September 26, 2002 MEMORANDUM TO: Charles L. Miller, Deputy Director Licensing and Inspection Directorate Spent Fuel Project Office, NMSS FROM:

James R. Hall, Senior Project Manager /RA/

Licensing Section Spent Fuel Project Office, NMSS

SUBJECT:

SUMMARY

OF THE SEPTEMBER 19, 2002, MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE DIABLO CANYON INDEPENDENT SPENT FUEL STORAGE INSTALLATION (TAC NO. L23399)

On September 19, 2002, a public meeting was held between staff from the Nuclear Regulatory Commission (NRC), the Center for Nuclear Waste Regulatory Analyses (CNWRA), and Pacific Gas and Electric Company (PG&E) to discuss PG&Es December 21, 2001, application for a proposed Independent Spent Fuel Storage Installation (ISFSI) at the Diablo Canyon site. The meeting was held at the CNWRA offices in San Antonio, Texas. The CNWRA staff is assisting the NRC in its technical evaluation of PG&Es application.

The subject of the meeting was the NRCs August 29, 2002, Request for Additional Information (RAI), which provided PG&E with the information needed by the staff to complete its review of the application. Each of the questions in the RAI was discussed, with NRC and CNWRA staff providing clarifications, as requested by PG&E. Following the discussions, PG&E indicated that they had a better understanding of the staffs questions and would provide appropriate responses. For a few questions, (soil stability below and near the pad; materials evaluation of spent fuel cladding), the participants agreed to hold additional phone conferences or meetings as needed to resolve any outstanding issues. PG&E plans to respond to the NRC staffs RAI by October 15, 2002, in accordance with the schedule established in NRCs letter dated May 9, 2002.

The meeting attendance list is attached. This meeting was noticed on September 4, 2002. No proprietary information was disseminated or presented at this meeting. No regulatory decisions were requested nor made.

Docket No. 72-26 TAC NO. L23399

Attachment:

Attendance List cc: Service List

MEMORANDUM TO: Charles L. Miller, Deputy Director September 26, 2002 Licensing and Inspection Directorate Spent Fuel Project Office, NMSS FROM:

James R. Hall, Senior Project Manager Licensing Section Spent Fuel Project Office, NMSS

SUBJECT:

SUMMARY

OF THE SEPTEMBER 19, 2002, MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND PACIFIC GAS AND ELECTRIC COMPANY REGARDING THE DIABLO CANYON INDEPENDENT SPENT FUEL STORAGE INSTALLATION (TAC NO. L23399)

On September 19, 2002, a public meeting was held between staff from the Nuclear Regulatory Commission (NRC), the Center for Nuclear Waste Regulatory Analyses (CNWRA), and Pacific Gas and Electric Company (PG&E) to discuss PG&Es December 21, 2001, application for a proposed Independent Spent Fuel Storage Installation (ISFSI) at the Diablo Canyon site. The meeting was held at the CNWRA offices in San Antonio, Texas. The CNWRA staff is assisting the NRC in its technical evaluation of PG&Es application.

The subject of the meeting was the NRCs August 29, 2002, Request for Additional Information (RAI), which provided PG&E with the information needed by the staff to complete its review of the application. Each of the questions in the RAI was discussed, with NRC and CNWRA staff providing clarifications, as requested by PG&E. Following the discussions, PG&E indicated that they had a better understanding of the staffs questions and would provide appropriate responses. For a few questions, (soil stability below and near the pad; materials evaluation of spent fuel cladding), the participants agreed to hold additional phone conferences or meetings as needed to resolve any outstanding issues. PG&E plans to respond to the NRC staffs RAI by October 15, 2002, in accordance with the schedule established in NRCs letter dated May 9, 2002.

The meeting attendance list is attached. This meeting was noticed on September 4, 2002. No proprietary information was disseminated or presented at this meeting. No regulatory decisions were requested nor made.

Docket No. 72-26 TAC NO. L23399

Attachment:

Attendance List cc: Service List DISTRIBUTION:

Docket NRC File Center PUBLIC NMSS R/F SFPO R/F SGagner, OPA BSpitzburg, RIV VEverett, RIV NJensen, OGC MBlevins HLee CBrown CWithee JSolis EKeegan SBaggett JGuttmann JStamatakos, CNWRA C:\\ORPCheckout\\FileNET\\ML022680584.wpd ADAMS: ML022680584 OFC:

SFPO E

SFPO E

SFPO NAME:

JRHall EZiegler JDMonninger DATE:

9/25 /02 9/26/02 9/26 /02

OFFICIAL RECORD COPY

Meeting between the Nuclear Regulatory Commission, the Center for Nuclear Waste Regulatory Analyses, and Pacific Gas and Electric Company on the proposed Diablo Canyon Independent Spent Fuel Storage Installation San Antonio, Texas September 19, 2002 ATTENDANCE LIST Name Affiliation Terry Grebel PG&E Richard Klimczak PG&E Lloyd Cluff PG&E Rich Hagler PG&E Doug Spaulding Consultant to PG&E Brian Gutherman Holtec Randy Hall NRC/SFPO Henry Lee NRC/SFPO Asad Chowdhury CNWRA John Stamatakos CNWRA Goodluck Ofoegbu CNWRA Amitava Ghosh CNWRA Simon Hsiung CNWRA Biswajit Dasgupta CNWRA Doug Gute CNWRA Darrell Dunn CNWRA Chandrika Manepally CNWRA Blaine Russell CNWRA Oleg Povetko CNWRA Michael Smith CNWRA Dan Pomerening Southwest Research Institute Robert Sewell Consultant to CNWRA Chris Brown*

NRC/SFPO Carl Withee*

NRC/SFPO