related plant areas and their related fire protection features were inspected:
Unit 1 Cable Vault Unit 2 Cable Vault Unit 1 Battery Room lB Unit 2 Battery Room 2A Mechanical Equipment Room No. 3
Diesel Generator Rooms Unit 1 and 2 Cable Spreading Rooms Auxiliary Building Elevation 13
- 0
Auxiliary Feedwater Pump Rooms The inspector visually inspected the fire/smoke detection capabilities, the manual firefighting equipment (i.e., portable extinguishers, hose stations, etc.) and the fire barrier walls associated with the above plant area' In addition, the inspector visually inspected the manual sprinkler protection associated with Unit 1 and 2 cable vault room Based on the visual inspection, it appears that the fire protection features associated with the above plant areas were properly maintained and fully functional except in the auxiliary feedwater pump room The inspector during the plant tour, identified that in the fire barrier wall which separates the auxiliary feedwater pumps from the containment spray pumps in the Unit 1 safeguards room that a 1 ft. x 3 ft. penetration was not properly sealed with an approved fire resistive penetration sealant material. The licensee identified to the inspector that upon full implementation of their Appendix R program that the subject fire barrier would no longer be required and would no 1 onger be required to be inspected in accordance with procedure PT-24.1 The inspector reviewed the licensee's proposed Appendix R fire areas and verified that the subject fire barrier was not require Therefore, in a subsequent NRC inspection, a review of fire barrier surveillance procedure PT-24.11 will be performed to verify that the Appendix R fire area fire barriers are appropriately incorporated into the surveillance program and that tho~e barriers which are no longer required are deleted from the progra This is identified as Inspector Followup Item (280/85-37-03 and 281/85-37-03), Review of Appendix R Fire Barrier Upgrade Progra During the visual inspection of the Unit 1 and 2 cable vault manual sprinkler/water spray system, the inspector inquired about the testability of manual sprinkler system control valves 1-FP-143 and 1-FP-14 Based on this inspection, it appears that the subject manual valves could be tested by isolating the supply header by closing valve 1-FP-142 and by opening the header drain valve supplying water to 1-FP-143 and 1-FP-14 The licensee evaluated the inspector's concern and agreed to test these valves and include them into surveillance test procedure PT-24.l This is identified as Inspector Followup Item (280/85-37-04 and 281/85-37-04), Review of Fire Protection Valve Cycle Test Program To Verify All Testable Valves Are Being Tested, and will be reviewed during a subsequent NRC inspectio During the plant tour, an inspection was made of hydrant hose house 3, 4, 5, 6, 7, 8, and Surveillance procedure PT-24.44 requires the following minimum firefighting equipment by provided in each hydrant hose house:
- L
Equipment Quantity
- Halligan Pry Bar
- Fire Axe
- 2.5 inch x 1.5 inch
- Female/Male Hose Adapter
- 2.5 inch female x 1.5 inch female
x 1.5 inch female gated wye
- Portable hand light
- 1.5 inch variable straight-fog
stream nozzle
- Hydrant wrench
- 2.5 inch hose - 50 ft. sections
- 1.5 inch hose - 50; ft. sections
- Spanner wrench
- Hose Strap
Based on this inspection, the firefighting equipment located in the hose houses inspected appeared to be properly maintained and stored in a ready conditio In addition, the inspector inspected the site fire truc This truck has the capabilities of pumping 1000 gpm at 150 psi and carries 500 gallons of wate The minimum supplemental firefighting equipment carried on the fire truck consists of the following:
Equipment Quantity
- 2.5 inch hose - 50 ft. sections
- 1.5 inch hose - 50 ft. sections
- 2.5 inch straight/fog stream
nozzle
- 1.5 inch straight/fog stream
nozzle
- Halligan Pry Bar
- Hose strap
- 2.5 spanner wrench
- 1.5 spanner wrench
- Hydrant wrench
- Portable Handlight
- 2.5 inch female x 1.5 inch
male x 1.5 inch male gated wye
- Foam (AFFF) 5 gallon cans
- Foam Eductor
- Foam Branch Pipe
- Fire Extinghuishers
The licensee indicated that the fire truck replaced the foam cart identified in the Fire Protection Safety Evaluation Report (FPSER).
The inspector reviewed the FPSER to determine if the equipment carried
..,.
on the fire truck provided equivalent protection to the equipment which was carried on the foam car Based on this review, it appears that the equipped fire truck provides a higher level of protection then the foam cart described in the FPSE The inspector advised the licensee that they should revise their commitment to the NRC with regard to the replacement of the foam cart by the site fire truck. This is identi-fied as Inspector Foll owup Item (280/85-37-05 and 281/85-37-05),
Failure to Revise FPSER Commitment Regarding Replacement of Foam Cart by Fire Truc The plant tour was also verified the licensee's implementation of the fire prevention administrative procedure The control of combustibles and flammable materials, liquids and gases, and the general house-keeping was found to be satisfactory in the areas inspecte Two welding operations were observed one in the turbine and the other in the fuel buildin An approved "Hot Work" permit had been issued for each of the welding sites and the operations and fire prevention/protection practices met the licensee's fire prevention procedure requirement Within the areas inspected, no violations or deviations were identified.