RErr-ULATORY INFORMA I ION DIBTR IBUTION SYSTEM
< R IDB >
CCE'SSION NBR: 8!1 i.='40127 DOC. D*TE: 87/1 1/OS'OT*R l ZED:
NO AC IL: 50 275 Diab lo,Can)on Nuc lear Poser Plant Unit le Paci f1c Ga 50-32? Diab:- Canyon Nuc lear Poeer Plant Unit 2i Pac ific Qa
- UTH. NAME
'UTHOR AFFILlATION ZIMMERNAN,R. P.
Reg ion 5,
Ofc of the Dir ec tor REClP. QAME RECIPIENT AFFILIATION SHIFFERi J. D.
Pacific Qas 5 Electric Co.
DOCKET 4 05000275 05000323 SUBJECT:
Foreards Ensp Repts 50-275/87-37 h 50p323/87-37 on 871005-09.
No violations or deviations noted.
orsTrrrsuTrorr coos:
rsoro coprss REcsrvso:Lrrr J swcL J srzs:
TITLE: Qeneral
<50 Dkt)-lnsp Rept/Notice of Violation Response NOTES:
REC IP IFNl ID CODF/NAME PD5 PD INTERNAL:
ACRB DEDRO NRR/D: PG/PEB NRR/DREF /FP 9 NRR/DRIB Dl R OE ERMAN, J FG F
L';:
FEL=.
TERNAL:
LPDR NBI0 COPIES LTTR ENCL
2
1
REC IP IENT I D CODE/NAME TRAMMrELLrC AEOD NRR MOR I SBEAUr D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAB/ILRB OQC/HDS2 RES DFPY Qi NRC PDR COP IEB LTTR ENCL
1
1
c
1
1 TOTAL NUMBER OF COPIEB REGUIPFD:
LTTR
ENCL
~
'
Docket Nos.
50-275 and 50-323 Pacific Gas-and Electric Company 77 Beale Street Room 1451 San Francisco, California 94106 Attention:
Mr. J.
D. Shiffer, Vice President Nuclear Power Generation Gentlemen:
SUBJECT:
NRC INSPECTION OF DIABLO CANYON NUCLEAR POWER PLANT This letter refers to the routine inspection by Mr. J.
F. Burdoin of this office on October 5 through October 9, 1987, of activities authorized by NRC License Nos.
DPR-80 and DPR-82, and to the discussion of our findings held with Mr. J.
M. Gisclon on October 9, 1987, and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
No deviations or violations with NRC requirements were identified within the scope of this inspection.
In accordance with 10 CFR 2.790(a),
a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we would be pleased to discuss them with you.
R.
P.
Zimmerman, Chief Reactor Projects Branch
Enclosure:
Inspection Report Nos.
50-275/87-37 and 50-323/87-37 87ii240i27 87ii09 PDR ADOCK 05000275 Q
REGION V + ~