IR 05000220/1979005
| ML19241C156 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/05/1979 |
| From: | Bailey R, Devlin J, Thonus L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19241C154 | List: |
| References | |
| 50-220-79-05, 50-220-79-5, NUDOCS 7907270386 | |
| Download: ML19241C156 (1) | |
Text
'
U.S. NUCLEAR RE LAT0F.Y CamlSSICfl
-
0FFICE OF IllSPECTION AND ENFORCEMENT Regien I Report No.
50-220/79-05 Docket No.
50-220 Safeguards Group
License No.
DPR-63 Priority
--
Category C
-
Licensee:
Niacara Mohawk Power Corporation 300 Erie Boulevard, West Syracuse, New York 13203 F&cility Name:
Rne Mile Point Nuclear Station, Unit 1 Inspection at:
Scriba, New York Inspection conduc+<.
Februa '
7-
, 1979 fj(/hf by
,
3 e f,f Inspectors:
R. J. Bailey @ffysical Secfrity Inspector
/da te's i g'ned b
&llz 5'l7 9 mw L. Thonus, Radiation Srecialist
-
date signed
-
date sianed
/
/
Approved by A/
/b/
/M d
//JC W. Devlin, Chief, Security and
/ da,te sifgned Investigation Section, Safeguards Branch Insoection Summary:
Special Inspection cn February 7-10, 1979, as a result of unrestricted access to site on Feb, van 6, 1979.
(Report No. 50-220/79-05)
'\\reas Inspected:
Special announced inspection by a regional based inspector of the licensee's physical Security Program relative to physical bar iers, access requirements, response and records.
The special inspection invol'ed 30 inspector-hours onsite by one NRC regional based inspector.
Results:
Six itens of noncompliance were identified in the four areas inspected; access requirements (Paragraph Sa 79-05-01), physical barriers (Paragraph 58 79-05-02/03) a.id response / records (Paragraph SC 79-05-04/05/06).
.
no 4..:
J V l.
s
/J