Integrated Inspection Report 05000266/2025002 and 05000301/2025002
ML25218A273
Person / Time
Site: Point Beach  
Issue date: 08/11/2025
From: Sanchez-Santiago E
NRC/RGN-III/DORS/RPB2
To: Edmonds T
Point Beach
References
IR 2025002
Download: ML25218A273 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2025002 AND 05000301/2025002

Dear Thad Edmonds:

On June 30, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On July 17, 2025, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Elba Sanchez Santiago, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2025002 and 05000301/2025002

Enterprise Identifier:

I-2025-002-0049

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

April 01, 2025, to June 30, 2025

Inspectors:

R. Farmer, Health Physicist

E. Magnuson, Reactor Inspector

J. Masse, Resident Inspector

V. Myers, Senior Health Physicist

C. Padilla, Reactor Inspector

M. Stafford, Senior Resident Inspector

Approved By:

Elba Sanchez Santiago, Chief

Reactor Projects Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period shut down for a refueling outage. On April 9, 2025, Unit 1 was restarted. On April 10, 2025, the unit was synchronized to the grid, and on April 13, 2025, the unit achieved full power. The unit remained at or near full power throughout the remainder of the inspection period.

Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of summer heat for the following systems:

A/C switchyard and control house on June 10, 2025.

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather prior to the arrival of severe thunderstorms on June 23, 2025.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)125 volt direct current (VDC) system on May 29, 2025

(2) Unit 1 containment spray system on June 11, 2025

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 auxiliary feedwater pump system on April 17, 2025.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zones 516 and 520:

Unit 1 containment 46' and 66' elevations on April 4, 2025

(2) Fire Zones 505 and 511:

Unit 1 containment 8' and 21' elevations on April 7, 2025

(3) Fire Zones 775, 776, and 777:

diesel generator G04 areas, 26' elevation on May 7, 2025

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on April 14, 2025.

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (2 Samples)

(1) The inspectors evaluated internal flooding mitigation protections in manholes 1 and 66a.
(2) The inspectors evaluated internal flooding mitigation protections in the vital switchgear room and the D05 station battery room.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Unit 1 component cooling water heat exchangers, HX-012 A and B

===71111.08P - Inservice Inspection Activities (PWR) The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities in Unit 1 during refueling outage

==1R42 from March 23, 2025, to April 4, 2025.

==

PWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding Activities (IP Section 03.01)===

The inspectors verified that the following nondestructive examination and welding activities were performed appropriately:

(1) Ultrasonic Examination
  • Dye Penetrant (PT) Exam of SI-2501R-5-SI10-IWA Welded Pipe Attachment, Cat. B-K, Item B10.20 Visual Examination
  • VT-3 of SI-601R-2-R195 Welded Pipe Sleeve Guide, Cat. F-A, Item F1.20B
  • VT-3 of SI-2501R-5-SI-10 Welded Sliding Support, Cat. F-A, Item F1.10B Welding Activities

Base Metal Repair of Component Cooling Water HX-12C Flange Surface (WO 40849148-18)o Replacement of Reactor Coolant Pump Seal Bypass Line (WO 40605130-05)

PWR Inservice Inspection Activities Sample - Vessel Upper Head Penetration Inspection

Activities (IP Section 03.02) (1 Sample)

The inspectors verified that the licensee conducted the following vessel upper head penetration inspections and addressed any identified defects appropriately:

(1) Bare Metal Visual of Unit 1 Reactor Pressure Vessel Top Head PWR Inservice Inspection Activities Sample - Boric Acid Corrosion Control Inspection Activities (IP Section 03.03) (1 Sample)

The inspectors verified the licensee is managing the boric acid corrosion control program through a review of the following evaluations:

(1) Boric Acid Evaluations
  • BAS 25-054-E RPV Head Flange Corrective Action Documents
  • Performed on March 24, 2025

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 1 approach to criticality following refueling outage 42 on April 9, 2025.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated license operator requalification training in the simulator on April 30, 2025.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Elevated risk due to emergency diesel generator G-01 and G-04 failures on April 21, 2025
(2) Elevated risk during 4.16KV Undervoltage Matrix Relays 31-Day Surveillance Test on June 10, 2025
(3) Elevated risk during 125 VDC station battery replacement on June 25, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1) Operability of main steam safety relief valve following identification of piping inlet flange damage
(2) Operability determination in response to substance found on reactor vessel head and reactor vessel flange
(3) Operability determination in response to water found in containment core holes
(4) Operability determination in response to ground found on 125 VDC Battery
(5) Operability of emergency diesel generator, G-01, left air bank
(6) Operability of emergency diesel generator, G-04, following identification of frequency issues

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Change to component cooling water surge tank relief valve maintenance plan

