Submittal of Diablo Canyon Independent Spent Fuel Storage Installation Reference Documents
ML030430463
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/07/2003
From: Womack L
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
+sispmjr200505, -RFPFR, DIL-03-001, TAC L23399
Download: ML030430463 (2)


Text

Pacific Gas and Electric Company Lawrence F. Womack Diablo Canyon Power Plant Vice President P0 Box 56 Nuclear Services Avila Beach, CA 93424 805 545 4600 February 7,2003 Fax 8055454234 PG&E Letter DIL-03-001 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Submittal of Diablo Canyon Independent Spent Fuel Storage Installation Reference Documents (TAC No. L23399)

Dear Commissioners and Staff:

By letter dated December 21, 2001, the Pacific Gas and Electric Company (PG&E) submitted an application to the U. S. Nuclear Regulatory Commission (NRC) for a 10 CFR 72 site-specific license to build and operate an independent spent fuel storage installation (ISFSI) at the Diablo Canyon Power Plant site. The application included a Safety Analysis Report, Environmental Report, and other required documents in accordance with 10 CFR 72.

By letter dated August 29, 2002, the NRC staff requested additional information needed to continue their review of the Diablo Canyon ISFSI License Application.

PG&E submitted its response to the NRC staff on October 15, 2002, in PG&E letter DIL-02-009.

As requested by Mr. J. R. Hall, two documents referenced in the Diablo Canyon ISFSI RAl response are listed in Enclosure I followed by the documents for use by the NRC staff in their review of the application. The fire protection evaluation of the HI-TRAC transportation route, which is attached to Enclosure 1, was incorrectly referenced in Probabilistic Risk Assessment (PRA) Calculation File No. PRA01-01, Revision 1. The date of the evaluation should have been March 6, 2002, rather than February 2002. PRAOI-01 has been revised to reflect the actual issue date for the requested evaluation and is attached to Enclosure 2.

If you have any questions regarding this matter, please contact Mr. Terence Grebel at (805) 545-6140.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway a Comanche Peak

  • Diablo Canyon e Palo Verde
  • South Texas Project a Wolf Creek 1>'

fS V

PG&E Letter DIL-03-001 Document Control Desk February 7, 2003 Page 2 Sincerely, Lawrence F. Womack Vice President, Nuclear Services pns3 Enclosures cc:

Diablo Distribution cclenc: