ML031010338

From kanterella
Jump to navigation Jump to search

Supplemental Slope Stability Responses to Additional NRC Questions for Diablo Canyon Independent Spent Storage Installation Application
ML031010338
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/27/2003
From: Womack L
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
+sispmjr200505, -RFPFR, DIL-03-004, TAC L23399
Download: ML031010338 (3)


Text

Pacfic Gas and

& Hechric Company Lawrence F. Womack Diablo Canyon Power Plant Vice President PO. Box 56 Nuclear Services Avila Beach, CA 93424 805.545.4600 March 27, 2003 Fax: 805.545A234 PG&E Letter DIL-03-004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Sunrlemental Slooe Stability Resrponses to Additional NRC Questions for the Diablo Canyon independent Spent Fuel Storaae Installation A6plication (TAC No. L23399)

Dear Commissioners and Staff:

By letter dated December 21, 2001, the Pacific Gas and Electric Company (PG&E) submitted an application to the U. S. Nuclear Regulatory Commission (NRC) for a 10 CFR 72 site-specific license to build and operate an independent spent fuel storage installation (ISFSI) at the Diablo Canyon Power Plant site. The application included a Safety Analysis Report, Environmental Report, and other required documents in accordance with 10 CFR 72.

By letter dated August 29, 2002, the NRC staff requested additional information needed to continue their review of the Diablo Canyon ISFSI License Application.

PG&E submitted its response to the NRC staff by letter dated October 15, 2002 (PG&E Letter DIL-02-009). contains supplemental information to address additional NRC slope stability questions. Enclosure 2 contains a list of attachments followed by the attachments.

Members of the Diablo Canyon Independent Seismic Hazards Review Board advised PG&E for the Diablo Canyon ISFSI Project based on their subject areas of interest. Refer to PG&E Letter DIL-01.006, dated December 21, 2001, for the primary functions of the Review Board and the identification of original Review Board members.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caflaway

  • Comarche Peak
  • Diablo Canyon
  • Palo Verde
  • South TsProsect
  • Wolf Creek

Document Control Desk PG&E Letter DIL-03-004 March 27, 2003 Page 2 The members of the Review Board and their affiliates that performed reviews of the information being submitted are:

Clarence R. Allen I. M. Idriss Robert P. Kennedy Geology and Tectonics, California Institute of Technology Earthquake Engineering, University of California, Davis Structural Engineering, Independent Consultant If you have any questions regarding this response, please contact Mr. Terence Grebel at (805) 5454160 Lawrence F. Womack Vice President Nuclear Services gwh/41 62 Enclosures cc:

Diablo Distribution Thomas D. Green, Esq.

Darcie L. Houck Christopher Helenius Sheldon L. Trubatch cclenc:

Diane Curran, Esq.

Brian Gutherman James R. Hall (10)

David A. Repka, Esq.

John Stamatakos (2)

Robert K Temple, Esq.

Robert R. Wellington, Esq.

Jacquelyn Wheeler A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

PG&E Letter DIL-03-004 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Docket No. 72-26 In the Matter of

)

PACIFIC GAS AND ELECTRIC COMPANY)

)

Diablo Canyon

)

Independent Spent Fuel Storage

)

Installation

)

AFFIDAVIT Lawrence F. Womack, of lawful age, first being duly sworn upon oath states that he is Vice President, Nuclear Services of Pacific Gas and Electric Company; that he is familiar with the content thereof; that he has executed this supplemental slope stability response to additional NRC questions regarding the Diablo Canyon Independent Spent Fuel Storage Installation license application on behalf of said company with full power and authority to do so; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

Lawrence F. Womack Vice President Nuclear Services Subscribed and sworn to before me this 27th day of March 2003.

f46tary Publid Cmr*

/

13954 State of Califo si ObVipoI County of San Luis Obispo v

>onEl1.2X