Forwards IE Insp Repts 50-266/79-06 & 50-301/79-07 on 790503-04.No Noncompliance Noted
ML19256B500
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/01/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19256B501 List:
References
NUDOCS 7907240144
Download: ML19256B500 (2)


Text

  1. 4 c3

,

IF,Gid '.

/ p* * tog [%

UNITEo STATES NUCLEAR REGULATORY COMMISSION

,

y j 4(l Q REGION m

,,

E E k,/2,.,U [. [

799 ROO5tvcLT RO AD

.

t, cLch cLLvw, stuNOis so 27

%w p

    • "*

JUN 1 199 Docket No. 50-266 Docket No. 50-301

-

Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

This refers to the inspection conducted by Messrs. D. C. Boyd and L. A. Reyes of this office on May 3 and 4, 1979, of activities at Point Beach Nuclear Plant, Units 1 and 2, authorized by Licenses No.

DPR-24 and No. DPR-27, and to the discussion of our findings with L'. Greenwood at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection.

Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors believe to be proprietary, you must apply in writing to this office, within twenty days of your receipt of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and should be prepared so that proprietary information identified in the application is contained in an enclosure to the application.

/W 7907249.

.

Wisconsin Electric Power 2-dl$ 1 1373

-

Company We will gladly discuss any questionc you have concerning this inspection.

.

Sincerely,

. F. Heishman, Chief Reactor Operations and Nuclear Support Branch

Enclosure:

IE Inspection Rpts No. 50-266/79-06 and No. 50-301/79-07

REGION III==

Report No. 50-266 '9-06; 50-301/79-07 Docket No. 50-266; 50-301 License No. DPR-24; DPR-27

-

Licensee: Wisconsin Electric Power Company 231 West Michigan Milwaukee, WI 53203 Facility Name:

Point Beach 'O : lear Plant - Units 1 and 2 Inspection At:

Point Beach Nuclear Plant, Two Creeks, Wisconsin Inspection Conducted: May 3 and 4, 1979

. - >

o

'

Inspectors:

.

yd S.ZV-79

/r//

A />

j

'E.

A. Rey I I,/ dV f

.

,

f

/)< >fh S l

8.l2 9 / D Approved By:

R. L. Spedard, Chief

/

Reactor Projects Section 1 Inspection Summary Inspection on May 3 and 4,1979 (Report No. 50-P'!79-06; 50-301/79-07)

Areas Inspected: This special announced inspe. 4on was conducted to observe specific plant conditions; to verify licensee actions in response to IE Bulletins No. 79-06, No.79-06A, and No.79-06A, Revision 1; to verify the operator awareness regarding the detailr.

of the Three Mile Island event, and the operator awareness of any procedural changes resulting from the above identified IE Bullet.as.

This inspection involved 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> of onsite inspection by two FAC inspectors.

Results: No items of noncompliance were identified.