IR 05000054/1989004

From kanterella
Jump to navigation Jump to search
Insp Repts 50-054/89-04 & 70-0687/89-04 on 890829-30.No Violations Noted.Major Areas Inspected:Physical Protection Measures for SNM of Moderate Strategic Significance
ML20248H011
Person / Time
Site: 05000054, 07000687
Issue date: 09/26/1989
From: Cameron D, Della Ratta A, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20248G983 List:
References
50-054-89-04, 50-54-89-4, 70-0687-89-04, 70-687-89-4, NUDOCS 8910110143
Download: ML20248H011 (2)


Text

.. -

.. l x..:. j

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

50-54/89-04 Report No /89;0_4 50-54 Docket No R-81 License Nos. SNM-639 Safeguards Group II Licensee: Cintichem, In P.O. Box 324 Tuxedo, New York 10987 Facility Name: Sterling Forest Research Center

_

Inspection At: Tuxedo, New York Inspection Conducted: August 29, and 30, 1989

]

Type of Inspection: Routine, Unannounced Physical Security Inspectors: /d [ 9- J4 -#

A. Della RattabSafeguards Auditor date k $ rAb$~

D.~ Cameron, Rea6 tor Effiineer-Physical Security 9-Ad &f date v

'

Approved by: '.

-

/ f-24-[9 R. R. Ke'imigdhi ,' Safeguards Section date ,

Division of Rad a ion Safety and Safeguards l Inspection Summary: Routine, Unannounced Inspection on August 29 and 30, 1989 (Combined Report Nos. 50-54/89-04 and 70-687/89-04)

Areas Inspected: Physical protection measures for special nuclear material of moderate strategic significanc Results: The licensee was in compliance with NRC requirements in the areas inspecte PDR ADOCK 03000054 g PDC

_ _ _ _ _

'

V ,

,,

~

I . .-

.'J.,.

.

.' ..

DETAILS

- Key Persons' Contacte *J. McGovern, Plant Manager T. Vaughn, Manager, Health, Safety.and Environmental Affairs

  • W. Ruzicka,. Manager of Nuclear Operations J. Kratochwil, Supervisor, Site Utilities M. Johnson, Reactor. Supervisor l P. Weber, Senior. Reactor Operator-S. Franklin, Reactor Operator

.

R. Voss, Maintenance Utility Technician

..

E. Kobylarz,: Senior Utility Technician The inspector also interviewed other' licensee employees ' associated with plant operations,' and physical securit *present.at exit interview General Physical Security Requirements for SNM of Moderate Strategic Significance The licensee's program for the physical protection of special nuclear material of moderate strategic significance was reviewed by.the inspectors for conformance to the NRC-approved physical. security. plan. The inspectors examined physical barriers, access controls, procedures, and-key control, and observed a licensee test of alarm system features. The inspectors found that the licensee's program and its implementation met the general performance requirements and objectives of the governing regulation . Exit Interview The inspectors met with the licensee representatives indicated in paragraph I at the conclusion of the inspection on August 30, 1989 and

'

summarized the scope and findings of the inspectio At no time during this inspection was written material provided to the licensee by the inspector I i

i I

l i

- - _ _ - _ - - - - _ _ _ _ _ - .----_