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated Unit 1 refueling outage 42 activities from April 1, 2025, to April 16, 2025.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1) Pressure test for new valves added to an existing containment penetration, on April 17, 2025
(2) IT 300D Train B, main feedwater isolation valve testing after replacement of valve actuator on April 23, 2025
(3) Turbine-driven auxiliary feedwater pump following 10-year maintenance overhaul on April 28, 2025

Surveillance Testing (IP Section 03.01) (2 Samples)

(1) ORT 3B, safety injection with loss of AC test on April 15, 2025
(2) IT 05, train B containment spray pump surveillance on May 28, 2025

Containment Isolation Valve (CIV) Testing (IP Section 03.01) (1 Sample)

(1) Mechanical penetration CPP-41 local leak rate test, April 2, 2025

71114.06 - Drill Evaluation

Required Emergency Preparedness Drill (1 Sample)

(1) Point Beach second quarter pre-exercise emergency preparedness drill on May 6,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.

Contamination and Radioactive Material Control (IP Section 03.03) (2 Samples)

(1) Workers and equipment leaving the Unit 1 containment
(2) Workers and equipment leaving the radiologically controlled area

Radiological Hazards Control and Work Coverage (IP Section 03.04) (3 Samples)

The inspectors evaluated the licensees control of radiological hazards for the following radiological work:

(1) Removal of a liquid radioactive waste line valve
(2) Removal of tri-nuke filters from the reactor cavity
(3) Reactor vessel reassembly activities High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (3 Samples)

The inspectors evaluated licensee controls of the following high radiation areas (HRAs)and very high radiation areas (VHRAs):

(1) Temporary HRA and locked high radiation area (LHRA) controls for fuel movement
(2) Demineralizer cubicles LHRAs
(3) Tri-nuke removal HRA controls Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (3 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Units 1 and 2 Drumming Area Vents
(2) Liquid Radwaste disposal system
(3) Unit 1 service water effluent monitor and associated piping

Sampling and Analysis (IP Section 03.02) (4 Samples)

Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:

(1) Recirculation and sampling of monitoring tank A
(2) Unit 2 steam generator blowdown filter outlet sampling
(3) Wastewater effluent grab and composite sampling
(4) Unit 1 service water overboard sampling

Dose Calculations (IP Section 03.03) (3 Samples)

The inspectors evaluated the following dose calculations:

(1) Auxiliary building vent stack continuous release, October 2024
(2) Gaseous waste 31-day dose projection for third quarter 2024
(3) Liquid waste 31-day dose projection for third quarter 2024

Abnormal Discharges (IP Section 03.04) (2 Samples)

The inspectors evaluated the following abnormal discharges:

(1) Gaseous discharge from leak in waste gas system, July 2023
(2) Gaseous discharge from hole cut in the roof of the primary auxiliary building, July

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (April 1, 2024, through March 31, 2025)
(2) Unit 2 (April 1, 2024, through March 31, 2025)

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 1 (April 1, 2024, through March 31, 2025)
(2) Unit 2 (April 1, 2024, through March 31, 2025)

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program to identify potential trends in past operability reviews that might be indicative of a more significant safety issue.

INSPECTION RESULTS

Very Low Safety Significance Issue Resolution Process: Qualification Review of Radiation Protection Manager 71124.06 This issue is a current licensing basis question and inspection effort is being discontinued in accordance with the Very Low Safety Significance Issue Resolution (VLSSIR) process.

No further evaluation is required.

Description:

Technical Specification 5.3.1 states: Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, as supplemented by Regulatory Guide 1.8, Revision 1, September 1975, for comparable positions, except for positions not related to this review.

Technical Specification 5.3.3 states: In the event the position of Health Physicist is vacated and the proposed replacement does not meet all the qualifications of Technical Specification (TS) 5.3.1, but is determined to be otherwise well qualified, the concurrence of NRC shall be sought in approving the qualification of that individual.

The inspectors noted that ANSI 18.1-1971 included a defined standard for the qualification for the Radiation Protection Professional. The NRC endorsed these standards for all positions except for Radiation Protection Supervisor or Manager. The NRC determined that more specialized expertise beyond qualifications presented in ANSI N18.1-1971 was needed. Regulatory Guide 1.8-September 1975 was developed by the NRC to address these shortcomings and described the experience and background necessary to provide sound judgement for safe and successful operation of the plant. Some of these qualities covered in the document included:

  • The Radiation Protection Manager (RPM) should be an experienced professional in applied radiation protection at nuclear facilities dealing with radiation protection problems and programs similar to those at nuclear power stations;
  • The RPM should be familiar with the design features and operations of nuclear power stations that affect the potential for exposures of personnel to radiation; and
  • The RPM should have the technical competence to establish Radiation Protection Programs and the supervisory capability to direct the work of professionals and technicians, required to implement the radiation protection programs.

