IR 05000266/1980008
| ML19310A708 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/10/1980 |
| From: | Finley A, Hind J, Patterson J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19310A702 | List: |
| References | |
| 50-266-80-08, 50-266-80-8, 50-301-80-07, 50-301-80-7, NUDOCS 8006230043 | |
| Download: ML19310A708 (1) | |
Text
{{#Wiki_filter:, U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT REGIGN III Report No. 50-266/80-08; 50-301/80-07 Docket No. 50-266; 50-301 License No. DPR-24' DPR-27 Safeguards Group IV Licensee: Wisconsin Electric Power Company 231 West Michigan Avenue Milwaukee, WI 53201 Facility Name: Point Beach Nuclear Plant, Units 1 and 2 Inspection At: Point Beach Site, Two Rivers, WI Inspection Conducted: May 19-23, 1980 Date of Last Material Control and Accounting Inspection: April 24-28, 1978 Inspectors: ,M 6 d[[6 < fA'G.Finle'y Date ~ Auditor <b Nr
$ [ Chemist P. Patterson Date Approved By:
6 . [/.A. Hind, Chief 'Date iXafeguards Branch Inspection Summary Areas Inspected: Material Control and Accountability including facility organization and operation; measurement and control; storage and internal controls; shipping and receiving; records and reports; inventory and in-ventory verification; and management of material control system. The in-spection involved 60 inspection-hours onsite by 2 NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the 7 areas examined during the inspection.
(Details Part 2.790(d) Information) ' sooenso0 C q . }}