IR 05000250/1985014
| ML20117M497 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/13/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Williams J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20117M498 | List: |
| References | |
| NUDOCS 8505170108 | |
| Download: ML20117M497 (2) | |
Text
E
-
..'
,,
l MAY t 31985 i
'
. Florida Power and Light Company ATTN: L Mr. J. W. ' Williams, Jr.
.
l'
Group Vice President-l Nuclear Energy Department-P. O.-Box 14000-L Juno Beach, FL= 33408 i
Gentlemen:
SUBJECT: REPORT NOS. 50-250/85-14 AND 50-251/85-14 L
On April 22 - 26,1985, NRC inspected activities authorized by NRC Operating l
License Nos. DPR-31 and DPR-41 for your Turkey Point facility. At the conclusion L
of the inspection, the findings were discussed with those members of your staff L
identified in the enclosed inspection report.
l L
Areas examined during the inspection are identified in the report. Within these
'
areas, the inspection consisted of selective. examinations of procedures and
- '
representative records, interviews with personnel, and observation of activities in progress.
f_
l
. Within the scope of the inspection, no violations or deviations 'were identified.
l In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and l.
security measures are exempt from public disclosure; therefore, the enclosures to j-this letter, with the exception of the report cover page which presents a l: -
nonexempt summary, will not be placed in NRC's Public Document Room.
-
Should you have any questions concerning this letter, please contact us.
Sincerely, L.
'
'
!
850517 e
Virgil L. Brownlee, Chief l-PDft
50 Reactor Projects Branch 2.
G Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-250/85-14
'
and 50-251/85-14 (SafeguardsInformation)
n
REGION il -
,
g j
101 MARIETTA STREET, N.W.
- ATLANTA, GEORGI A 30323
%g....
MAY i 31985 Report Nos. 50-250/85-14 and 50-251/85-14 Licensee:
Florida Power and Light Company 9250 West Flager Street Miami, FL 33102 Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Facility Name:
Turkey Point 3 and 4 Inspection Conducted:
April 22-26, 1985 Inspector C
/d J Y
.a Jerry 0.' E 1, Physical Security Inspector Date Signed Approved by
._
.
N[8I
-
'D. R. McGuire, Chief, Physical Security Section D' ate Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection involved 35 inspector hours onsite inspecting:
Management Effectiveness Security Program; Security Program Audit; Testing and Maintenance; Locks, Keys, and Combinations; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel and Vehicles; Detection Aids-Protected Area; Communications; and Personnel Training and Qualifications-General Requirements.
Results:
No violations were identified.
<
,
SAFEGifARDS INFORMATION
,,g,,,,,,,,,,,,,
, UPON SEPARATION THIS PAGE IS DtCONTROLLED.
L