Additionally, Regulatory Guide 1.8-September 1975 prescribed these experiences to ensure the qualities were present:

  • The RPM should have a bachelors degree or the equivalent in a science or engineering subject, including some formal training in radiation protection;
  • The RPM should have at least 5 years of professional experience in applied radiation protection; and
  • At least 3 years of this professional experience should be in applied radiation protection work in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power stations, preferably in an actual nuclear power station.

Although not part of the licensing basis, the inspectors reviewed the Health Physics Positions (HPPOS) Database (NUREG/CR-5569, Rev. 1, 1994), which is a compilation of NRC staff positions on a wide range of topics involving radiation protection (health physics). The HPPOS Database was developed by the NRC to help ensure uniformity in inspections, enforcement, and licensing actions and, although they are not typically defined in licensing basis documents, they constitute the NRCs understanding of the applicable requirements and policies and therefore they are especially pertinent to oversight.

The inspectors noted that the topic of professional experience for the RPM was previously addressed and documented in HPPOS-018, HPPOS-020, and HPPOS-172. HPPOS-018 concluded that technician experience was not equivalent to professional experience.

HPPOS-020 concluded that the attributes of a good RPM are considered to be gained almost exclusively by specialized on-the-job, practical and supervisory experience rather than through the broad generalized academic training received by a person with a bachelors degree. Furthermore, HPPOS-172 described that individuals whose radiation protection experience is limited to narrow specialty positions with small support staff should not be expected to meet the requirements for the broad spectrum and scope of operating activities and the worker safety implications associated with positions that have first line foreman/supervisors reporting to them. Therefore, while the professional experience, as described in Regulatory Guide 1.8-September 1975 is not explicitly defined, the staffs positions, as discussed in the HPPOS, indicate that

(1) professional experience cannot be met by technician-level experience alone,
(2) the applicable experience must be sufficiently broad (i.e., not limited to narrow specialty positions) and
(3) that the experience is in applied radiation protection, preferably at a nuclear power station such that the candidate has the supervisory capability to direct the work of professionals and technicians, required to implement the Radiation Protection Programs.

In reviewing the qualifications of the incumbent RPM, the inspectors reviewed the individuals Employee Qualification Record--completed as required by station procedure NP 1.1.18, and identified the applied radiation protection experience that was credited in the record was fulfilled with 7 years as an Engineering Laboratory Technician (ELT) in the U.S. Navy and include a listing of specific activities performed by the incumbent RPM as an ELT.

The inspectors assessed these activities performed by an ELT were tasks typically performed by radiation protection technicians at operating nuclear power stations. However, these activities do not appear to demonstrate the professional experience required of the RPM position as described above. The inspectors determined that, consistent with HPPOS-018, the 7 years of technician-level applied radiation protection experience provided in the Employee Qualification Record may not alone be used to satisfy the 5 years of professional experience in applied radiation protection specified for the RPM position in Regulatory Guide 1.8-September 1975.

The licensee provided another document titled Regulatory Position Paper - Point Beach Nuclear Radiation Protection Manager Qualifications. This document provided significant details associated with the individuals work experience in the 14 years since leaving the Navy. The inspectors identified that while most of this work experience since leaving the Navy was outside of the radiation protection organization, the experiences did include some aspects that might satisfy the staff positions regarding professional experience described above.

Subsequently, the inspectors determined considerable staff effort would be required to resolve this issue to finality. For example, it may be necessary to interpret terms like professional experience, technician experience, equivalent experience, preferable experience, or technical competence used in Technical Specification 5.3.1 and ANSI N18.1-1971, as supplemented by Regulatory Guide 1.8, Revision 1, September 1975, in light of the combination of the individuals Navy and post Navy experience. Additionally, the staff would have to resolve questions of applicability of these new, more detailed definitions to the licensing basis of the facility.

Licensing Basis: Technical Specification 5.3.1 states: Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971, as supplemented by Regulatory Guide 1.8, Revision 1, September 1975, for comparable positions, except for positions not related to this review.

Regulatory Guide 1.8-September 1975 states that:

  • The RPM should have at least 5 years of professional experience in applied radiation protection; and
  • At least 3 years of this professional experience should be in applied radiation protection work in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power stations, preferably in an actual nuclear power station.

Significance: Technical Specification 5.3.3 provides the licensee flexibility for cases when the proposed replacement does not meet all the qualifications of Technical Specification 5.3.1, but is determined to be otherwise well qualified, the concurrence of NRC shall be sought in approving the qualification of that individual. The inspectors discussed the details provided in the Regulatory Position Paper - Point Beach Nuclear Radiation Protection Manager Qualifications document with a Technical Reviewer from the Nuclear Reactor Regulation (NRR) program office. The staff preliminarily determined that based on the detailed description of the individuals experience including their 14-year tenure of employment with the licensee there was reasonable basis that the NRC may concur with a request to make this individual the RPM under Technical Specification 5.3.3.

