IR 05000266/1980010
| ML19337A461 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/05/1980 |
| From: | Guldemond W, James Smith, Warnick R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19337A459 | List: |
| References | |
| 50-266-80-10, 50-301-80-10, NUDOCS 8009290015 | |
| Download: ML19337A461 (12) | |
Text
O
.
U.S. NUCLEAR REGULATORY COMMISSION
.
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
.
Report No. 50-266/80-10; 50-301/80-10 Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Licensee: Wisconsin Electric Power Company 231 West Michigan Milwaukee, WI 53203 Facility Name: Point Beach Nuclear Power Plant, Units 1 and 2 Inspection At: Point Beach Site, Two Creeks, WI Inspection Conducted: June 4 through 27, and July 8, 1980 P[5/J" d Inspectors:
J. D. Smith I /
.
$b W. G. Guldemon
o
/ '
>
/
Approvet By:
. Warnick, Chief
.
Reactor Projects Section 2
'
/
Inspection Summary Inspection on June 4 through 27, and July 8,1980 (Report No. 50-266/80-10; 50-301/80-10)
Areas Inspected: Routine, unannounced inspection conducted by resident inspectors during the period June 4 through June 27, and July 8, 1980, of Operational Safety Verification, Licensee Event Report Followup, IE Bulletin Followup, and IE Circular Followup. The inspection involved 180 inspector-hours onsite by two NRC inspectors. An Enforcement Conference was held on July 8, 1980, to discuss the recent increase in personnel errors.
The meeting involved 12 manhours by 4 NRC representatives.
800921900/5
.
. - -....
-
-.. -
..
.
_
-_
-_ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ ___.
Results: Of the four areas inspected, no items of noncompliance were
<
identified in two areas. Two items of noncompliance were identified in one area (Infraction-RHR pumps operability impaired-Par. 3d, Infraction-ESF buses crossconnected - Par. 3a). One item of noncompliance was identified in one area (Infraction-Uncontrolled vital area access - Par 2a).
j l
,. + -
,
, - = -
.s
.,,%-4
-
....,
s