Forwards IE Insp Repts 50-270/80-07 & 50-287/80-07 on 800324-26.No Noncompliance Noted
ML15251A132
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML15251A133 List:
References
NUDOCS 8005140356
Download: ML15251A132 (2)


See also: IR 05000270/1980007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

APR

4 1980

In Reply Refer To:

RII:RJH

50-270/80-07

50-287/80-07

Duke Power Company

ATTN:

W. 0. Parker, Jr.

Vice President, Steam Production

P. 0. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by R. J. Hardwick, Jr., of this office

on March 24-26,

1980 of activities authorized by NRC Operating License Nos.

DPR-47 and DPR-55 for the Oconee Nuclear facility, and to the discussion of our

findings held with J. N. Pope at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it

is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor

mation identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

Duke Power Company

-2

APR

4 1980

Enclosure:

Inspection Report Nos. 50-270/80-07

and 50-287/80-07

cc w/encl:

J. E. Smith, Station Manager

P. 0. Box 1175

Seneca, SC 29678

0II