Text
May 11, 1998
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/98010(DRS);
50-301/98010(DRS))
Dear Mr. Patuiski:
This will acknowledge receipt of your letter dated April 30,1998, in response to our letter dated April 1,1998, transmitting a Notice of Violation associated with inspection Report No.
50-266/98010(DRS); 50-301/98010(DRS) at the Point Beach Nuclear Plant. We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.
Sincerely, original /s/ J. A. Grobe John A. Grobe, Director Division of Reactor Safety Docket Nos.: 50-266; 50-301
,
i Enclosure: Ltr dtd 4/30/98 from S. A. Patulski, l
See Attached Distribution DOCUMENT NAME: G:DRSiPO105118.TY (See Previous Correspondence)
ro,.c.~...., om...eum.m.. u we c cwy e se-ve. r. c,y e.n.o-inue.
w. No c.
OFFICE Rlli Rill l
Rlli Rlli
,,a NAME Mendez:sd W
Jacobson y
McCormickBarger+ GrW
)
j DATE 05/ /98 05/ /98 05/ /98 05/4/98
)
\\
OFFICIAL RECORD COPY l
9805180384 980511
ga
^= = osooo m PDR
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/08010(DRS);
'
l 50-301/98010(DRS))
{
l l
Dear Mr. Sellman:
This will acknowledge recelpt of your letter dated April 30,1998, in response to our letter j
l l-dated April 1,1998, transmitting a Notice of Violation associated with Inspection Report No.
!
l 50-266/98010(DRS); 50-301/98010(DRS) at the Point Beach Nuclear Plant. We have reviewed
!
your corrective actions and have no further questions at this time. These corrective actions will be l
'
examined during future inspections.
Sincex.,'y,
!
!.
,
John A. Grobe, Director I
l Division of Reactor Safety I
f Docket Nos.: 50-266;50-301 Enclosure: Ltr dtd 4/30/98 from S. A. Patulski, j
Wisconsin Electric to USNRC See Attached Distribution DOCUMENT NAME: G:DRS\\ pol 05118.TY
'
r.
e.
. con oe inuocumw mm.i. m in. w c cm eeut.nmv=*u.
r em en.n.cnm.num*=ur. v. no ew OFFICE Rlli l
Rlli lW Rlli d
Rlll
~
l NAME Mendez:sd A) t Jacobson K V McCormickBarger. Grobe
&
DATE 05/ff/98 05/3/98 05/(1/98 P'J05/ /98 OFFICIAL RECORD COPY
]
- _ _ _ _ _
. - _ - _ - - _ _ _ _ _ - _- _ __ _ _ _ _. _ _ __ _ _ --_ _ _ __ -_ - _ - -__ _ _ - __ ___ _ __ _ __ _ _
__
'
.,.-
M. Sellman
cc w/ encl:
R. R. Grigg, President and Chief Operating Officer, WEPCO M. Reddeman, Plant Manager i
J. H. O'Neill, Jr.
I Shaw, Pittman, Potts & Trowbridge i
K. Duveneck, Town Chairman Town of Two Creeks B. D. Burks, P.E., Director Bureau of Field Operations Cheryl L. Parrino, Chairman Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer Distribution:
CAC (E-Mail)
Project Mgr., NRR w/enci l
A. Beach w/ enc!
J. Caldwell w/ encl B. Clayton w/ encl SRI Point Beach w/enci DRP w/ encl TSS w/enci DRS w/enci Rlli PRR w/ encl PUBLIC IE-01 w/ enc!
Docket File w/enci GREENS l
[
_ - _ _ _ _ _ - _ _ _ - _ _
_
W Y
&ahp
-
Wisconsin Electnc POWER COMPANY l
Point Beoch Nuclear Plant (920) 755-2321 I
6610 Nuclear Rd.. Two Rivers, WI S4241
!
NPL 98-0323 10 CFR 2.201 l
April 30,1998 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555 Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 50-266/98010(DRS) AND 50-301/98010(DRS)
POINT BEACII NUCLEAR PLANT, UNITS 1 AND 2 In a letter from Mr. John A. Grobe dated April 1,1998, the Nuclear Regulatory Commission forwarded the results of an inspection conducted by your staff at our Point Beach Nuclear Plant. The inspection was completed on March 18,1998. The purpose of the inspection was to review the measuring and test equipment (M&TE) procedures and the control of M&TE. The inspection report included a Notice of Violation that identified one violation ofNRC requirements.
We have reviewed the Notice of Violation and pursuant to the provisions of 10 CFR 2.201, have prepared a written response to the violation as requested by your letter of April 1,1998. Our written response to the violation is included as an attachment to this letter.
We believe that the attached reply is responsive to the Notice of Violation and fulfills the requirements identified in your April 1,1998, letter.
If you have any questions or require additional information regarding this response, please contact me.
Sincerely,
-
/
-
.
