Text
'VAAZ)
V'vWB
AJ&bvt'WJ
4s
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9712220312
DOC.DATE: 97/12/18
NOTARIZED: NO
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific
Ga
~
~
~
~
~
50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
WYNN,T.P.
Region
4 (Post
820201)
RECIP.NAME
- RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas
& Electric Co.
SUBJECT:
Forwards insp repts
50-275/97-19
& 50-323/97-19
on
971011-1122.No violations noted. Plant was generally
characterized
by safety-conscious
operations, sound
engineering
8 maint practices.
DISTRIBUTION CODE'EOIF
COPIES
RECEIVED'LTR
ENCLl
SIZE
TITLE: General
(50 Dkt) -Insp Rept/Notice of Vio ation Response
NOTES:
DOCKET
05000275
05000323
RECIPIENT
ID CODE/NAME
PD4-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
BLOOM,S
COPIES
LTTR ENCL
1
1
R
INTERNAL: ACRS
AE Dg
LE CE
NR
M PECB
NUDOCS-ABSTRACT
OGC/HDS3
RNAL: LITCO BRYCE,J H
NRC
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
NUDOCS FULLTEXT
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTZON LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
~)R Alp(,
UNITED STATES
NUCLEAR R EG ULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON. TEXAS 76011 8064
Dc.C
I 8:"-97
Gregory M. Rueger, Senior Vice President
and General Manager
Pacific Gas and Electric Company
Nuclear Power Generation,
N9B
P.O. Box 770000
San Francisco, California 94177
SUBJECT:
NRC INSPECTION REPORT 50-275/97-19; 50-323/97-19
Dear Mr. Rueger:
An NRC inspection was conducted
October
11 through November 22, 1997, at your
Diablo Canyon Nuclear Power Plant, Units
1 and 2 reactor facilities. The enclosed report
presents the scope and results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
the Diablo Canyon Nuclear Power Plant facility was generally characterized
by
safety-conscious
operations,
sound engineering
and maintenance
practices,
and good
radiation protection support.
During this inspection period, your staff performed online replacement of the Unit 2 startup
transformer.
This task required both units to be isolated from startup power, which was
risk significant because
a trip of either unit would result in a loss of offsite power until
500 kV power through the main transformer could be restored.
The planning and
preparations for this evolution became acceptable
after NRC discussions
on the evolution
and the planned compensatory
actions.
The initial plans did not provide supplemental
operator training for the loss of offsite power.
After NRC questions
regarding the last
performance of training, your staff determined that supplemental
training would be
performed.
We encourage
your continued attention toward planning contingencies
when
preparing to place the plant in a risk significant alignment.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter
and its enclosure,
be placed in the NRC Public Document Room.
Should you have any questions
concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
T omas
P. Gwy n, Directo
Division of Reac or Projec
'II7i22203i2 97i2i8
ADOCK 05000275
6
fIfflfllllllllffIlllf
Ilfl IIIfIffffff
0
Pacific Gas and Electric Company
-2-
Docket Nos.:
50-275
50-323
License Nos.:
DPR-82
Enclosure:
NRC Inspection Report
50-275/97-1 9; 50-323/97-1 9
cc w/enclosures
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns)Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent
Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,'alifornia
94234
Pacific Gas and Electric Company
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
Robert P. Powers, Vice President
and Plant Manager
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson
Avenue
P.O. Box 112
San Luis Obispo, California 93406
4
0
Pacific Gas and Electric Company
-4-
EC
I 8 igg7
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to, DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:i DciDC719RP.DLP
To receive copy of document,
indicate in box: "C" = Copy without enciosures
"E" = Copy with enciosures
"N" = No copy
RIV:SRI:DRP/E
DLProulx
12/
97
C:DRP/E
RI:DRP/E
DBAllen
12/
97
D:DRP
Pl: DRP/F
DGAcker
12/
97
LE:0
TOMc ernon
12/ 6'97
C:PB
BMurr y
1 2/j.'f97
HJW
g Q~
TPG
ynn
12/
97
/"lidfe ~
OFFICIAL RECORD COPY
Pacific Gas and Electric Company
-4-
I 8 I997
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:tt DciDC719RP.DLP
To receive copy of document,
indicate in box: "C" = Copy without enctosures
"E" = Copy with enclosures
"N" = No copy
RIV:SR I:DRP/E
DLProulx
1 2/'7
C:DRP/E
HJW
g
RI:DRP/E
DBAllen
12/
97
D:DRP
TPG
ynn
12/
97
PI:DRP/F
DGAcker
12/
97
LE:0
C:PB
TOMc ernon
BMurr y
12/ (ir97 '2/j.'f97
/~/~/+ ~
OFFICIAL RECORD COPY