Forwards Insp Repts 50-275/97-19 & 50-323/97-19 on 971011-1122.No Violations Noted.Plant Was Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices
ML16342D916
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/18/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D917 List:
References
50-275-97-19, 50-323-97-19, NUDOCS 9712220312
Download: ML16342D916 (12)


See also: IR 05000275/1997019

Text

'VAAZ)

V'vWB

AJ&bvt'WJ

4s

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9712220312

DOC.DATE: 97/12/18

NOTARIZED: NO

FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific

Ga

~

~

~

~

~

50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific

Ga

AUTH.NAME

AUTHOR AFFILIATION

WYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

- RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards insp repts

50-275/97-19

& 50-323/97-19

on

971011-1122.No violations noted. Plant was generally

characterized

by safety-conscious

operations, sound

engineering

8 maint practices.

DISTRIBUTION CODE'EOIF

COPIES

RECEIVED'LTR

ENCLl

SIZE

TITLE: General

(50 Dkt) -Insp Rept/Notice of Vio ation Response

NOTES:

DOCKET

05000275

05000323

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

BLOOM,S

COPIES

LTTR ENCL

1

1

R

INTERNAL: ACRS

AE Dg

LE CE

NR

M PECB

NUDOCS-ABSTRACT

OGC/HDS3

RNAL: LITCO BRYCE,J H

NRC

PDR

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTZON LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

~)R Alp(,

UNITED STATES

NUCLEAR R EG ULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON. TEXAS 76011 8064

Dc.C

I 8:"-97

Gregory M. Rueger, Senior Vice President

and General Manager

Pacific Gas and Electric Company

Nuclear Power Generation,

N9B

P.O. Box 770000

San Francisco, California 94177

SUBJECT:

NRC INSPECTION REPORT 50-275/97-19; 50-323/97-19

Dear Mr. Rueger:

An NRC inspection was conducted

October

11 through November 22, 1997, at your

Diablo Canyon Nuclear Power Plant, Units

1 and 2 reactor facilities. The enclosed report

presents the scope and results of that inspection.

During the 6-week period covered by this inspection period, your conduct of activities at

the Diablo Canyon Nuclear Power Plant facility was generally characterized

by

safety-conscious

operations,

sound engineering

and maintenance

practices,

and good

radiation protection support.

During this inspection period, your staff performed online replacement of the Unit 2 startup

transformer.

This task required both units to be isolated from startup power, which was

risk significant because

a trip of either unit would result in a loss of offsite power until

500 kV power through the main transformer could be restored.

The planning and

preparations for this evolution became acceptable

after NRC discussions

on the evolution

and the planned compensatory

actions.

The initial plans did not provide supplemental

operator training for the loss of offsite power.

After NRC questions

regarding the last

performance of training, your staff determined that supplemental

training would be

performed.

We encourage

your continued attention toward planning contingencies

when

preparing to place the plant in a risk significant alignment.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter

and its enclosure,

be placed in the NRC Public Document Room.

Should you have any questions

concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

T omas

P. Gwy n, Directo

Division of Reac or Projec

'II7i22203i2 97i2i8

PDR

ADOCK 05000275

6

PDR

fIfflfllllllllffIlllf

Ilfl IIIfIffffff

0

Pacific Gas and Electric Company

-2-

Docket Nos.:

50-275

50-323

License Nos.:

DPR-80

DPR-82

Enclosure:

NRC Inspection Report

50-275/97-1 9; 50-323/97-1 9

cc w/enclosures

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns)Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent

Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,'alifornia

94234

Pacific Gas and Electric Company

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

Robert P. Powers, Vice President

and Plant Manager

Diablo Canyon Power Plant

P.O. Box 56

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson

Avenue

P.O. Box 112

San Luis Obispo, California 93406

4

0

Pacific Gas and Electric Company

-4-

EC

I 8 igg7

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to, DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:i DciDC719RP.DLP

To receive copy of document,

indicate in box: "C" = Copy without enciosures

"E" = Copy with enciosures

"N" = No copy

RIV:SRI:DRP/E

DLProulx

12/

97

C:DRP/E

RI:DRP/E

DBAllen

12/

97

D:DRP

Pl: DRP/F

DGAcker

12/

97

LE:0

TOMc ernon

12/ 6'97

C:PB

BMurr y

1 2/j.'f97

HJW

g Q~

TPG

ynn

12/

97

/"lidfe ~

OFFICIAL RECORD COPY

Pacific Gas and Electric Company

-4-

DEC

I 8 I997

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:tt DciDC719RP.DLP

To receive copy of document,

indicate in box: "C" = Copy without enctosures

"E" = Copy with enclosures

"N" = No copy

RIV:SR I:DRP/E

DLProulx

1 2/'7

C:DRP/E

HJW

g

RI:DRP/E

DBAllen

12/

97

D:DRP

TPG

ynn

12/

97

PI:DRP/F

DGAcker

12/

97

LE:0

C:PB

TOMc ernon

BMurr y

12/ (ir97 '2/j.'f97

/~/~/+ ~

OFFICIAL RECORD COPY