Mgt Meeting Insp Repts 50-272/85-11 & 50-311/85-14 on 850419.Major Areas Discussed:Overview of Action Plan Status, Performance Indicators of Upward Trend & Contemplated Minor Organizational Changes
ML18092A666
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/15/1985
From: Limroth D, Norrholm L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18092A665 List:
References
50-272-85-11-MM, 50-311-85-14, NUDOCS 8507260560
Download: ML18092A666 (5)


Text

Report No Docket No License No Licensee:

Meeting at:

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

50-272/85-11 and 50-311/85-14 50-272 and 50-311 DPR-70 and DPR-75 Public Service* Electric and Gas Company 80 Park Plaza Newark, New Jersey 07101 USNRC, Region I Office, King of Prussia, PA Meeting conducted: ~~~~

/7 Prepared by:

~~~

0. (V. \\lJ,':!lrotli, Project Engineer m~=RP Approved by:

L. 0. Norrholm, Chief Reactor Projects Section 28, DRP Meeting Summary: Meeting on April 19, 1985 (Combined Meeting Report No /85-11 and 50-311/85-14 Scope:

Management Meeting he 1 d *ta discuss the status and details of the PSE&G Action Plan for improvement of Nuclear Department operations, which was submitted to the NRC in August 1983. Areas discussed included an overview of the Action Plan status. Additionally, performance indicators of an upward trend and contemplated minor organizational changes were discussed.

.*.

DETAILS Meeting Attendees PSE&G H. W. Sonn, President R. M. Eckert, Senior Vice President C. A. McNeill, Vice President - Nuclear J. T. Boettger, Assistant Vice President - Nuclear Operations Support L. Kammerzell, Manager, Licensing and Reliability W. R.Schultz, Program Director, Action Plan L. K. Miller, Assistant General Manager - Salem Operations NRC T. E. Murley, Regional Administrator, RI R. W. Starostecki, Director, Division of Reactor Projects (DRP), RI S. J. Collins, Chief, Projects Branch 2, DRP, RI S. A. Varga, Chief, Operating Reactor Branch No. 1, NRR L. J. Norrholm, Chief, Reactor Projects Section 2B, DRP, RI J. C. Linville, Chief, Reactor Projects Section 2C, DRP, RI D. C. Fischer, Operating Reactor Branch No. 1, NRR D. F. Limroth, Project Engineer, Reactor Projects Section 2B, DRP Background This meeting is one of recurring meetings to discuss PSE&G 1 s corrective action program progres The purpose of these meetings is to discuss the status of the Action Plan developed by PSE&G in response to the MAC diagnostic evaluation submitted to the NRC on August 26, 198.

Discussion During this meeting, PSE&G made remarks relative to indications of an upward trend in operations, including:

Surpassing previous on-line record, with Unit 1 now in 107th day of continuous operation; Over 900,000 man-hours without a lost-time accident Low-level radwaste decreased to less than 10,000 cubic feet; Decrease in backlog of design change review; Unit 2 outage completed similar work package as that of Unit 1 with significant reduction in total Man-Rem;

. '

With specific reference to the Action Plan items, 17 are closed, 9 remain open with 2 to be completed in *the near future. (see attachment)

