IE Insp Repts 50-269/80-08,50-270/80-06 & 50-287/80-06 on 800225-29.No Noncompliance Noted.Major Areas Inspected: Security Plan,Security Program & Physical Security.Details Withheld (Ref 10CFR2.790)
ML19305E044
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/25/1980
From: Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19305E038 List:
References
05-270-80-06, 5-270-80-6, 50-269-80-08, 50-269-80-8, 50-287-80-06, NUDOCS 8004220204
Download: ML19305E044 (1)


Text

l

12Vrt!17"?e--y.e-,3}'

C::: -.3 ::.m' ' "- 4 ;

f %q'o,,

' ' " " * *

UNITED STATES

+

.

!

~

NUCLEAR REGULATORY COMMISSION

'

)

n

$

E REGION ll

101 MARIETTA ST., N.W., SulTE 3100 o

ATLANTA, GEORGIA 30303

        • '

MAR 311980 Report Nos. 50-269/80-8, 50-270/80-6, and 50-287/80-6 Docket Nos. 50-269, 50-270 and 50-287 License Nos. DPR-38, DPR-47 and DPR-55 Licensee: Duke Power Company 422 South Church Street Charlotte, North Carolina 20247 Facility Name: Oconee 1, 2 and 3 Inspection at: Oconee site near Seneca, South Carolina Inspection conducted: February 25-29, 1980 Date of Last Physical Security Inspection Visit: September 5-7, 1979 Type of Inspection-na o nc hysical Security Inspectors:

.7-ASMd

,w J./C. Howell ~

Date

'

l W

3-W id ([

. Till' man Date Approved by:

+>2)

Y

,_W. J. Tobin, Acting Chfef, Safeguards Branch Date Inspection Summary Areas Inspected:

Included review of the licensee's security plan, security program audit, security organization, vital and protected area physical barriers, lighting, access controls, alarm stat. ion, detection and assessment aids, communi-cations, testing and maintenance, compensatory measures, response, keys / locks,

,

and records / reports.

,

The inspection involved 80 inspector hours on site by two NRC inspectors. The inspection was begun during an offshift period; 20 inspection hours were accom-plished during offshift periods.

Results: The licensee was found to be in compliance with NRC req.irements

.

within the areas examined during the inspection. The corrective action for a previously identified item of noncompliance (79-24-01) pertaining to a vital erea physical barrier was not completed and remains open.

S-72 %O

' Mk CC./_ __ _

c'

Copies

___. 7. _ W Thic Per*/ mt k not to be reprcduced withSut spccific approval cf II:II t.,,T_.., T-...e r.a n_,.n 8oo4e2o2 @

.

....

..

-

-

-