Forwards Insp Repts 50-250/85-21 & 50-251/85-21 on 850522-24 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML20133A901
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/01/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Williams J
FLORIDA POWER & LIGHT CO.
Shared Package
ML20133A904 List:
References
EA-85-076, EA-85-76, NUDOCS 8508060011
Download: ML20133A901 (3)


See also: IR 05000250/1985021

Text

-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

,

lX D

SAFEGUARDS INFORMATION'

4G 0 I 1985

Docket Nos. 50-250 and 50-251

License Nos. DPR-31 and DPR-41

EA 85-76

Florida Power and Light Company

ATTN: Mr. J. W. Williams, Jr.

Group Vice President

Nuclear Energy Department

P. O. Box 14000

Juno Beach, FL 33408

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(INSPECTIONREPORTNOS. 50-250/85-21AND50-251/85-21)

This refers to the special inspection conducted on May 22-24, 1985, at the Turkey

Point Nuclear Plant to review the circumstances surrounding the failure to

implement approved compensatory measures in a timely manner in connection with a

planned outage of the security computer. This event, which resulted from

inadequate relaying of information between the Central Alarm Station operator

and security supervisors, was discovered by licensee security personnel. It is

noted that Unit 3 was in the refueling mode and Unit 4 was at 100 percent power

at the time. An Enforcement Conference to discuss this matter was held in the

Region II Office on June 4,1985.

In accordance with the " General Statement of Policy and Procedure for NRC

Enforcement Actions," 10 CFR Part 2, Appendix C (1955), the violation described

in the enclosed Notice has been classified as a Severity Level III violation.

Normally a civil penalty is considered for a Severity Level III violation.

However, after consultation with the Director, Office of Inspection and

Enforcement, I have decided that a civil penalty will not be proposed in this

case because of the unusually prompt and extensive corrective action taken and

your prior good performance in the area of concern.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your response,

you should document the specific actions taken and any additional actions you

plan to prevent recurrence. After reviewing your response to this Notice,

including your proposed corrective actions, the NRC will determine whether

further NRC enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguard:: activities and

security measures are exempt from public disclosure; therefore, the enclosures

to this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC's Public Document Room.

gae50eog y00 g % h50

em ENCLOSURE CoNTAINS

SAFEGOARDS INFORg@0N 8^r5cu^^o8 I"ro*"Atto"

upon saran 4non ruxs NI

eAar x:n:Comou.mo. J6 0y

t

,

O

,SAFEdu.usbo #NFORMATION'

Florida Power and Light Company 2

The responses directed by this letter and the enclosed Notice are not subject to

the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

J. Nelson Grace

Regional Administrator

Enclosures:

1. Notice of Violation

(SafeguardsInformation)

2. Inspection Report Nos. 50-250/85-21

and 50-251/85-21

(SafeguardsInformation)

cc w/encls:

C. M. Wethy, Vice President

Turkey Point Nuclear Plant

C. J. Baker, Plant Manager

R. J. Acosta, Plant QA Superintendent

bec w/encls:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of Florida

RII RII I RII RII RII

J s: h cGuire 8 rr r ge od VBr niee

6/l7/85 Jet /8/85 6/cl/85 6//4 /85 6/10/85 6/p/85

RI RI RII RII

kRWalker GJen'ns BJones J01sMinski

6/10/86 j/l /85 6/ /85 1/1 /85 ty ,

SAFCGUARDS INFORMATIONv q.

.

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ -

_ _ _ -

.

(J~Eo36

(AC3= N

Florida Power and Light Company -3- 4(f$ , j ,

Distribution w/o encls:

PDR

SECY

ACRS

CA

JMTaylor, IE

RVollmer, IE

JNGrace, RII*

JAAxelrad. IE

PRobinson, IE*

JLieberman, ELD *

VStello, DED/ROGR

RBurnett, NHSS

LCobb, IE '

FIngram PA

Enforcement Coordinators

RI, RII, RIII, RIV, RV

BHayes. O!

Stonnelly, OIA

JCrooks, AEOD

JParticw, IE

EJordan IE

IE:ES File .

IE:EA File

EDO Rdg File

DCS

  • with encis:

n!! RI RI!

RII$.

JPStohr Rh or GRJe ins L is hins ki

7/3l/85 7ff(/85 7/g/85 /h/85

Y.W %q

e /

/

IE:ES) %

PRobinson

RII %

JNGrace

ELD

JLieb rman

ES

JA elrad

IE:'Nf

RVd11mdr

I ,

JiyIor

j

7/ /85 7/g/85 7/g/85 7 /85 w 7/p/85 85

e

. . . . . . ... .

.

.

9 y;. ..

.*fN,

L'h

'

'

. ,;"

yn L .5 L:.. . . '*

L (