DCL-03-007, Response to Request for Additional Information for Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Physical Security Program and Associated Revised Request for Exemption to Two 10 CFR 73.55 Requirements

From kanterella
(Redirected from DCL-03-007)
Jump to navigation Jump to search

Response to Request for Additional Information for Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Physical Security Program and Associated Revised Request for Exemption to Two 10 CFR 73.55 Requirements
ML030380350
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/31/2003
From: Oatley D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
+sispmjr200505, -RFPFR, DCL-03-007, TAC L23399
Download: ML030380350 (3)


Text

WE Pacific ElectricGas and Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach. CA 93424 January 31, 2003 900.545.6000 PG&E Letter No. DCL-03-007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-26 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Response to Request for Additional Information For Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Physical Security Program and Associated Revised Request for Exemption to Two 10 CFR 73.55 Requirements (TAC NO. L23399)

Dear Commissioners and Staff:

On April 18, 2002, Pacific Gas and Electric Company (PG&E) submitted to the Nuclear Regulatory Commission (NRC) proposed changes to the Diablo Canyon Power Plant (DCPP) Physical Security Program to incorporate the Diablo Canyon ISFSI. The submittal included an associated request for exemptions to four 10 CFR 73.55 requirements.

By letter dated December 6, 2002, the NRC staff requested additional information needed to continue their review of the proposed changes to the DCPP Physical Security Program.

Enclosure I contains PG&E's response to the request for additional information.

Enclosure 2 contains proposed changes to the DCPP Physical Security Plan, as amended by PG&E's response to the request for additional information.

Enclosure 2 also contains proposed changes to the Safeguards Contingency Plan, as amended by PG&E response to the request for additional information. These changes do not change any of the plant security requirements, and do not decrease the effectiveness of plant security.

Enclosures 1 and 2 contain Security Safeguards Information and must be handled accordingly.

SECURITY SAFEGUARDS INFORMATION

[When separated from Enclosures I and 2, handle this document as non-safeguards]

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway a Comanche Peak

  • Diabto Canyon
  • Palo Verde
  • South Texas Project 9 Wolf Creek

Document Control Desk PG&E Letter DCL-03-007 January 31, 2003 Page 2 contains the revised exemption request from 10 CFR 73.55 requirements. As a result of PG&E's response to the request for additional information, PG&E withdrew two of the four exemption requests submitted in PG&E Letter DCL-02-042, dated April 18, 2002. In accordance with 10 CFR 2.790(d),

PG&E requests that Enclosure 3 be withheld from public disclosure since it contains information related to DCPP security.

As noted in PG&E's response to the request for additional information, Enclosure 4 contains a table that summarizes the Diablo Canyon compliance with the requirements of 10 CFR 73.55(a) - (h).

All changes will be incorporated into the physical security, safeguards contingency, and security training and qualification plans following NRC approval of the Physical Security Plan changes. These changes will go into effect before movement of spent fuel out of the main DCPP Protected Area.

These proposed changes are submitted to the Document Control Desk, and a copy to the Region IVOffice.

The DCPP Physical Security Program with approved exemptions will meet all existing security requirements for the Diablo Canyon ISFSI and will be revised as required to meet future security requirements imposed by the NRC as part of the license.

Should you require further information or clarification, please contact Ron Todaro, Manager, Security Services, at (805) 545-4309.

Sincerely, David H. Oatley V=ce Presidentand GeneralManager- Diablo Canyon gwh/A0570731 Enclosures cc: Diablo Distribution cc/enc. James R. Hall Ellis W. Merschoff David L. Proulx Girija S. Shukla SECURITY SAFEGUARDS INFORMATION

[When separated from Enclosures I and 2, handle this document as non-safeguards]

A member of the STARS (Strategic Teaming and Resource Sharing) Attiance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

)) Docket No. 50-275 In the Matter of Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY ) No. DPR-80

)

Diablo Canyon Power Plant ) Docket No. 50-323 Units I and 2 ) Facility Operating License

) No. DPR-82 Docket No. 72-26 AFFIDAVIT David H. Oatley, of lawful age, first being duly sworn upon oath states that he is Vice President and General Manager - Diablo Canyon of Pacific Gas and Electric Company; that he has executed PG&E Letter DCL-03-007 (Response to Request for Additional Information For Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Physical Security Program and Associated Revised Request for Exemption to Two 10 CFR 73.55 Requirements) on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice Presidentand GeneralManager- Diablo Canyon Subscribed and sworn to before me this 31 st day of January 2003.

+/-JAA" kotary Public y2aaý SANDRA L RECTOR Comnmiasion # 1339380