Scott A. Patulski Site Vice President Point Beach Nuclear Plant l
Attachment ec:
NRC Regional Administrator N'RC Resident Inspector NRC Project Manager PSCW W0
$-f. h$p f C3g--- d wA&q of Hixomkr Exq uupnks
_
. _ _ _ - _ -
_________________ _ _ _ _ _ - __ _ _ -
_
Attachment to NPL 98-0323
<
4/30/98 Page1
. REPLY TO A NOTICE OF VIOLATION NRC INSPECTION ' REPORTS 50-266/98010(DRS) AND 50-301/98010(DRS)
l POINT BEACII NUCLEAR PLANT UNITS 1 AND 2 During an NRC inspection completed on March 18,1998, one violation of NRC requirements was identified. Inspection Reports 50-266/98010(DRS) and 50-301/98010(DRS) and the Notice of Violation (Notice) transmitted to Wisconsin Electric on April 1,1998, provide details regarding the violation.
In accordance with the instructions provided in the Notice, our reply to the violation includes: (1) the reason for the violation, or if contested, the basis for disputing the violation; (2) the corrective action taken and the results achieved; (3) corrective action to be taken to avoid further violations; and (4) the
,
date when full compliance will be achieved.
'
Violation 1:
l
" Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion XVI, ' Corrective Action,'
requires, in part, that measures be established to assure that conditions adverse to quality, such as deficiencies and deviations are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures shall assure that the cause of the conditions is determined and corrective action taken to preclude repetition.
,
Contrary to the above, as of March 13,1998 the licensee failed to establish measures to assure that conditions adverse to quality were promptly identified and corrected. Specifically the licensee failed to adequately review or analyze the effects on permanent plant equipment for out-of-tolerance, damaged, orlost measuring and test equipment. The following measuring and test equipment was not evaluated:
OPSDH-002, OPSDP-001, OPSSW-009, OPSTW-002, MCLC-001 and MCCP-007. In addition, damaged instrument MCMA-003 was evaluated but the evaluation did not consider, in the absence of as-found data, the out-of-tolerance error or the need for retesting of plant equipment tested by the instrument.
This is a Severity Level IV violation (Supplement 1)."
Response to Violation 1:
Reason for Violation:
We concur this is a violation ofNRC requirements as characterized in the inspection report. The violation occurred as a result of a lack of a comprehensive M&TE program at Point Beach Nuclear Plant. As documented in the inspection report, there were three different administrative processes governing M&TE in various plant groups. As further documented, Wisconsin Electric, the licensee, had previously recognized in October,1997, the three M&TE procedures were not providing adequate guidance and contained conflicting requirements. Process improvements to the M&TE program were in progress at the time of this inspection. These improvements, which included corrective actions resulting from our QA audits and self-assessments, were in progress at the time this inspection was conducted.
t
__
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ - _ _ _ _ _
..
'
,4 Attachment to NPL 98-0323 4/30/98 Page 2 Corrective Actions Taken:
Programmatic corrective actions were completed on April 8,1998, with the issuance of revised administrative procedure NP 8.7.1, " Measuring and Test Equipment," Revision 3. The procedure revision provides a comprehensive process for control ofM&TE. Administrative procedures NP 8.7.2,
" Calibration and Control of Measuring and Test Equipment (Instmment and Control)," and OM 5.4.9, l
" Control of Operations Department Measuring and Test Equipment," were also canceled.
)
l In addition to'the above programmatic corrective actions, the following specific corrective actions were j
taken to address the individual instmments identified in the Notice of Violation-J I
~
Unevaluated Current Condition M&TE Description Condition Status Evaluation Results Report OPSDH Digital Lost Retired Reviewed CHAMPS use record, 98-1076-002 Hygrometer none found. No rework.
OPSDP-Digital Lost -
Retired Reviewed CHAMPS use record,-
98-1039 001 Pyrometer none found. No rework.
OPSSW Stopwatch Lost Retired Reviewed CHAMPS use record, 98-1077-009 -
none found. No rework.
'
OPSTW Torque Lost Retired Reviewed CHAMPS use record, 98-1078-002 Wrench none found. No rework.
MCLC-Load Cell Out-of-Calibration Replaced Not applicable.
98-1636
)
001
)
MCCP-Current Damaged Retired Validated use. No rework.
98-1137
'l 007'
Probe
'
MCMA-Multi-Amp Damagedin shipment Repaired Vendor replaced damaged parts 98 0654 003 SR-90 for scheduled and obtained as-found data i
calibration.
within tolerance. No rework.
As can be seen from the above table, Condition Reports were initiated for each of the instruments
identified in the Notice of Violation. Most of the specific corrective actions identified for resolution of j
each instrument have been completed. There are two corrective actions outstanding associated with
'
Condition Report 98-1636 remaining to be completed. Completion of these actions is being managed l
via our Condition Reporting system.
-
l Corrective Action To Be Taken:
j There are no corrective actions required to preclude future recurrence of this type of violation.
Date OfFull Compliance:
t f
Full compliance with NRC requirements was achieved on April 8,1998, when the programmatic i
L changes to our M&TE program were implemented with the revision and issuance of NP 8.7.1.
'
,
,