o UNITED STATES 8005140 NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 APR 4 1980 Report Nos. 50-270/80-07 and 50-287/80-07 Licensee:
Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility: Oconee Nuclear Station Docket Nos. 50-270 and 50-287 License Nos. DPR-47 and DPR-55 Inspection at Oconee site near Seneca, South Carolina Inspectors:
R. J. Hardwick, J Date Signed A. Date Signed Approved by:__
'e T. E. Conon, ction Chief, RCES Branch Date Signed SUMMARY Inspection on March 24-26, 1980 Areas Inspected This special, announced inspection involved 38 inspector-hours on site in the area of installed equipment review with respect to the IE Bulletin 79-OIB respons Results Of the area inspected, no items of noncompliance or deviations were identifie DETAILS Persons Contacted Licensee Employees J. Ed. Smith, Plant Manager
- J. N. Pope, Superintendent of Operations
- M. A. Susinno, Steam Operations and Maintenance
- D. M. Clark, Design Engineering
- B. G. Burton, Design Engineering NRC Resident Inspector
- F. Jape
- Attended exit interview Exit Interview The inspection scope and findings were summarized on March 26, 1980 with those persons indicated in Paragraph 1 abov.
Licensee Action on Previous Inspection Findings Not inspecte.
Unresolved Items Unresolved items were not identified during this inspectio.
IE Bulletin 79-01B An examination was made on instrumentation and components associated with Engineered Safeguard and High Pressure Injection systems. The equipment that was examined is located inside the reactor building and is listed on licensee's response to the bulletin. The environmental qualification documentation review for this equipment will be performed during a future inspection. The specific equipment examined is listed belo ENGINEERED SAFEGUARD SYSTEM Pressure Transmitter N Cable N Electrical Penetration N PT21P 2EMC649A EC4 2PT22P 2EMC651A WA1 2PT23P 2EMC650A EA13 3PT21P 3EMC1202A EC4 3PT22P 3EMC1203A WA1 3PT23P 3EMC1201A EA13
-2 HIGH PRESSURE INJECTION SYSTEM Motor Operated Valves (MOVs) Cable N Electrical Penetration N HP3 2EXS21A WD5 2HP4 2EXS21B WD5 2HP20 2EXS23A ED11 3HP3 3EMXS19A WD5 3HP4 3EMXS19B WD5 3HP20 3EMXS21A ED11 In discussions with the licensee and a review of their response to IEB 79-01B, it was determined that several additional items should be addressed in the licensee's 90-day response to the bulletin. These items, which are similar to those shown in the example on Enclosure (2), page 2 of thebljetin, are lubricants for MOVs, epoxy sealants and cable stuffing tube connections, Bishop Biseal tape cable splices, and Raychem cable splices. This item is identified as Inspector Follow-up Item 270/80-07-01 and 287/80-07-01, Additional Items to be Included in IEB 79-01B 90-day respons Within the areas examined, there were no items of noncompliance or deviation identifie II