IR 05000266/1998003
| ML20217P600 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/30/1998 |
| From: | Mccormickbarge NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| References | |
| 50-266-98-03, 50-266-98-3, 50-301-98-03, 50-301-98-3, NUDOCS 9805060358 | |
| Download: ML20217P600 (2) | |
Text
April 30, 1998
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/98003(DRP);
50-301/98003(DRP))
Dear Mr. Patuiski:
This will acknowledge receipt of your letter dated April 20,1998, in response to our letter dated March 21,1998, transmitting a Notice of Violation associated with Inspection Report No. 50-266/98003(DRP); 50-301/98003(DRP). We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.
Sincerely, 1am/ James W. McConnick-Baraer s
es W. McCormick-Barger, Chief Reactor Projects Branch 7 Docket Nos.: 50-266; 50-301 cc:
R. R. Grigg, President and Chief Operating Officer, WEPCO A. J. Cayia, Plant Manager B. D. Burks, P.E., Director Bureau of Field Operations Cheryl L. Parrino, Chairman Wisconsin Public Service Commission State Liaison Officer DOCUMENT NAME: P:\\POIN\\ pol 98003.ty
{
To receive e copy of this document, indicate in the box "C" = Copy without attachment! enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rill lt l
l l
7 NAME JMcC-Barger\\ml(km
"
DATE 04/so/98 OFFICIAL RECORD COPY 990506035[ M,o w e 430 7-g L
<
.
.
.
_ _ _ _ - _ _.
. - - _ _. _.
-
.
..
S. Patulski-2-Qigtribution:
CAC (E-Mail)
Project Mgr., NRR A. Beach J. Caldwell B. Clayton SRI Point Beach.
Rlli PRR PUBLIC IE-01 -
Docket File-GREENS LEO (E-Mail)
' DOCDESK (E-Mail)
l
__ _ _-
_ - - - - _ - _