IR 05000266/1998006

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/98-06 & 50-301/98-06
ML20249A008
Person / Time
Site: Point Beach  
Issue date: 06/09/1998
From: Mccormickbarge
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
50-266-98-06, 50-266-98-6, 50-301-98-06, 50-301-98-6, NUDOCS 9806150307
Download: ML20249A008 (2)


Text

June 9, 1998

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-266/98006(DRP);

50-M1/98006(DRP))

Dear Mr. Patuiski:

This will acknowledge receipt of your letter dated June 3,1998, in response to our letter

)

dated May 5,1998, transmitting a Notice of Violation associated with Inspection Report 50-266/98006(DRP); 50-301/98006(DRP). We have reviewed your corrective actions and have no further quastions at this time. These corretive actions will be examined during future inspections.

Sincerely,

/s/ J. W. McCormick-Barger James W. McCormick-Barger, Chief Reactor Projects Branch 7 Docket Nos.: 50-266; 50-301 cc:

R. R. Grigg, President and Chief Operating Officer, WEPCO

/

M. B. Sellman, Chief Nuclear Officer M. E. Reddeman, Plant Manager o

J. H. O'Neill, Jr.

,

- Shaw, Pittman, Potts & Trowbridge l

K. Duveneck, Town Chairman Town of Two Creeks B. D. Burks, P.E., Director Bureau of Field Operations Cheryl L. Parrino, Chairman Wisconsin Public Service Commission S. Jenkins, Electric Division

. Wisconsin Public Service Commission State Liaison Officer DOCUMENT NAME: G:\\POIN\\ pol 98006.TY To receive a copy of this document, indicate in the box "C" = Copy without attachment /enckisure "E 's Copy with attachme,.venclosure "N" a No copy OFFICE Rill l E. Rlli l

Rill l

Rlli l-I NAME JMcB\\mi %yf/y S

DATE 06/4/98 06/ /98 06/ /98 06/ /98

"

OFFICIAL RECORD COPY

!

9906150307 990609

'

~

'

PDR ADOCK 05000266 G

PDR

-

- _ _ - _ _ _ _ _ - - - _,

- _ _,

-___. _ _ - _ _ _ _ _ - _ _ _ _ -. _ _ - _ _ _ _ _ _ _ - - _ _ _ _

_ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

.

1' Distribution:

,

l CAC

'

Project Mgr., NRR C. Paperiello J. Caldwell B. Clayton SRI Point Beach l.

DRP l

Tss

!

DRS (2)-

l RlliPRR l"

PUBLIC IE-01 l

Docket File

'

GREENS LEO j

DOCDESK i

I r

l-p 1500S3 i