| ML19312D533 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/03/1980 |
| From: | Davis A, Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein N WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19312D534 | List: |
| References | |
| NUDOCS 8003240571 | |
| Download: ML19312D533 (2) | |
Text
__
-_
TIC f
N'o,,
=4-UNITED STATES
!"
NUCLEAR REGULATORY COMMISSION
^
o
$
s E REGION lil
's
[
799 ROOSEVELT ROAD
%
/
GLEN ELLYN. ILLINOIS 60137 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burnstein Executive Vice President Power Plants 231 West Michigan Avenue Milwaukee, WI 53201 Gentlemen:
Thank you for your letter dated February 11, 1980, informing us of the steps you have taken, or plan to take, to correct the noncompliance identi-fied in our letter dated January 11, 1980. We will examine your corrective action during a subsequent inspection.
Based on a review of our records, we have determined that the item of noncompliance in Appendix A to our January 11, 1980 letter (Inspection Report No. 50-266/79-18 and No. 50-301/79-19) should have been classified as a deficiency rather than an infraction. Hence, we are enclosing a revised Appendix A to our January 11, 1980 letter for your records. We informed Mr. J. Greenwood of your staff of this change by telephone on February 5, 1980.
Your cooperation with us is appreciated.
Sincerely, I s
[
.t
A. B. Davis, Chief Fuel Facility and Materials Safety Branch Enclosure: As stated cc w/ encl:
Mr. G. A. Reed, Plant Manager C. W. Fay, Director Nuclear Power Department cc w/ enc 1 & w/Itr dtd 2/11/80:
Central Files TIC l
Reproduction Unit NRC 20b Sandra A. Bast, Lakeshore PDR-Citizens for Safe Energy Local PDR Mr. John J. Duffy, Chief NSIC Boiler Inspector, Dept. of Industry, Labor and Human Relations
-
80032 40p