IR 05000266/1998002

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/98-02 & 50-301/98-02.Staff Analysis of Why Previous C/As for Similar Violations Involving Vehicle Search Not Totally Effective
ML20246H026
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/18/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
50-266-98-02, 50-266-98-2, 50-301-98-02, 50-301-98-2, NUDOCS 9803250210
Download: ML20246H026 (6)


Text

- - - _ _ _ - _ _ _ __- - _ _ ___-____. .__ ____. __ - _ _ _

,..

g. r)

$

k

[w

!-

l , . March'18, 1998 l:

'

,.

'

Mr. S. Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road L .Two Rivers, WI 54241 l

SUBJECT: ' NOTICE OF VIOLATION (NRC INSPECTION REPORTS 50-266/98002(DRS);

'

50-301/98002(DRS)) .

Dear Mr. Patuiski:

,

This will acknowledge receipt of a letter dated March 9,1998, signed by Mr. A. J. Cayia of your staff, in response to our letter dated February 9,1998, transmitting a.Netice of Violation associated with the identification of your staffs failure to property search a vehicle and I

implement a security compensatory measure in a timely manner, and for your staffs inadequate l use of security response personnel at the Point Beach Nuclear Plant.

!

We have reviewed the corrective actions for the specific violations referenced above and your staffs' analysis of why previous corrective actions for similar violations that involved vehicle search and compensatory measures activities were not totally effective. We have no further questions at this time. Your corrective actions will be examined during future inspections.

Sincerely,

.

,

Original Signed by Harold O. Christensen

,

John A' Grobe, Director

.

Division of Reactor Safety Docket Nos. 50-266; 50-301 Enclosure: Ltr dtd 3/9/87 S. A. Patulski  !

Point Beach to USNRC ,/

See Attached Distnbution (SEE PREVIOUS CONCURRENCE)

DOCUMENT NAME: G:DRS\ pol 031).DRS e.co wwm.nu.neu. r.%c.

OFFICE Rlli l- Rlli Rlli l Rlli , b/

NAME TMadeda:Jp JCreed JMcCormick-B JGrobeM p

'

DATE- 03/ /98- 03/ /98 03/ /98 03/M96 OmCIAL RECORD COPY

-

9003250210 990318 7 ADOCK 05000266

'

PDR G PDR

. _ _ .. . __ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _

.- l lI ( b

.

Mr. S. A. Patulski l

Site Vice President i

Point Beach Nuclear Plant  !

6610 Nuclear Road

' Two Rivers, WI 54241 l

SUBJECT: ' NOTICE OF VIOLATION (NRC INSPECTION REPORTS 50-266/98002(DRS); ,

50-301/98002(DRS)) l

Dear Mr. Patulski:

This will acknowledge receipt of a letter dated March 9,1998, from Mr. A. J. Cayia of your staff, in response to our letter dated February 9,1998, transmitting a Notice of Violation associated with the identification of your failure to properly search a vehicle, implement a security compensatory measure in a timely manner, and inadequate use of security response personnel at your Point Beach Nuclear Plant.

We have reviewed your corrective actions for the specific violations referenced above and your analysis of why previous corrective actions for similar violations that involved vehicle search and compensatory measures activities were not totally effective. We have no further questions l at this time. Your corrective actions will be examined during future inspections. l

Sincerely, l

John A. Grobe, Director  !

Division of Reactor Safety Docket Nos. 50-266; 50-301 i Enclosure: Ltr did 3/9/87