Text
.,
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-237/86003(DRSS); 50-249/86004(DRSS)
Docket Nos. 50-237; 50-249 Licensee:
Commonwealth Edison Company P.O. Box 767 Chicago, IL 60690 Facility Name:
Dresden Nuclear Station, Inspection At:
Dresden Nuclear Station Inspection Conducted:
February 11, 1986 111.0. () ~v<-J Inspector:
M..f. Oestmann Approved By:
M. C. Schumacher, Chief Radiological Effluents and Chemistry Section Inspection Summary Licenses Units 2 and 3 No. DPR-19; DPR-25 ld:.:2~, 17f6 Date Inspection on February 11, 1986 (Reports No. 50-237/86003(DRSS);
50-249/86004(DRSS))
Areas Inspected:
Routine, unannounced inspection of radiological environmental monitoring program (REMP), including management controls, program implementation and results, review of annual REMP reports, and licensee internal audits and surveillance The inspection involved four inspector-hours onsite by one NRC inspecto Results:
No violations or deviations were identified.
,-..
,-,-
DETAILS Persons Contacted 1 D. Scott, Plant Superintendent, Dresden J. Schrage, Lead Health Physici.st, *Dresden R. Stobert, Senior QA Inspector, Dresden D. Adam, Engineer, Regulatory Assurance,.Dresden 1 R. Flessner, Services Superintendent, Dresde~
1 K. Deck, QA Auditor, Dresden 1S. McDonald, Rad-Chemistry Supervisor, Dresden 2 D. Kenealy, Environmental Health Physic.ist, Corporate Headquarters 1Attended ex.it interview on February 11, 198 Present during telephoneconversation on February 11, 198.
Management Controls and Organization Management controls and responsibilities for a1J the REMP at each nuclear
.station remain under the Emergency Planning Section of the Technical Services Nuclear.Dep~rtinent in the corporate offic Responsibilities include administration of the contract with Teledyne ls.otopes, Incorporated*, maintenance of the station's Offsite Dose Calculation Manual.s (ODCM)~ and oversight and.rev~~w of the monthly a~d annual Teports submitted by Teledyn The corporate *Quality Assurance
"Department is responsible for audit~ of th~ REMP;
-At the station, an envi.ronmental coordinator, presently a vacant.positi.on at the Dresden Station, is responsible to periOdically accompany the Teledyne sample collector to assure samples are collected-properly and to review the weekly sampl~ collettion data sheet The inspector'~ review of selected 1985 sheets indicate that such a_ review had been performed.*
The former coordinator ~ccompanied the inspector during a tour of the environs station No ~iolat1ons -0r:deviatfons were identifie.
Implementation of the Radiologi.cal Environmental MonitOring Program (REMP)
The inspector reviewed the REMP results presented in the 1984 Annual Operatirig Report (Part 3) dated March 5, 1985, errata dated Aprtl 24, 1985 and 1985 monthly reports to assure the sampling and analyses were
.co_r;iduct:ed.. :in accordance with T/S }abJe.4.8.1 ar:id th~ reporting
.
- ,. ' req4i rell)ents of ~fr. 6. A. C(2).. (A!Jli
- rndment 082,, for. Unit 2 :.and Amendment 75 for
":
.Uriit.. 3) w~re pr*ovided. _The :inspector. de.termineo".th~t>the. required information on results, land census data, and EPA interlaboratory comparisons were provide The insp~ct.or also *reviewed the nonroutine reporting'.leveTs ir(T*able.:5.0-lahd*'found*a-*number of discrepancies in footnote*e for Fe-59," I-131' and Cs-.137 repor*ting levels compared to t_hose 2 *
,..
'-:.
.~ * t
.in T/S.:Table 4:8-1* (footnote. 1-)~.*A li.censee representative agreed to issue an errata to the 1984 annual report which will be included in the 1985 Annual Operating Report due to be issued in April 1986 (Open Item*
50-237 /86003-01; 50-24.9/86004-01).
Review of the REMP indica~ed no anomalous results or unusual trend All samples were accounted-for and appropriate reasons given for missing samples.. Jn a letter dated August 22, 1985., the licensee wrote th.at an air sampler location 006 was changed to avoid further flood damag An e*lectric pole at 006 was destroyed in a flood in the spring of 1985.
resulting in no power to the 006 air sampler for six month The
.
inspector expressed concern of the excessively long time taken*to correct the_proble At present the sampler is operational at a new locatio The licensee also renumbered five TLD stations to be consistent with the licensee's TLD n_urnbering system for all station The licensee received a TIS Amendment to Section 3.8 and 4.8 for the*
Radiological Effluent Technical Specifi~ations (RETS) which went into effect on March 15, 198 This involves change~ to the reporting levels for radioactivity concentrations and reporting requirements in T/S for the REM The inspector noted that Section 8.4 for the REMP in Revision 11 of the ODCM is consistent with the new.TI Inspectof's review of sele~ted wee~ly samp1e collection sheets. completed by the contra.ttor's sample collector showed that air samplers "were calibrated on a monthly schedule.using a rota flowineter; -necessary*
repai.rs made to equip1J1ent; samples collected at the required frequency; and no deficiencies were ~de~tifi~ The inspector accompanied the former environmental coordinator on a tour of.several onsite/near field and far field air sampling station Each air sampler was fo~nd o~e~ab)e and ~alibrated. The inspe~tor noted that certain TLD's such as *at the Station D-10 were partially shielded* by the
~et~l angle iron bra~ket of the met~l cabinet housin~*the air sampler The :inspector expressed her concefn to licensee representatives who agreed to an*alternate mount~ng of the TlD capsule.. No other problem~
were noted in the environs stations. *
NQ violations or deviations were identifie Licensee 1nternal Audits and Surveillance~
The inspector reviewed Audit Reports QAA-12-85-40, 01-as*-40, 04-85-40, 06-85-40, 20..:85-32 and 22-85-40 for an audit of Teledyne Isotopes, Inc.,
performed by the QA Department i.n October 198 The areas covered in the audit included management. controls and organization, procedural adherence, QA implementation, REMP sample analyses and results of ~ach station, oper_abil ity an~ calibration of laboratory and counting equipment,
.
traceability of radionuclide standards t_o the National Bureau of Standards, EPA certification for analyzing specific radionuclides, and verification
- , *'
- .
of perfor~ance of the ~EMP at each statio One open item pertaining to preparing a computer programming procedure wa~ identifie No problems were noted with this audi Surveillances QAS~l2-88-200 and QAS-12-85-19 cbncerned observation of the sample. co 11 ector toll ect i ng. air, milk and water samples in January and August 198 No problems were identifie N6 violations or *deviations were identifie.
Exit Interview
- ,
lhe inspector met with licensee representatives (Section 1) at the conclusion of the inspection on Februqry 11, 198 The scope an findings bf th~ inspection were discussed, including alternate.means of mounting the TLDs at the environs station *
During the inspection, the inspector discussed the likely informational content of the inspection report with regard to documents or processes revi~wed by the inspector during th~ inspectio Li~enSee representatives did not identify any such dotuments/processes as proprietary.
. '
,,*"..
.. '
' '