IE Insp Repts 50-010/79-10,50-237/79-10 & 50-249/79-08 on 790316-20.No Noncompliance Noted.Major Areas Inspected: Maint Activities,Plant Operations & Physical Protection & Security Organization
ML19270H184
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/25/1979
From: Reyes L, Spessard R, Melanie Wong
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19270H179 List:
References
50-010-79-10, 50-10-79-10, 50-237-79-10, NUDOCS 7906250153
Download: ML19270H184 (9)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REC 105 III Report No. 50-10/79-10; 50-237/79-10; 50-249/79-08 Docket No. 50-10, 50-237, 50-249 License No. OPR-02, DPR-19, DPR-25 Licensee:

Commonwealth Edison Company P. O.

Box 767 Chicago, IL 60690 Facility Name:

Dresden Nuclear Power Station, Units 1, 2 and 3 Inspection At:

Dresden Nuclear Power Station, Morris, IL Inspection Conducted: March 16-20, 1979-l l

Inspectors:

8. L. 5 de'r' h'

~

Y/J-r/I

,

/

.

J V [' / '/

R

.-jx, i. i n

!

..

D.

BJyd

-

2/

my:-

,',,

..,

/ E. T. Chow ';

V,

'/

<.','/:

'

t,,

,.:

.-

y A. Revey L.

[1,

/4,/

d A,;

t

,,,,

Others:

B. M. K. k'ong (dC Intern)

T/ ' N #

'

,>

.-

,

ll

'\\

  • m

- f /31 L

^l/. - v f'.

Approved By:

R. L. Spestard, Chief e

Reactor Projects Section 1 Inspection Summary Inspection on March 16-30, 1979 (Report No. 50-10/79-10; 50-237/79-10:

50-249/79-08)

Areas Inspected:

Routine, announced resident inspection of maintenance activities, plant operations, physical protection-security organization, physical protection-physical barriers, physical protection-access control (identification, authorization, badging, search, and escorting),

physical protection - communications, surveillance of core power dis-tribution limits, radioactive waste systems - operations, calibration of safety related components required by Technical Specifications, 2237 274 7906250/63

.

radiation protection - operations, thermal power evaluations, and review of t' nit 3, Cycle 6, Summary Startup Test Report.

The inspection involved 112 inspector-hours onsite by four NRC inspectors and one NRC intern.

Results: No items of noncompliance or deviations were identified.

2237 275

- 2-

.

.

DETAILS 1.

Persons Contacted

  • B.

Stephenson, Station Superintendent A. Roberts, Assistant Superintendent

  • B.

Shelton, Assistant to Station Superintendenc

  • R.

Ragan, Lead Operating Engineer D. Farrar, Technical Staff Supervisor E. Budzichowski, Unit 1 Operating Engineer J. Wujciga, Unit 2 Operating Engineer C.

Sargent, Unit 3 Operating Engineer 3. Sanders, Station Security Administrator

  • R.

Stobert, QA The inspector also talked with and interviewed several other licensee employees, including members of the technical and engineering staffs, reactor and auxiliary operators, shift engineers and foremen, electrical, mechanical and instrurent maintenance personnel, and contract security personnel.

  • Denotes those attending one or more exit interviews conducted on March 23 and 30, 1979.

2.

Maintenance The inspector, through direct observations and record review, verified that instrumentation, reactor coolant system, emergency core cooling systems, containment systems, and plant and electrical power systems maintenance activities were conducted in accordance with established procedures and Technical Specifications; verified that required administrative approvals were obtained prior to initiating work; verified that maintenance activities were accomplished using approved and technically adequate pro-cedures; verified that the activities were inspected in accordance with the provisions of licensee's requirements; verified that the activities included functional testing and calibration as necessary prior to returning the component or system to an operating status; verified that quality control records were available; verified that activities were accomplished by qualified personnel; verified that radiological controls were established for worker protection, including minimizing personnel exposure; verified that materials or components used were certified as required by plant procedures; verified that QC hold points, plant status and safety controls, and tagging operations appeared adequate; and verified that associated limiting conditions for operation were met in accordance with Technical Specifications.

2237 276

_ 3-

.

The inspector observed maintenance in progress concerning the f ollowing Work Requests:

(1) Unit 2, WR 2237, Rebuild Safety Valve and WR 3922,

"A" LPCI Heat Exchanger, and (2) Unit 3 WR 1382, "A" LPCI Heat Exchanger and WR 2243, HPCI Room Cooler.

