IE Insp Rept 50-010/79-16 on 790830-31.No Noncompliance Noted.Major Areas Inspected:Specs & Procedures,Personnel Qualifications & Work Activities for HPCI Sys Additions
ML19250A830
Person / Time
Site: Dresden Constellation icon.png
Issue date: 09/13/1979
From: Danielson D, Key W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19250A829 List:
References
50-010-79-16, 50-10-79-16, NUDOCS 7910240668
Download: ML19250A830 (4)


Text

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-010/79-16 Docket No.50-010 License No. DPR-02 Licensee: Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name: Dresden, Unit 1 Inspection At: Merris, Illinois Inspection Conduct.gd: August 30-31, 1979 cd ///)7[

Inspectors:

y

~

4wCv/%

Approved by:

D. H. Danielson, Chief 9!/3!79 En;ineering Support Section 2

/

Inspection Summary Inspection on August 30-31, 1979 (Report No. 50-010/,79-16)

Areas Inspected: Review of specifications and procedures, review of personnel qualifications, and observations of work activities for the HPCI System additions. The inspection involved a total of 14 on site inspector-hours by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

)90f l)

7010240 d b 8

  • DETAILS Persons Contacted Commonwealth Edisot, Company (CECO)
  • B. B. Stephenson, Station Superintendent G. Redman, Project Engineer (Chemical Cleaning)

J. Harrison, Assistant Project Engineer D. Wheeler, Lead Field Engineer (Station Construction)

  • J. Peterson, Field Engineer (Station Construction)
  • E. Wilmere, Quality Assurance Coordinator
  • B. Kensinger, Quality Assurance Engineer S. Mankung, Quality Assurance Engineer Universal Power Piping Inc. (UPP)

S. Forbes, Assistant Quality Assurance Manager T. Anast, Quality Assurance Attendent Functional or Program Areas Inspected 1.

Specification and Procedure Review The following specifications and procedures for the HPCI addition were reviewed by the inspector:

Sargent & Lundy Specification, K-4014 Titled:

Primary Containment Penetrations Sargent & Lundy Specification, K-3110 Titled:

Piping System and Erection of Equipment HCPI System Additions Sargent & Lundy Specificatins, K-3120 Titled: Heating, Ventilation and Air Conditioning Work, HPCI Systems Addition UPP S.O. N-2916C-NDE 901, Revision 0 Titled: Leak Testing Q.A. 7.2, Revision 0 Titled:

Issuance and Control of Weld Materials Q.A. 8.6, Revision 1 Titled: Field Pressure Test 19o7 114-2-

.

'

Weld No. 867-17-5-W1 Pipe heat No. N93776 Line No. 1-61263-6" HPCI pumps S/N-G6101A, and G6101B are stored in place in the HPCI building. Both diesel generators are stored in place in the HPCI building.

Welding materials at UPP are being controlled in accordance with approved procedures. The inspector examined rod oven No. WRO-2 in the fab shop. The issue of welding materials was also examined.

No items of noncompliance or deviations were identified.

3.

Personnel Qualifications The inspector examined qualifications and certifications of the following personnel.

Welder Qualifications (UPP)

R. Wetzel, Stamp No. BM-1 M. Gustafson, Stamp No. BM-2 J. Hannessy, Stamp No. H-7 R. Thibodeaux, Stamp No. T-1 C. Vik, Stamp No. V-1 R. Cynowd, Stamp No. C-5 NDE Personnel Qualifications (PTL)

RT UT MT PT C. J. Rufo I

II II II J. R. Noyes II II R. P. Berkheimer II H. W. Stout II No items of noncompliance or deviations were identified.

E_xit Interview The inspector met with licensee representatives (denoted in the Persons Contacted Paragraph) at the conclusion of the inspection on August 31, 1979. The inspector summarized the scope and findings of the inspection.

l}f-4-

.

'

Q.A. 7.4, Revision 1 Titled: Cleaning and Flushing Q.A. 7.5, Revision 1 Titled:

Control of NDE Examination Reports Q.A. 8.1, Revision 0 Titled: Receiving Inspection Q.A. 9.1, Revision 0 Titled:

Issuance and Control of Test and Inspection Equipment Q.A. 10.3, Revision 1 Titled: Storage of Items and/or Materials NDE - 801, Revision 2 Titled: Visual Inspection C. G. 1, Revision 1 Titled:

Cutting of Sphere Penetrations W.P.S. - 425B, Revision 1 Titled: Gas Tungston-Arc and Shielded Metal-Arc Welding of Carbon Carbon Steel to Stainless Steel Groove Welds W.P.S. - 426B, Revision 1 Titled: Gas Tungston-Arc and Shielded Metal-Arc Welding of Stainless Steel to Carbon Steel and Socket Welds W.P.S. - 428, Revision 1 Titled: Shielded Metal-Arc Welding of Stainless Steel to Carbon Steel Fillet and Socket Welds W.P.S. - 411C, Revision 0 Titled: Gas Tungston-Arc Welding and/or Shielded Metal-Arc Welding of P-1 (Carbon Steel) Material (Class MC Welding)

No items of noncompliance or deviations were identified.

2.

Observation of Activities The inspector examined six (6) schedule 80 pipe sections installed through the containment at elevation 540' which were welded for electrical penetrations. Holes for the two (2) mechanical containment penetrations have not been cut.

The following pipe sections were being fabricated in the UPP fabrication shop:

1907 116-3-