Letter Sequence Other |
---|
|
Results
Other: L-02-010, Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399), ML020980082, ML020980126, ML022950286, ML022950304, ML032320119, ML040350009, ML052370264, ML052380142, ML052510118, ML062980229
|
MONTHYEARML0203505932002-02-0101 February 2002 Memo to C. L. Miller from: T. J. Kobetz Subject: Summary of the January 24, 2002, Meeting Between the Nuclear Regulatory Commission Staff and Pacific Gas and Electric, Co. Enclosures: 1.) Attendance List; and 2) PG&E Project Slides Project stage: Meeting ML0208401812002-03-25025 March 2002 Ltr to L. Womack, Diablo Canyon Power Plant, Acceptance Review for the Diablo Canyon Independent Spent Fuel Storage Installation Application Project stage: Acceptance Review ML0209800822002-04-0505 April 2002 Ltr to L. Womack, Diablo Canyon Power Plant, Public Disclosure Determination Project stage: Other ML0209801262002-04-0505 April 2002 Ltr to L. Womack, Pg&E, Public Disclosure Determination Project stage: Other ML0210701182002-04-17017 April 2002 Meeting Summary Between the NRC Staff and Pacific Gas and Electric Company to Discuss Pg&G'S Geology, Round Motion & Other Geotechnical Studies Project stage: Meeting ML0224700252002-09-0404 September 2002 Meeting with Pacific Gas & Electric to Discuss NRC Staff'S Request for Additional Information 10 CFR Part 72 License Application for Independent Spent Fuel Storage Installation at Diablo Canyon Project stage: RAI ML0226805842002-09-26026 September 2002 Summary of Meeting with Pacific Gas & Electric Co Re Diablo Canyon Independent Spent Fuel Storage Installation - 09/26/02 Memo to C.L. Miller from J.R. Hall Project stage: Meeting L-02-010, Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399)2002-10-15015 October 2002 Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1 (TAC L23399) Project stage: Other ML0229502862002-10-15015 October 2002 ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, List of Current Pages - Section 4.7.6 Project stage: Other ML0229503042002-10-15015 October 2002 ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, Table 4.3-1 - Section 8.2.2 Project stage: Other ML0300305682003-01-0303 January 2003 Closed Meeting Notice for Pacific Gas and Electric from 9 Am to 11am at the Us Nuclear Regulatory Commission, Conference Room O13B-2, Rockville, MD 20852 to Discuss NRC Staff'S 12/06/2002 Request for Additional Information Project stage: RAI DCL-03-007, Response to Request for Additional Information for Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Physical Security Program and Associated Revised Request for Exemption to Two 10 CFR 73.55 Requirements2003-01-31031 January 2003 Response to Request for Additional Information for Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Physical Security Program and Associated Revised Request for Exemption to Two 10 CFR 73.55 Requirements Project stage: Response to RAI L-03-007, Supplemental Slope Stability Design Mitigation Features Information to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application2003-05-0606 May 2003 Supplemental Slope Stability Design Mitigation Features Information to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application Project stage: Supplement ML0315606872003-05-0606 May 2003 Supplemental Slope Stability Design Mitigation Features Information to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application, Enclosure 2 Project stage: Supplement ML0315606902003-05-0606 May 2003 Supplemental Slope Stability Design Mitigation Features Information to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application, Crsp Input File Through References Project stage: Supplement L-03-008, Additional Questions Related to Supplemental Blasts & Explosions Responses to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application2003-06-13013 June 2003 Additional Questions Related to Supplemental Blasts & Explosions Responses to Additional NRC Questions for Diablo Canyon Independent Spent Fuel Storage Installation Application Project stage: Supplement ML0323201192003-08-20020 August 2003 Memo to J. Monninger from J.R. Hall - California State Historic Preservation Officer Concurrence in NRC Determination of Effects on Historic Properties for the Proposed Diablo Canyon Independent Spent Fuel Storage Installation (TAC No. L233 Project stage: Other ML0327600222003-10-0202 October 2003 10/02 03 Ltr to L. F. Womack from J. R. Hall - Federal Register Notice Publishing an Environmental Assessment and Finding of No Significant Impact for an Exemption from 10 CFR 72.72 (D) Project stage: Approval ML0403500092004-02-0303 February 2004 Letter to L.F. Womack - Diablo Canyon Independent Spent Fuel Storage Installation Application - Physical Security Program Changes TAC No. L23399) Project stage: Other ML0404302502004-02-11011 February 2004 Attachment (Tech Specs B) to Encl 1 (Preliminary License) to 02/11/04 Ltr to L Womack, Diablo Canyon Power Plant, Re Preliminary License and Safety Evaluation Report (SER) for Diablo Canyon Independent Spent Fuel Storage Installation Project stage: Approval ML0407809532004-03-22022 March 2004 Encl 2 (SER Ch 4) to 03/22/04 - Ltr L Womack Diablo Canyon Power Plant, Issuance of Materials License No. SNM-2511 for the Diablo Canyon ISFSI (72-26) (50-275, -323) Project stage: Approval ML0420501822004-07-22022 July 2004 Ltr to L. Womack (Homboldt Bay Power Plant) from J. Hall - Request for Additional Information for the Humboldt Bay Independent Spent Fuel Storage Installation Application Project stage: RAI ML0420503102004-07-22022 July 2004 Request for Additional Information on License Application and Safety Analyses Report Project stage: RAI ML0435800642004-12-21021 December 2004 Notice of Meeting with Pacific Gas & Electric Company to Discuss Status of NRC Staff Reviews of Pg&E'S 10 CFR Part 72 License Application for Independent Spent Fuel Storage Installation & Related Amendment Request for 10 CFR Part 50 License Project stage: Approval ML0503303912005-02-0202 February 2005 Summary of Meeting with Pacific Gas and Electric Company to Discuss the Application for the Humboldt Bay ISFSI (Tac No. L23683) Project stage: Meeting ML0523702642005-08-25025 August 2005 Ltr J Hall to D Jacobs (Diablo Canyon Power Plant) Public Disclosure Determination for Information Related to the Humboldt Bay ISFSI (Tac. No. L23683) Project stage: Other ML0523801422005-08-31031 August 2005 Preliminary SER Chapter 12 - Quality Assurance Evaluation Project stage: Other ML0525101182005-09-0202 September 2005 Ltr J Hall to D Jacobs (Diablo Canyon Power Plant) Humboldt Bay ISFSI Application - Physical Security Plan (Tac. No. L23683) Project stage: Other ML0629802292006-09-14014 September 2006 Modification No. 241 to Contract No. NRC-02-02-012 Project stage: Other 2003-06-13
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
April 5, 2002 Mr. Lawrence F. Womack Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424
SUBJECT:
PUBLIC DISCLOSURE DETERMINATION
Dear Mr. Womack:
By letter dated December 21, 2001, you submitted an application requesting a site specific license for an Independent Spent Fuel Storage Installation at the Diablo Canyon Power Plant.