The inspector reviewed the following completed work packages:

(1) Unit 2, WR 1687, Adjust Latch Microswitch on Grapple and (2) Unit 3, WR's 1185,1186, and 1189, "B" MSIV Repair.

No items of noncompliance or deviations were identified.

3.

Plant Operations The inspector reviewed the plant operations including examinations of control room log books, routine patrol sheets, shift engineer log book, equipment outage logs, special operating orders, and jumper and tagout logs for the month of March 1979.

The inspector also made visual observations of the routine surveillance and functional tests in progress during the period.

This review was conducted to verify that facility operations were in conformance with the requirements established under Technical Specifications, 10 CFR, and Administrative Procedures. A review of the licensee's deviation reports for the period was conducted to verify that no violations of the licensee's Technical Specifications were made.

The inspector conducted a tour of Units 1, 2, and 3 reactor buildings and turbine buildings throughout the period and noted that the monitoring instrumentation was recorded as required, radiation controls were properly established, fluid leaks and pipe vibrations were minimal, seismic restraint oil levels appeared adequate, equipment caution and hold cards agreed with control room records, plant housekeeping conditions / cleanliness were adequate, and fire hazards were minimal.

The inspector observed shift turnovers to verify that plant and component status and problem areas were being turned over to relieving shift personnel.

The inspector observed sampling and chemical analysis of water chemistry samples to verify that water chemistry was being maintained in accordance with Technical Specifications.

No items of noncompliance or deviations were noted.

4.

Physical Protection - Security Organization The inspector verifed by observation and personnel interview (once during each operating shif t) that at least one full time member of the security organization who has the authority to direct the physical security activities of the security organization was onsite at all times; verified by observation that the security organization was properly manned for all shifts; and verified by

~'-

2237 277

,

&

.

.

observation that members of the security organization were capabic of performing their assigned tasks.

There were no weapons qualifications conducted during this monthly inspection.

No items of noncompliance or deviations were identified.

5.

Physical Protection - Physical Barriers The inspector verified that certain aspects of the physical barriers and isolation zones conformed to regulatory requirements and commitments in the physical security plan (PSP); that gates in the protected area were closed and locked if not attended; that doors in vital area barriers were closed and locked if not attended; and that isolation zones were free of visual obstruc-tions and objects that could aid an intruder in penetrating the protected area.

No items of noncompliance or deviations were identified.

6.

Physical Protection - Access Control (Identification, Authorization, Badging, Search, and Escorting)

The inspector verified that all persons and packages were identified and authorization checked prior to entry into the protected area (PA),

all vehicles were properly authorized prior to entry into a PA, all persons authorized in the PA were issued and displayed identification badges, records of access authorized conformed to the PSP, ana all personnel in vital areas were authorized access; verified that all persons, packages, and vehicles were searched in accordance to regu-latory requirements, the PSP, and security procedures; verified that persons authorized escorted access were accompanied by an escort when within a PA or vital area; verified that vehicles authorized escorted access were accompanied by an ascort when within the PA; and verified by review of the licensee's authorization document that the escort observed above was authorized to perform the escort function.

No items of noncompliance or deviations were identified.

7.

Physical Protection - Communications The inspector verified by observation (during each operating shif t)

that communications checks were conducted satisfactorily at the beginning of and at other prescribed time (s) during the security personnel work shif t and that all fixed and roving posts, and each member of the response team successfully communicate from their

- 5-2237 278

.

.

remote location; and verified that equipment was operated consistent with requirements in the PSP and security procedures.

No items of noncompliance or deviations were identified.

8.

Surveillance of Core Power Distribution Limits The inspector verified through examination of various P-1 print outs that linear heat generation rates (LHGR) were within Technical Specifications limits and that if core maximum peaking factors were above design value total peaking factors for that class of fuel, APRM setpoint adjustments would be made by the amount specified in Technical Specification; and verified by examination of the OD-6, " Thermal Data in a Specified Bundle," associated with its P-1 that minimum critical power ratio (MCPR) and average planar linear heat generation rate (APLHGR) were with Technical Specifications limits.

No items of noncompliance or deviations were noted.

9.

