IR 05000275/1982008
| ML20050C653 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/02/1982 |
| From: | Mortensen W, Schaefer D, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20050C648 | List: |
| References | |
| 50-275-82-08, 50-275-82-8, IE-V-486, NUDOCS 8204090214 | |
| Download: ML20050C653 (2) | |
Text
SAFEEUARDS INFORMATION
-
.
,
.
,
.
The information on this page is coniidered to be appropriate
'
- *
for public disclosure pursuant to 10 CFR 2.790
,
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No. 50-275/82-08 (IE-V-486)
Docket No. 50-275 (SG)
Licensee No. DPR-76 Licensee:
Pacific Gas & Electric Company 77 Beale Street San Francisco,. California 94106
,
Facility Name:
Diablo Canyon Power Plant, Unit 1 Inspection at:
San Luis Obispo County, California Inspection Conducted: March 15-19, 1982
_
Date of Last Physical Security Inspection Visit:
November 3-6, 1981 Type of Inspection:
Routine Unannounced Physical Security Inspectors:
([22 N
<2 D D.~ W. Schaefer, Physical Protection Inspector
/ Date S'igned f --
fW l. w.] p L O D&
fiortente'n, Physical Protection Inspector IDate Signed Approved by: M9 y[p.kg.
M. D. Schuster, Chief, Physical Security Section D~a~te Signed Inspection Sumary Areas Insnected:
Included a review of Security Plan and Implementing Procedures; Security Organization-Management; Security Organization-Personnel; Security Program Audit; Records and Reports; Testing and Maintenance; Protected Area Barriers; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Communications and Follow-up Items on Previous Inspections.
The inspection involved 70 inspector hours onsite by two NRC inspectors. The inspection was begun during regular hours.
Of the total inspection hours, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> were accomolished during off-shift oeriods.
9204090214 820402 PDR ADOCK 05000275
PDR EF10SURE CONTAIN3 SAFEGUARDS INF0?XATION.
UPON 5:'PARAT105 THIS PACE I3 D3:0:i!E0'IID. *
,+
.
.
=
.
.
,
.
2_
Results: The licensee was found to be in compliance with NRC requirements within the areas inspected except for the following item:
Failure to limit use of designated vehicles to onsite plant functions (Severity Level V)
Failure to comply with previous commitments (Deviation)
i l
l l
l l