For the purposes of the VLSSIR process, the issue of concern was screened through IMC 0609, Appendix C and D and determined it would likely be Green had a performance deficiency been identified.

Technical Assistance Request: The inspectors did not enter either the Task Interface Agreement or Technical Assistance Request process. However, the inspectors contacted the cognizant branch in the Office of NRR as expressed in the description above.

Corrective Action Reference: Not required Observation: Semi Annual Trend on Past Operability 71152S The inspectors completed a review of 22 condition reports initiated over the past 2 years that referenced past operability reviews. The inspectors provided several observations during this review. Three of these observations pertained to minor errors in the licensees implementation of their past operability process and corrective action program:

  • The inspectors identified one example where the licensee failed to initiate a new condition report to address past operability when the original condition report had already been screened and new information became available. This is contrary to step 4.1.5 of licensee procedure PI-AA-104-1000, Condition Reporting.
  • The inspectors identified two occasions where the licensee changed or deleted portions of operability determinations once new information became available instead of appending the new information. This is contrary to steps 4.3.3 and 4.3.7 of licensee procedure PI-AA-104-1000, Condition Reporting.

In addition, one condition report the inspectors reviewed had a past operability review completed but did not address the effect that the deficiency had on the ability of the component to complete its safety function. This is related to a pressurizer safety lifting above its setpoint. The licensee called for and completed a past operability review. Section 7.C of EN-AA-203-1001-F03, Past Operability/Functionality Review (POR) Form, directed, Discuss why the degraded or nonconforming condition did or did not prevent the SSC [structure, system, or component] from performing its required function(s). (Include any known information that supports the specific evaluation, any adverse impact about the condition, any TS violation, or related analysis). To address this, the licensee discussed how the condition was not reportable as opposed to discussing the impact that the valve lifting above its setpoint would have on the reactor coolant system, technical specifications, and/or the safety limits. Section 7.C was not intended to address the reportability of this deficient condition but rather what impact it had on the system.

Once this impact was determined, the licensee could then evaluate if the issue was or was not reportable.

Another condition report pertained to one of the safety related containment accident fans.

The licensee found that a discharge damper for a non-safety containment cooling fan was not capable of fully closing, thereby challenging the operability of one of the containment accident fans. In this instance, the licensee did not perform a past operability review, citing historical equipment performance. The evidence presented was that the fan had previously passed all its surveillance tests. However, these tests did not measure the total flow rate or monitor the position of the discharge damper. Without firm evidence to support past operability the licensee should have performed a past operability review. This is contrary to step 4.5.1 of licensee procedure EN-AA-203-1001, Operability Determinations.

All these examples represent minor performance deficiencies associated with the licensees past operability review process. This review was focused on the licensees implementation of past operability. The inspectors previously reviewed the technical aspects of these issues in past inspection reports and did not identify any performance deficiencies. These observations have been captured in the licensees corrective action program for disposition.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 17, 2025, the inspectors presented the integrated inspection results to Thad Edmonds and other members of the licensee staff.
  • On April 3, 2025, the inspectors presented the radiation protection inspection results to Rick Welty, Radiation Protection Section Supervisor, and other members of the licensee staff.
  • On April 4, 2025, the inspectors presented the Inservice inspection results to Michael Durbin, Site Vice President and other members of the licensee staff.
  • On July 14, 2025, the inspectors presented the radiation protection inspection results to Kim Locke, Principal Engineering Analyst - Licensing, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

