Forwards IE Insp Repts 50-010/79-10,50-237/79-10 & 50-249/79-08 on 790316-30.No Noncompliance Noted
ML19270H177
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/25/1979
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19270H179 List:
References
NUDOCS 7906250147
Download: ML19270H177 (2)


See also: IR 05000010/1979010

Text

L

A

e mec ,

h'

gm

c

UNITED STATES

h

,. - (

NUCLEAR REGULATORY COMMISSION

j Ig;;. J g

REGION m

e

799 ROOSE VE LT ROAD

$

g

G LE N E LL Y N. IL LINoIS 60137

o....*'

APR 2 51979

Docket No. 50-10

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATT'i:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL

60690

Gentlemen:

This refers to the inspection conducted by Messrs. J. L. Barker,

D. C. Boyd, E. T. Chow, L. A. Reyes, and B. M. K. Wong, of this

office on March 16-30, 1979, of activities at Dresder Nuclear

Power Station, Units 1, 2, and 3, authorized by NRC Sperating

Licenses No. DPR-2, No. DPR-19 and No. DPR-25, and to the dis-

cussion of our findings with Mr. B. B.

Stephenson and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

2237 272

gg06250/Q

.

.

Commonwealth Ed: son

-2-

APR 2 5 G79

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

o

R. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inpsection

Report No. 50-10/79-10,

No. 50-237/79-10 and

No. 50-249/79-08

cc w/ enc 1:

Mr. B. B.

Stephenson, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Anthony Roisman, Esq.,

Attorney

Mr. Dean Hansell, Office of

Assistant Attorney General

2237

2713