IR 05000220/1979007
| ML17053A826 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/16/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider R NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053A823 | List: |
| References | |
| NUDOCS 7907230044 | |
| Download: ML17053A826 (4) | |
Text
6P,R RE0y~
~C
~p p
~O
++*++
Docket No. 50-220 UNITED STATES NUCLEAR REGULATORY COMMISSION REGIDN I 631 PARK AVENUE Q'ING OF PRUSSIA, PENNSYLVANIA 19406 HAYi 8 1979 Niagara Mohawk Power Corporation ATTN:
Mr.
R.
R. Schneider Vice President Electric Operations 300 Erie Boulevard West Syracuse,,
New York 13202 Gentlemen:
Subject:
Inspection 50-220/79-07 This refers to the inspection conducted by Mr. L. H. Thonus of this office on March 13-16, 1979 at Nine Mile Point Nuclear Station, Unit 2, Scriba, New York of activities authorized by NRC License No.
DPR63 and to the discussions of our findings held by Mr. Thonus with Messrs T.
Lempges, T. Perkins, and other members of your staff at the conclusion of the inspection, and to a subsequent telephone discussion between Mr.
R.
L. Nimitz of my staff and Mr. E.Leach of your staff on March 22, 1979.
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of procedures and representative.
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix
'.
This item of noncompliance has been categorized into the levels as described in our correspondence to you dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20)
days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2) cori ective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compli-ance will be achieved.
). gcrgg7g~
0 p~ xi$ Q p,'"
e
Niagara Mohawk Power Corporation
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document, Room. If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
Any such application must be accompanied by an affidavit exe'cuted by the owner of the information, which identifies the document or part sought to be withheld, and which contains.
a statement of reasons which addi. esses with specificity the items which will be considered by
.the Commission as listed in subparagraph (b) (4) of Section 2.790.
The
~
information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document, Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, George H. Smith, Chief Fuel Facility and Materi s Safety Branch Enclosures:
l.
Appendix A, Notice of Violation 2.
Office of Inspection and Enforcement Inspection Report Number 50-220/79-07 cc w/encls:
T. E.
Lempges, General Superintendent, Nuclear Generation T. J. Perkins, Station Superintendent C. L. Stuart, Operations Supervisor E.
B. Thomas, Jr., Esquire A. Z. Roisman, Natural Resources Defense Council (Without Report)
'I