IR 05000266/1980010

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-266/80-10 & 50-301/80-10 on 800604-27 & 0708.Noncompliance Noted:Rhr Pumps Operability Impaired & Engineered Safety Feature Crossconnected.Details Withheld (Ref 10CFR2.790)
ML19337A461
Person / Time
Site: Point Beach  
Issue date: 08/05/1980
From: Guldemond W, James Smith, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19337A459 List:
References
50-266-80-10, 50-301-80-10, NUDOCS 8009290015
Download: ML19337A461 (12)


Text

O

.

U.S. NUCLEAR REGULATORY COMMISSION

.

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

.

Report No. 50-266/80-10; 50-301/80-10 Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Licensee: Wisconsin Electric Power Company 231 West Michigan Milwaukee, WI 53203 Facility Name: Point Beach Nuclear Power Plant, Units 1 and 2 Inspection At: Point Beach Site, Two Creeks, WI Inspection Conducted: June 4 through 27, and July 8, 1980 P[5/J" d Inspectors:

J. D. Smith I /

.

$b W. G. Guldemon

o

/ '

>

/

Approvet By:

. Warnick, Chief

.

Reactor Projects Section 2

'

/

Inspection Summary Inspection on June 4 through 27, and July 8,1980 (Report No. 50-266/80-10; 50-301/80-10)

Areas Inspected: Routine, unannounced inspection conducted by resident inspectors during the period June 4 through June 27, and July 8, 1980, of Operational Safety Verification, Licensee Event Report Followup, IE Bulletin Followup, and IE Circular Followup. The inspection involved 180 inspector-hours onsite by two NRC inspectors. An Enforcement Conference was held on July 8, 1980, to discuss the recent increase in personnel errors.

The meeting involved 12 manhours by 4 NRC representatives.

800921900/5

.

. - -....

-

-.. -

..

.

_

-_

-_ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ ___.

Results: Of the four areas inspected, no items of noncompliance were

<

identified in two areas. Two items of noncompliance were identified in one area (Infraction-RHR pumps operability impaired-Par. 3d, Infraction-ESF buses crossconnected - Par. 3a). One item of noncompliance was identified in one area (Infraction-Uncontrolled vital area access - Par 2a).