2518070

NRC Identified Items during Yard Walkdown

06/23/2025

AOP-13C

Severe Weather Conditions

71111.01

Procedures

OP-AA-102-1002

Seasonal Readiness

2513778

CL 13E Part 1 - Auxiliary Feedwater Valve Lineup

Turbine-Driven Unit 1

04/18/2025

2513779

CL 13E Part 2 - Auxiliary Feedwater Valve Lineup

Motor Driven

04/18/2025

2513780

M-217 - Auxiliary Feedwater System

04/18/2025

2513781

M-2217 - Auxiliary Feedwater System

04/18/2025

2513782

NRC Comments Following U1 AFW Walkdown

04/18/2025

Corrective Action

Documents

Resulting from

Inspection

2513834

Steam Leak from Packing on Valve

04/20/2025

110E017, Sheet 3

P&ID Safety Injection System

E-6, Sheet 1

25V DC Dist. System

M-201 Sheet 1

P&ID Main & Reheat Steam System

M-207 Sheet 1A

P&ID Service Water

M-217 Sheet 1

P&ID Auxiliary Feedwater System

107

M-217 Sheet 2

P&ID Auxiliary Feedwater System

Drawings

M-217 Sheet 3

P&ID Auxiliary Feedwater System

MDB 3.2.12 D01

DC Distribution

MDB 3.2.12 D11

DC Distribution

Miscellaneous

MDB 3.2.12 D16

DC Distribution

CL 13E Part 1

Auxiliary Feedwater Valve Lineup Turbine-Driven Unit 1

CL 13E Part 2

Auxiliary Feedwater Valve Lineup Motor Driven

71111.04

Procedures

CL 7A

Safety Injection System Checklist Mode 1, 2, 3, and 4

(with Both ECCS Trains Aligned for Injection) Unit 1

71111.05

Corrective Action

Documents

2513372

Crew F Fire Brigade Communications

04/14/2025

PFP-0-PAN-

NNSR

Pre-Fire Plan Protected Area North (Inside the Fence)