In support of the application you provided a proprietary version of ten Holtec Internationals calculation report Nos. HI-2012626 Revision 7, HI-2012634 Revision 1, HI-2002563 Revision 4, HI-2002513 Revison 4, HI-2012618 Revision 5, HI-2012768 Revision 2, HI-2002497 Revision 1, HI-2002512 Revision 2, HI-2002559 Revision 1, and HI-2012615 Revision 0. Also included in your application was an affidavit signed by Holtec International. The December 21, 2001, letter contained an affidavit executed by Brian Gutherman of Holtec International, dated December 12, 2001, requesting that Holtec International reports listed above, containing business sensitive information, be withheld from public disclosure pursuant to 10 CFR 2.790.
Also attached to the December 21, 2001, letter were non-proprietary versions of the reports which will be available electronically for public inspection in the U. S. Nuclear Regulatory Commissions (NRC) Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ADAMS.html.
The affidavit signed by Brian Gutherman stated that the reports should be withheld from public disclosure for the following reasons:
(1) The information sought to be withheld from public disclosure consists of detailed calculations which is owned and has been held in confidence by Holtec International.
(2) The information is of a type customarily held in confidence by Holtec International and not customarily disclosed to the public.
(3) The information is being transmitted to the NRC in confidence under the provisions of 10 CFR 2.790 with the understanding that it is to be received in confidence.
(4) The information, to the best of Holtec Internationals knowledge, is not available in public sources.
(5) Public disclosure of this information is likely to cause substantial harm to Holtec Internationals competitive position because it would provide competitors with valuable information, not otherwise available, about Holtec Internationals designs to allow a competitor to compete unfairly against Holtec International.
L. Womack On the basis of your submittal, our review of your submittal and Holtec Internationals affidavit, and in light of the requirements of 10 CFR 2.790, we have determined that the Holtec International calculation report Nos. HI-2012626 Revision 7, HI-2012634 Revison 1, HI-2002563 Revision 4, HI-2002513 Revison 4, HI-2012618 Revision 5, HI-2012768 Revision 2, HI-2002497 Revision 1, HI-2002512 Revision 2, HI-2002559 Revision 1, and HI-2012615 Revision 0, and designated as containing proprietary material should be withheld from public disclosure pursuant to 10 CFR 2.790. It is the policy of NRC to achieve an effective balance between legitimate concerns for protection of competitive positions and the right of the public to be fully apprised as to the basis for and effects of licensing and rulemaking actions.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public disclosure should change in the future, such that the information could then be made available for public inspection, you should promptly notify NRC. Please be advised that NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your withheld information. In all review situations, if NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely,
/RA/
E. William Brach, Director Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-26 (50-275, -323)
TAC No. L23399
L. Womack April 5, 2002 On the basis of your submittal, our review of your submittal and Holtec Internationals affidavit, and in light of the requirements of 10 CFR 2.790, we have determined that the Holtec International calculation report Nos. HI-2012626 Revision 7, HI-2012634 Revison 1, HI-2002563 Revision 4, HI-2002513 Revison 4, HI-2012618 Revision 5, HI-2012768 Revision 2, HI-2002497 Revision 1, HI-2002512 Revision 2, HI-2002559 Revision 1, and HI-2012615 Revision 0, and designated as containing proprietary material should be withheld from public disclosure pursuant to 10 CFR 2.790. It is the policy of NRC to achieve an effective balance between legitimate concerns for protection of competitive positions and the right of the public to be fully apprised as to the basis for and effects of licensing and rulemaking actions.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public disclosure should change in the future, such that the information could then be made available for public inspection, you should promptly notify NRC. Please be advised that NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your withheld information. In all review situations, if NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely,
/RA/
E. William Brach, Director Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Docket No. 72-26 (50-275, -323)
TAC No. L23399 Distribution:
NRC File Center PUBLIC NMSS r/f SFPO r/f NJenson, OGC MWHodges, SFPO C:\ORPCheckout\FileNET\ML020980082.WPD OFC SFPO E SFPO C OGC C SFPO C SFPO SFPO NAME SBaggett EZiegler MPSiemien JDMonninger CLMiller EWBrach DATE 3/27/2002 3/27/2002 4/01 /2002 4/1/2002 4/1/2002 4/5/2002 C = Cover E = Cover & Enclosure N = No copy OFFICIAL RECORD COPY