IR 05000250/1985040
| ML20136J250 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/06/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8601130293 | |
| Download: ML20136J250 (2) | |
Text
r-JAN 6 1996
%
.~
- _.
Florida Power and Light Company
~ #N: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT: CONFIRMATION OF MEETING APRANGEMENTS - TURKEY POINT DOCKET NOS. 50-250 AND 50-251 This confirms the conversation between Mr. D. A. Chaney, of your staff, and Mr. S. A. Elrod, of my staff, on Decemher 10, 1985, concerning an enforcement conference to be held at the Region II Office at 1:00 p.m., on January 8,1986.
We requested this meeting to discuss the Turkey Point Units 3 and 4 Gamma-Metrics Neutron Detector installation and the Unresolved Items in Inspection Report No. 50-250,251/85-40.
,
Should you _have any questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, Original signed by J. A. Olshinski J. Nelson Grace Regional Administrator Enclosure:
Proposed Meeting Agenda cc w/ encl:
pr. W. Dickey, Vice President Nuclear Operations g M. Wethy, Vice President Turkey Point Nuclear Plant g. J. Baker, Plant Manager Turkey Point Nuclear Plant A. J. Acosta, Plant QA
_
Superintendent wr. Arias, Jr., Regulatory and Compliance Supervisor bec w/ encl:
WRC Resident Inspector Document Control Desk State of Florida RII RI RI'
RII RII RI enther:,id S 1 rod VBrownlee rwa ker Gien ns AGibson 17/5/8)f if/3/86
5
/p/85 If/J /8(p 12/f/85 RII - /
RII JPj/f
\\
a tohr JA ishinski 8601130293 e60
PDR ADOCK O
)
'
pg
\\
ZEg
,
v.
~
-
-
.
i<
h JAN 6 1998
.
ENCLOSURE
.
,
.,
k Proposed Meeting Aaenda FLORIDA' POWER AND LIGHT CCHPANY MEETING WITH NRC
,
January.8, 1986, 1:00 p.m.
I.. Introduction J. Nelson Grace II.-- Unresolved Items Addressed in Turkey Point FPL Report No.'50-250,251/85-40 o
'
' III-Installation and Reporting.of the Gamma-Metrics FPL
.
Environmentally Qualified Neutron Detectors IV. Management Discussions a.- Plans for Mcdification of Main Steam.
FPL Isolation-Valves b. ~ Plans for Modification of Accumulator FPL'
Fill Lines-V.
Closing Remarks Roger D. Walker.
b;
'I
-%
-_
,