Fire Plans

PFP-1-CONT-

FAC

Pre-Fire Plan Unit 1 Containment Building/Facade

Miscellaneous

FFPDB

Appendix F of the Fire Protection Design Document, Fire

Safety Analysis, A71 - Combined DG Building, Train B Areas

NP 1.9.14

Fire Protection Plan

71111.05

Procedures

PC 74

Guideline for the Conduct and Evaluation of Fire Brigade

Drills

2014-0007

Allowable Flood Levels

Calculations

2014-02058

Internal Flooding Effects

Corrective Action

Documents

2514745

Z-066A Manhole Found with High Water Level

05/05/2025

Drawings

PBE-816

Cable Vault Locations

Procedures

NP 8.4.17

PBNP Flooding Program

71111.06

Work Orders

40984462

Yearly (Spring) Electrical Manhole Sump Inspections

Corrective Action

Documents

2511525

PBN 2025 Thermal Performance Testing HX-012A/B

03/26/2025

Miscellaneous

Report D-12091

Component Cooling Water (CCW) Heat Exchanger Thermal

Performance Test

71111.07A

Procedures

OI 152

Unit 1 Component Cooling System Heat Exchanger Data

Collection

WE-100091

Piping System Qualification Report

0E

Calculations

WE-100091

Piping System Qualification Report

2469009

Dry, White/Brown Boric Acid Found in Unit 1 Fuel Transfer

Tube

10/08/2023

2469557

NRC Identified - Potential Leak Chase Caulk Degradation

10/13/2023

2469663

Unit 1 A RCP Welded Attachment Liquid Penetrant

Indications

10/15/2023

2469673

Indications Found on RPV Stud and Washer

10/15/2023

2469871

Liquid Penetrant Exam Found on CCW Piping

10/17/2023

2470057

NRC Identified: Containment Moisture Barrier Degradation

10/19/2023

2470253

Indications on Spare RPV Stud

10/21/2023

2470313

Dry Light Boric Acid Streaking on CETNAs

10/22/2023

71111.08P

Corrective Action

Documents

2470714

Indications on Spare RPV Studs

10/26/2023

2471725

ISI Inspection Potential Violation 10 CFR 50.55

11/06/2023

2471727

ISI Inspection Potential Violation App B Criterion V

11/06/2023

2490484

Dry Boric Acid Leak on 1HX-3A in Contact with Bolting

07/11/2024

2498841

Missed Section XI R/R Form and Capacity Question

10/21/2024

2510978

Active Boric Acid Leak on 1SI-878D

03/20/2025

2511157

Active Boric Acid Indication on 1P-1A

03/22/2025

2511161

1CV-206C, Dried Boric Acid Indication Upstream of Valve

03/22/2025

2511163

1FM-3 Seal Table Fitting Boric Acid Indication

03/23/2025

2511180

1SC-955 Boric Acid Indication from Bonnet Fitting

03/23/2025

2511234

1CV-206C Boric Acid Found on Flange Just Below Valve

03/24/2025

25120216

Dry Boric Acid Residue on CETNAs 34, 35, and 37

03/31/2025

2511548

ER-AP-116-1000-F01 - Boric Acid Leak Screening

03/26/2025

Corrective Action

Documents

Resulting from

Inspection

2511578

Reduced Thread Engagement Anchor for Support

SI-2501R-5-R194

03/27/2025

Drawings

P-336 Sheet 6B

Pipe Hanger/Support Detail SI-2510R-5-R194

Engineering

Changes

300538

Analysis of Thread Anchor Engagement at Support

SI-2501R-5-R194

03/27/2025

LTR-SDA-20-

079-P

Point Beach Unit 1 Reactor Coolant Pump Flaw Assessment

for As-Found Indications during Fall 2023 Refueling Outage

Engineering

Evaluations

WEP-RV000-TM-

CD-000001

Point Beach Unit 1 O-ring Groove Foreign Material

Evaluation and Justification

2010VT-239

Visual Examination of RCP-A-Weld-B

03/21/2010

PB1-PT-25-001

Liquid Penetrant Examination of SI-2501R-5-SI10-IWA

04/02/2025

PB1-UT-25-003

Ultrasonic Examination of RC-03-PS-1001-08

03/31/2025

PB1-UT-25-005

Ultrasonic Examination of RC-03-PS-1001-09

03/31/2025

PB1-UT-25-007

Ultrasonic Examination of RC-03-PS-1001-10

03/31/2025

PB1-UT-25-009

Ultrasonic Examination of RC-03-PS-1001-11

03/31/2025

PB1-UT-25-011

Ultrasonic Examination of RC-10-PZR-1001-07

03/31/2025

PB1-UT-25-012

Ultrasonic Examination of RC-10-PZR-1001-05

03/31/2025

PB1-UT-25-013

Ultrasonic Examination of RC-10-PZR-1001-06

03/31/2025

PB1-VT-25-002

Bare Metal Visual Examination of Bottom Mounted

Instrumentation Nozzles

03/25/2025

PB1-VT-25-011

Visual Examination (VT-3) of SI-601R-R195

04/01/2025

NDE Reports

PB1-VT-25-012

Visual Examination (VT-3) of SI-2501R-5-SI-10

04/01/2025

PB1-VT-25-029

Bare Metal Visual Examination of RPV Closure Head

04/02/2025

DG-M10

Pipe Support Guidelines

DG-M18

Fastener Design Guideline

ER-AP-116-1000

Boric Acid Corrosion Control Program

ER-AP-116-1000-

10000

Boric Acid Corrosion Control Program Implementation

FP-PE-B31-

P8P8-GTSM-037

ASME Welding Procedure Specification

FP-PE-VIII-P1P1-

GTSM-042

ASME Welding Procedure Specification

FP-PE-WLD-02

General Welding Specification

NDE-173

PDI Generic Procedure for the Ultrasonic Examination of

Austenitic Piping Welds

NDE-451

Visible Dye Penetrant Examination Temperature

Applications 40F TO 125F

NDE-750

Visual Examination (VT-1) of Nuclear Power Plant

Components

Procedures

NDE-754

Visual Examination (VT-3) of Nuclear Power Plant

Components

Procedures

NDE-757

Visual Examination (VE) ASME Class 1 Components

Fabricated with Alloy 600/82/182 Materials

40605130-05

1P-001A / CONTG CorrectvFlange Misalignment EC298474

2/22/2023

40849148-18

HX-012C Contingency to Weld Repair Heat Exchanger

2/07/2023

71111.08P

Work Orders

40953371-01

U1 Cont Floor / U1 Examine Containment Floor Joints

10/22/2023

Miscellaneous

21C CPE

Scenario 2

As-Found

OP 1B

Reactor Startup

71111.11Q

Procedures

OP-AA-100-1000

Conduct of Operations

2513870

G-04 Emergency Diesel Generator Frequency Found

Out of Spec

04/20/2025

Corrective Action

Documents

2513889

G-01 Left Bank Air Start

04/21/2025

71111.13

Miscellaneous

Work Activity Risk Management Plans for

-(1)2 ICP 02.013 4.16KV Undervoltage Matrix Relays

31-Day Surveillance Test (TADOT)

-D-305 Battery Replacement and D-09 Charger

Maintenance-Battery Realignment to Support

Maintenance Activities

2ICP 02.13

4.16KV Undervoltage Matrix Relays Surveillance Test

NP 10.3.7

On-Line Safety Assessment

OI 168

Emergency Diesel Generator Operability

OI 35A

Standby Emergency Power Alignment

Procedures

WM-AA-100-1000

Work Activity Risk Management

2511582

1MS-2005, MSSV Inlet Piping Side Flange Damage

03/27/2025

2511801

Substance Found on Outer O-Ring Seating Groove

03/28/2025

2511850

Substance Found on Reactor Vessel

03/29/2025

2511930

Water Found Inside Core Hole CH-07 during Exam

03/30/2025

2513278

Negative Ground DC Side of D-07 Batt Charger

04/12/2025

2513321

1POS-02606 Water Damage Caused Ground Fault on D-07

04/13/2025

2513870

G-04 Emergency Diesel Generator Frequency Found out of

Spec

04/20/2025

Corrective Action

Documents

2513889

G-01 Left Bank Air Start

04/21/2025

71111.15

Drawings

M-201 Sheet 1

P&ID Main & Reheat Steam System

Engineering

Evaluations

EC-300566

Assessment of U1R42 As-Left Unit 1 Containment Liner

Plate EL 8-ft.