The Vice President - Nuclear committed to make notifications to the State of New Jersey relative to reactor trips and other matters not rep6rtable under 10 CFR 50.72 and 50.7 Organizational changes and the rationale therefor, anticipated effective July 1, 1985, were discussed which included incorporation of system engineers into the station 1 s Operations Department. This change is intended to improve accountability. Other changes in nuclear review activities to improve management control of safety review functions were presented in general term Other initiatives included suspension of plant betterment items until design effort is better controlled; elimination of outside contractors; improve outage planning and control; continued plant appearance efforts; and improved incident investigation and critique proces At the next meeting PSE&G will present a revised schedule for closeout of the Action Plan. A target date for completion by November 1985 was stated as the goal of PSE& *

P S E & 6 I N R C M E E T I N 6 A P R I L 1 9 ~ 1 9 8 5 AGENDA

INTRODUCTION

STATION PERFORMANCE

ACTION PLAN OVERVIEW

OPEN ACTION PLANS

f OLLOW-UP PROGRAM

NEW INITIATIVES

PSE&G ACTION PLAN SCHEDULE 1983 1984 198!5 1888 1887 NUMBER/DESCRIPTION J F M A M J J A.S 0 N D J F M A M J J A S 0 N D J F "'

A M J J A 8 0 N D J F M A M J J A 8 0 ND

.JFMAM J J A 8 0 N D

'

' 1 FUNCTL ANALYSIS VP POS & DIR REPORTS T

~)

i 2 1 2 ND & CORP MATFllX RELATIONSHIPS

...

(A)

(!!)@

..

I

' I 3 NO POI.ICY MANVAL & SUPPORT PROCED

,,

N

@

(g:

@

'\\}

Yl7i'>

a)

(c}

-

.

'.. NO & CORP COMMUN

.

' 1 5 ND TRANSITION MGMT PROCESS

..

~ © -

2 2 I SAFETY REVIEW MANAGEMENT

...

@

@

© @

~

~

2. COWIT TRACKINO AND CLOSEOUT

~ W)

\\B1 2 3 1 INTEORATED CONFIGURE MGMT

'

(C)

,,.

2 CHANGE CONTROL PROCESS

@T

,

©

2*.1 MAINT AlN1NG PLANT CLEANLINESS

~

@

'(/':!

'V 2.*.2 COMPl.IANCE MONITOR OF TECH & EQUIP SPEC

'

.,,.

@

"V@

2. POST MOO ANO POST REPAIR TESTINO

@

..

I

.

~

!

2** SITE PROTECTION & EMERG Pl'lEPAREDNESS rkl

j 2. '*-'Cl. ENG & OPER COOROINA TION

...

@

.@©@

\\E)...

i

,,. f (Cl

...,

I 2. QA DEPT ORGANIZATION J

2. QA RELATIOflSHIPll WITH OTHER DEPTS

.

~)

<BJ (C)

@

U.3 QA ""<>CED & WORI< ACTIVITIES

...

(A)

@

...

I 2. MANT AREA ORGAN RESPONSE & INTFC

,,.

rAl (BJWI I

2. M~T P\\.A-.0 MONITORm & CONTROL

...

@ © i @\\7 2 BACKLOGGED MAINT WORI< ITEMS

...

(NJ

@

<<::>

\\7 2. MEAIM!ltlO ANO TEST EQUIPMENT

,,.

(/;:\\

( ~

,,

2. OffGANIZr.Q FOR OUT AGE MGMT

...

(A)

Y@

2. RECORD MGMT PROGRAM

,,

(A)

(8)

© (D

'Y 2. DOCUMENT CONTROL FUNCTION

,,._

IA)

@

© (0

\\7 2. N'Of!MATION SYSTEMS

,,.

(A)

©

'V 2. NUCLEAR TRAINING PROGRAM

@*'.B' @...

~ ~

Df'C~I

.lOI 1,. ltff ltL'VJ

!Nov ""' '"'~ Ui:V~ MM.3l.l.. **lo1'11 TIME NO lrir_,. 3l \\,i~ ~' m u "" NVJ Q MILESTONE 'il NRC COMP.t'TMeNT, C END OF lmNTH >

.SEP 30 l'r'l lliV.3' JAN 31, 19114 REV 2 AIA._.11 lfl'f 11£'1~ l~C 31, 19113 REV 3 1'111R31.1qe--"" ~.:7UL 3l1U~...,i iNnV 30, 19113 REV 2

-

PSE&O PROGRESS F"E8 as 19PsRH ~ J'llll Ill nl'l lilV J OCT 31, 19113 REV 1 l:nt.i 3t1Yis Rf:V-' M~ r.r I.....,.,, J'

'iEP 30, 1983 REV 0