IR 05000261/2018413

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000261/2018413 - (OUO Removed)
ML18221A233
Person / Time
Site: Robinson 
Issue date: 08/06/2018
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Kapopoulos E
Duke Energy Progress
References
IR 2018413
Download: ML18221A233 (4)


Text

August 6, 2018

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - U.S. NUCLEAR

REGULATORY COMMISSION SECURITY TARGET SET INSPECTION

REPORT 05000261/2018413

Dear Mr. Kapopoulos:

On July 11, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your H. B. Robinson Steam Electric Plant, Unit 2 and the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding..

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-261 License No. DPR-23

Enclosure:

Inspection Report 05000261/2018413 w/Attachment: Supplementary Information

cc: See Page 3 cc:

Edward T. ONeil, General Manager Nuclear Protective Services Duke Energy Corporation 526 South Church Street, Phase II, EC5ZD Charlotte, NC 28202 SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - U.S. NUCLEAR

REGULATORY COMMISSION SECURITY TARGET SET INSPECTION

REPORT 05000261/2018413

Distribution:

R. Musser, RII S. Shaeffer, RII L. Pressley, RII, DRP SPE R. Taylor, RII, DRP, SPE E. Wharton, NSIR N. Simonian, NSIR C. Johnson, NSIR B. Garner, NSIR D. Ditton, NMSS P. Habighorst, NMSS R. Musser, RII, DRP J. Rotton, RII, DRP, SRI A. Beasten, RII, DRP, RI

PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS:

Yes ACCESSION NUMBER:_________________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS

SIGNATURE DWS5 ETC1 SMS

NAME STRICKLAND COFFMAN SHAEFFER

DATE 8/1/2018 8/1/2018 8/6/2018

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

S:\\DRS NEW\\ENG BRANCH 2\\TS INSPECTION INFO\\ROBINSON\\2018\\ROBINSON FINAL INSPECTION REPORT (OUO REMOVED).DOCX