25-054-E

Boric Acid Indication Evaluation

04/01/2025

PB 271

Specification for Steam Generator Safety Valve

2/08/1994

RR 2025-011

Repair/Replacement Form - Piping EB-01-SP Inlet to

1MS-2005

03/27/2025

Miscellaneous

WEP-RV000-TM-

CD-000001

Point Beach Unit 1 O-ring Groove Foreign Material

Evaluation and Justification

RMP 9096-1

Reactor Vessel Head Removal and Installation Using Biach

Tensioning System

Procedures

MI 32.1

Flange and Closure Bolting

40931573-02

1R-1/Mech. Removal-Installation of RV Head

04/10/2025

40932143-07

U1 - Exam of Core Drilled Holes on El. 8' Containment

04/05/2025

41013039-01

1MS-02005 / Repair Piping Side Flange

03/31/2025

71111.15

Work Orders

41016058-01

G-04; Troubleshoot and Repair

04/25/2025

71111.18

Corrective Action

Documents

Resulting from

Inspection

2518624

PMC-25-000359 CC Surge Tank RV

07/01/2025

Miscellaneous

PMC-25-000359

Change 1CC-779 From the Outage to Online

03/14/2025

Procedures

MA-AA-204-

1000-10001

Preventive Maintenance Change Request (PMCR)

Corrective Action

Documents

Resulting from

Inspection

2512698

NRC Unit 1 Containment Closeout Walkdown Concerns

Apr 6, 2025

04/06/2025

OI 51

Spent Fuel Pool/Transfer Canal Doors

OP-AA-100-1000

Conduct of Operations

OP-AA-100-1002

Plant Status Control Management

71111.20

Procedures

RP 1A

Preparation for Refueling

109

2511235

1A52-83 Breaker Closure Time Not Recorded during ORT3B

03/24/2025

2511243

ORT 3B Step 5.4.13 (W-86)

03/24/2025

2512532

Valve Not Stroking Open

04/04/2025

2512812

1CS-3125 B MFIV Could Not be Opened

04/08/2025

2512935

1CS-3125 Opening Times

04/09/2025

Corrective Action

Documents

2513344

Spurious 1C-03 1D 4-5 A or B MFIV Trouble Alarms

04/14/2025

IST Program Document

Miscellaneous

IST Program Table - AF

IT 05 Train B

Train B Containment Spray Pump and Valves Unit 1

IT 08A

Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve

Test (Quarterly)

IT 300D Train B

Main Feedwater Isolation Valve Test Train B Unit 1

ORT 3B

Safety Injection Actuation with Loss of Engineered

Safeguards AC (Train B) Unit 1

ORT 58

Containment Test Connection Unit 1

Procedures

ORT 75

Mechanical Penetration Leak Test Unit 1

40687906-01

1CS-03125-O, Replace MFIV Operator Elastomers

04/08/2025

40687906-02

1CS-03125-O, Ops PMT/RTS Cycle per IT 300-D Train B

04/16/2025

40860071-01

ORT 3B, SI/Loss of AC (Train B) U1 (IPTE)

04/07/2025

40931678-02

1-62/P53A2 - Verify Relay Function during ORT 3C

04/05/2025

71111.24

Work Orders

41001405-09

1CPP-41 Operation Pre ORT 75 Unit 1

03/29/2025

71111.24

Work Orders

41001405-12

1CPP-41/Operation PMT (ORT 75 Unit 1 and ORT 58)

04/05/2025

2514970

25 NRC Pre-Ex: Communication Equipment Proficiency

05/08/2025

2514977

25 NRC Pre-Ex: Green Bay EOF Entryway

05/08/2025

Corrective Action

Documents

2515005

25 NRC Pre-Ex: Simulation Changed Post Validation

05/08/2025

25 Pre-Exercise Master Sequence of Events Listing for

the 2nd Quarter Emergency Preparedness Drill

71114.06

Miscellaneous

2Q25 EP Drill Combined Facility Critique Powerpoint

05/07/2025

2512185

HRA Postings

04/01/2025

Corrective Action

Documents

2512208

Personnel Uptake

04/02/2025

25-408

Work Area Air Sample for WL-1698

03/31/2025

25-409

General Area Air Sample for WL-1698

03/31/2025

PBPROD-M-

250401-15

Tri-Nuke filter transfer

04/01/2025

PBPROD-M-

250401-16

Tri-Nuke filter storage location

04/01/2025

PBPROD-M-

250401-24

Reactor Cavity during Head Set

04/01/2025

PBPROD-M-

250401-8

Surveys for work on valve WL-1698

03/31/2025

Radiation

Surveys

PBPROD-M-

250402

Reactor Cavity Decon

04/02/2025

25-1015

Cavity Activities

25-1016

Reactor Vessel Head - Removal/Reinstall

71124.01

Radiation Work

Permits (RWPs)

