Forwards Insp Rept 50-275/93-29 & 50-323/93-29 on 930929-1103.Noncited Violations Observed
ML16342C026
Person / Time
Site: Diablo Canyon  
Issue date: 11/24/1993
From: Vandenburg C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A340 List:
References
NUDOCS 9312160008
Download: ML16342C026 (6)


Text

ggR RfCy

~4

)ty*y+

UNITED STATES NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P. 0.

Box 770000 San Francisco, California 94177 November 24, 1993 Attention:

Hr.

G. H. Rueger, Senior Vice President and General Hanager Nuclear Power Generation Business Unit Subject:

NRC INSPECTION REPORT NOS. 50-275/93-29 AND 50-323/93-29 This refers to the routine inspection conducted by H. Hiller, H. Tschiltz, D. Corporandy, F.

Huey and D.. Kirsch during the period from September

through November 3, 1993.

This inspection examined your activi ties as authorized by NRC License Nos.

DPR-80 and DPR-82.

At the conclusion of the-inspection, the inspectors discussed their findings with members of the PGRE staff.

Areas examined during this inspection are described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examina-tionss of procedures and representative records, interviews with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your activities were not conducted in,.accordance with NRC requirements, as discussed in Paragraph 4 of the enclosed inspection report.

Because various procedures were not properly followed, your staff was not in full compliance with NRC requirements.

In view of the corrective actions. your staff has taken and has planned for future implementation, and because the criteria of the NRC Enforcement Policy were satisfied, this violation was not cited.

In accordance with 10 CFR 2.790(a),

a copy of this letter, the enclosures, and your response will be placed in the NRC Public'ocument Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, C. A. VanDenburg

, Chief Reactor Projects Branch Enclosure:

Inspection Report Nos.

50-275/93-29 and 50-323/93-29 93i2i60008 93ii24 PDR ADOCK 05000275

PDR

cc w,'enclosure:

Dr. Richard Ferguson, Energy Chair, Sierra Club California Ms. Nancy Culver, San Luis Obispo Mothers for Peace Ms. Jacquelyn C. Wheeler Managing Editor, The County Telegram Tribune Chairman, San Luis. Obispo County Board of Supervisors Mr. Truman Burns, California Public Utilities Commission

.

Mr. Robert Kinosian, California Public Utilities Commission Robert R. Wellington, Esq.,

Diablo Canyon Independent Safety Committee Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services Mr. Peter H. Kaufman, Deputy Attorney General, State of California Christopher J. Warner, Esq.,

PG&E Mr. John Townsend, Vice President and Plant Manager, Diablo Canyon

l I

bcc w/copy of enclosure:

Docket File Project Inspector Resident Inspector B. Faulkenberry S. Richards R.

Huey P.

Johnson S. Peterson, NRR G.

Cook bcc w/o enclosure:

N. Smith J.

Bianchi D. Clevenger REGION V

MTschiltzg OKi ch Miler ll/g$/93 ll/

/93 ll/~+93 DCorporandy RHue 1 lyzgj'93 1 lyons)93 EQU T COPY VEST COPY Q

T COPY YES NO ES NO ES NO REQUEST YES

R EST COPY S

NO PJohnsonW CVanD 11/iK/93 11/~$ /93 UEST COPY ES NO VEST COPY E

NO TO PDR S

TO DCS YES NO Y

NO Fi l e Locati on:

G: ~PS 1~DC-93-29. FNL

>500"4

J