Radioactive Waste Systems - Operations The inspector verified through record review that all effluent releases which occurred during the month of March 1979, were properly documented, that timely approvals of the releases were obtained, and that required sampling had been accomplished.

He also observed the preparation for and release of liquid laundry waste on March 30, 1979, and verified that the release was accomplished in accordance with approved procedures.

No items of noncompliance or derIations were noted.

10.

Calibration of Safety-Related Components Required by Technical Specifications The inspector observed the calibration of the Main Steam Line High Radiation Scram Functions on Unit 2 and verified conformance with Technical Specifications and use of technically adequate procedures.

He also selected two instrument testing devices (Calibration Unit General Electric, DS-2, Serial No. 124202D and Fluke DVM, DW4, Serial No. 057790) used as a standard and verified that calibration frequency was met, that accuracy was verified as prescribed by internal procedures or specifications, that accuracy was traceable to National Bureau of Standards or other independent testing organizations, and that storage and control of the selected devices were in accordance with internal procedures or specifications.

No items of noncompliance or deviations were identified.

- 6-2237 279

.

.

11.

Radiation Protection - Operations The inspector examined all radiation protection instruments in use and verified their operability and currency of calibration.

The inspector verified SWP requirements were being followed by observing activities conducted under SWP's, and he verified that high radiation area posting and 10 CFR 19 posting requirements were met.

No items of noncompliance or deviations were identified.

12.

Thermal Power Evaluation The inspector reviewed the results of the licensee's core thermal power evaluation for Units 2 and 3 (Unit 1 did not operate during the first quarter of 1979) and verified the technical adequacy of the evaluations and results and the frequency of evaluations were as prescribed by the facility's Technical Specifications.

No items of noncompliance or deviations were identified.

13.

Review of Unit 3 Cycle 6 Summary Startup Test Report The inspector reviewed the questionable items in Dresden Unit 3 Summary Startup Test Report for Reload No. 5, Cycle 6, concerning the cracked holders of the seven operational neutron sources, the withdrawal time of Control Rod D-2, and the average deviation of the transversing in-core probe (TIP) measurements.

Based on the information that the licensee had provided, the inspector concluded that all three items were resolved satisfactorily.

No items of noncompliance or deviations were identified.

Exit Interview The inspector met with the licensee's representatives on March 23 and 30, 1979, (denoted in Paragraph 1) and summarized the scope and findings of that weeks inspection activities.

Attachment:

Preliminary Inspection Findings 2237 280-7-

OFFICE OF INSPECTION AND ENFORCEME

.

PRELIMINARY INSPECTION FINDINGS

.

1.

LICENSEE 2.

REGIONAL OFFICE Commonwealth Edison Company U.S. Nuclear Regulatory Commission Dresden Units 1, 2, 3 799 Roosevelt Rd.

Glen Ellyn, IL.

60137 Region III

_

3.

DOCKET NUMBERS 4.

LICENSE NUMBERS 5.

DATE OF INSPECTION 50-010, 50-237, 50-249 DPR-02, DPR-19, DPR-25 3 /f.

23/77

  • /.

Within *.he scope of the inspection, no items of noncompliance or deviation p

were found.

7.

The following natters are preliminary inspection findings:

2237 281 8.

These preliminary inspection findings will be reviewed by NRC Supervision /

Managdment at the Region III Office and they will correspond with you concerning any enforcement action.

bL

~

Nucle'ar Regulatory Commission Inspector

OFFICE OF INSPECTION AND ENFORCE T;

.

PRELIMINARY INSPECTION FINDINGS

.

1.

LICENSEE 2.

REGIONAL OFFICE Co=monwealth Edison Company U.S. Nuclear Regulatory Commission Dresden Units 1, 2, 3 799 Roosevelt Rd.

Glen Ellyn, IL.

60137 Region III 3.

DOCKET NUMBFRS 4.

LICENSE NUMBERS 5.

DATE OF INSPECTION 50-010, 50-237, 50-249 DPR-02, DPR-19, DPR-25 3 /y,

_,,, /.y r.

,

v 6.

k'ithin the scope of the inspection, no items of noncompliance or deviation were found.

7.

The following matters are preliminary inspection findings:

2237 282 8.

These preliminary inspection findings will be reviewed by NRC Supervision /

Managdment at the Region III Office and they will correspond with you concerning any enforcement action.

-

,

) b^N2. !--

Nuclear Regulatory Commission Inspector