Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-266/79-13 & 50-301/79-15
ML19256F144
Person / Time
Site: Point Beach  
Issue date: 11/08/1979
From: Heishman R, Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19256F145 List:
References
TAC-12663, TAC-12664, NUDOCS 7911210537
Download: ML19256F144 (2)


Text

'o, UNITED STATES M

E'

g NUCLEAR REGULATORY COMMISSION

.

3 y,

e REGION lli o,

f 799 ROOSEVELT ROAD

%

g-j cLEN ELLYN. ILLINOIS 6c137 a

NC;' 8 1973

.

Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

Thank you for your letter dated October 16, 1979, informing us of the steps you have taken to correct the noncompliance identified in our letter dated September 26, 1979.

Although your letter presents reasons why the control rods should not have been referred to as inoperable, the fact remains that Point Beach Technical

.

Specification 15.3.10 states in paragraph C.1:

"A control rod shall be

.

considered inoperable if the following occurs:

b.

The rod does not step in properly.

It shall be assumed inoperable until it has been tested to verify that it does drop." During the instance in question, the control rods could not be stepped in or out and the rods were not dropped.

While your letter indicates that you will file an application for an t. mend-ment to Technical Specification 15.3.10, it should be understood that until the amendment request is submitted and approved, or relief is granted by 13//

?67 Ton e1093 M

.

.

Wisconsin Electric Power-2-NC7 6 1375 Company

.

.

NRR, we must continue to inspect to the existing Technical Specification requirements. We will examine this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch cc:

Mr. G. A. Reed, Manager Mr. C. W. Fay, Director, Nuclear Power Department cc w/1tr dtd 10/16/79:

Central Files Reproduction Unit NRC 20b PDR Local PDR

-

'

NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy 13//

168

'bbih RIII RIII RIII g

h/bk Warn ek Hei an

'[7 11/6/79 b

/