25-1052

Unit 1 Outage - Alpha Level 3 Areas

2436978

Alert received on RE-218 Waste Disposal System Liquid

Monitor

09/16/2022

2441697

RMS High Alarm and Trip Setpoint Found Conservatively

Low

11/12/2022

2465121

Flawed 2016 50.59 AD Allowed ODCM/TS 5.6.2 Disconnect

08/22/2023

2465123

Records of ODCM Revisions Lack Key Elements

08/22/2023

2467108

RE-218 Failed Source Check Prior To Discharge

09/17/2023

2468596

NA Finding - PBN ODCM Revision Practices Inconsistent

W/ TS

10/04/2023

2479373

Monitor Tanks Above Admit Limit due to U2 Fuel Defect

2/16/2024

71124.06

Corrective Action

Documents

2491194

Monitor Tank Discharges Challenged by RE-218 Capability

07/23/2024

2508585

New RMS Iodine Cartridges Unable to Be Analyzed

2/21/2025

2509718

PB - Failure to update ODM with Changing Conditions

03/06/2025

2513883

Charcoal Filters for PAB Hole in Roof Were Never Counted

04/21/2025

23-00008LB

Permit for Liquid Batch Release From Monitor

Tank B (B-MT)

2/07/2023

23-00081GB

Permit for Abnormal Gaseous Release from Gas Decay

Tank C

07/12/2023

Miscellaneous

24-00034LB

Permit for Liquid Batch Release from Monitor Tank A (A-MT)

10/17/2024

24-00045GC

Permit for Continuous Gaseous Release from Auxiliary

Building Vent Stack

11/15/2024

24-00075GC

Permit for Abnormal Gaseous Release from Primary

Auxiliary Building (PAB) Hole in the Roof

04/05/2025

25-00041LB

Monitoring Tank A Discharge Permit

05/07/2025

L-2024-067

23 Annual Monitoring Report

04/26/2024

L-2025-086

24 Annual Monitoring Report

04/30/2025

Data Sheet 6, RMS Assessment Worksheet, for Discharge

24-00034LB

10/14/2024

PBF-7072

ODCM Change Documentation

08/28/2024

Miscellaneous

SCR 2024-047

Screening for ODCM Revision

CAMP 032

Preparation of Batch Liquid and Gaseous Effluent Permits

Using RADEAS Software

CAMP 401

Radioactive Standards and Sample Placement for

Multichannel Analyzer Calibration and Quantification

CAMP 701

Secondary System and Water Treatment Plant Sample

Points

HPIP 3.52.1

Radiological Sampling for Release Accountability

Offsite Dose Calculation Manual

Offsite Dose Calculation Manual

Offsite Dose Calculation Manual

Procedures

OI 140C

Standard Radioactive Batch Liquid Release-Monitor Tanks

1_2023-07-

11_002

Gamma Isotopic Results for release permit 23-00081GB

07/11/2023

25-574

Airborne Radioactivity Survey - DAVS Isokinetic

05/06/2025

71124.06

Radiation

Surveys

3_2024-10-

14_015

Gamma Isotopic for First Sample for Discharge 24-00034LB

10/14/2024

3_2024-10-

14_016

Gamma Isotopic for Second Sample for Discharge

24-0034LB

10/14/2024

3_2024-10-

15_002

Gamma isotopic for in progress sample for discharge

24-00034LB

10/15/2024

4_2023-07-

10_006

Gamma Isotopic Results for Release Permit 24-00075GC

07/10/2024

71151

Procedures

OI 55

Primary Leak Rate Calculation

2451761

2RC-00435 SN XX05950175 PZR Safety Failed As-Found

Testing

03/21/2023

2457774

D-504-7 Breaker was Over High Tol. Limit

05/16/2023

2465050

M&TE - MCTC-005 (Engineering Review Needed)

08/21/2023

2469217

While Performing 1ICP 04.025 Found Out of Tolerances

10/10/2023

2469618

Breaker Cubicle Left Side Rail Racking Indicator Tabs Bent

10/14/2023

2471588

1CC-751 Relief Valve Failed Its As-Found Test

11/03/2023

2486793

SW-001A2-A Second Blade Disconnected from Damper

Shaft

05/21/2024

Corrective Action

Documents

2501382

2SI-887 Failed As-Found Test

11/12/2024

2510100

EN-AA-203-1001 - Operability Determinations

03/11/2025

2510102

CR 2469618 Completed w/o ENG Review of Past

Operability

03/11/2025

2519608

PBN SRI POR Trend Review Process Concerns

07/16/2025

Corrective Action

Documents

Resulting from

Inspection

2519609

Minor Performance Deficiencies on Documenting PORs

in CAP

07/16/2025

EN-AA-203-1001

Operability Determinations

71152S

Procedures

PI-AA-104-1000

Condition Reporting

46