There is currently no text in this page. You can search for this page title in other pages, or search the related logs, but you do not have permission to create this page.
Category:70
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "70"
The following 200 pages are in this category, out of 1,869 total.
(previous page) (next page)3
- 3F0314-03, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2013
- 3F0315-04, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2014
- 3F0316-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2015
- 3F0318-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2017
- 3F0320-04, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation
- 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020
- 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021
- 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022
- 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation
- 3F0324-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2023
- 3F0325-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2024
- 3F0517-01, Decommissioning Funding Plan for ISFSIs
- 3F0522-03, Notification of Revised Decommissioning Cost Estimate
- 3F0608-06, Submittal of License Amendment Request 303, Revision 0: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis.
- 3F0608-06, Submittal of License Amendment Request 303, Revision 0: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis
- 3F0618-02, Site Specific Decommissioning Cost Estimate
- 3F0902-06, Florida Power, Crystal River Unit 3 - License Amendment Request 271, Revision 1, Revised Improved Technical Specification (ITS) 3.7.18, for Two Inoperable Control Complex Chillers
- 3F1111-01, Document P23-1651-001, Rev. 0, Preliminary Decommissioning Cost Estimate for the Crystal River, Unit 3 Nuclear Generating Plant
A
- AEP-NRC-2008-18, Request for License Amendment to Technical Specification 5.6.3, Radioactive Effluent Release Report, and One-Time Exemption from 10 CFR 50.36a(a)(2)
- AEP-NRC-2011-22, Submittal of Decommissioning Funding Status Report
- AEP-NRC-2015-10, ISFSI Decommissioning Funding Plan
- AEP-NRC-2015-16, Decommissioning Funding Status Report
- AEP-NRC-2017-12, Decommissioning Funding Status Report
- AEP-NRC-2018-71, Independent Spent Fuel Storage Installation - Decommissioning Funding Plan
- AEP-NRC-2019-10, Submittal of Biennial Report on the Status of Decommissioning Funding
- AEP-NRC-2021-25, Decommissioning Funding Status Report
- AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation
- AEP-NRC-2023-15, Decommissioning Funding Status Report
- AEP-NRC-2024-86, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation
- AEP-NRC-2025-04, Decommissioning Funding Status Report
- AEP-NRC-2025-23, Decommissioning Funding Status Report
B
- B18614, Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times
- B18852, Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee
- BVY 10-020, 2009 Financial Test for Decommissioning Fund Parent Guarantee
- BVY 14-082, Update to Decommissioning Funding Status Report
- BVY 15-044, Pre-Notice of Disbursement from Decommissioning Trust - Vermont Yankee Nuclear Power Station
- BVY 17-012, Pre-Notice of Disbursement from Decommissioning Trust Vermont Yankee Nuclear Power Station
- BVY 17-018, Pre-Notice of Disbursement from Decommissioning Trust
- BVY 18-006, Pre-Notice of Disbursement from Decommissioning Trust
- BVY 18-032, Pre-Notice of Disbursement from Decommissioning Trust
- BVY 20-012, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2019
- BVY 22-005, ISFSI Decommissioning Funding Plan
- BVY 22-007, Pre-Notice of Disbursement from Decommissioning Trust
- BVY 22-009, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2021
- BVY 22-013, Notification of Revised Decommissioning Cost Estimate
- BVY 24-013, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2023
- BVY 25-009, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2024
- BVY 25-011, Pre-Notice of Disbursement from Decommissioning Trust
- BVY 25-018, ISFSI - Decommissioning Funding Plan
C
- CNL-15-189, Decommissioning Funding Update
- CNL-15-212, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)
- CNL-16-153, Initial Decommissioning Funding Plan for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI)
- CNL-18-111, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)
- CNL-19-008, Decommissioning Funding Status Report
- CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)
- CNL-19-095, Application to Modify the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (SQN-TS-19-04)
- CNL-21-074, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations
- CNL-23-022, Decommissioning Funding Status Report
- CNL-24-009, Brown Ferry Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Plant, Units 1 & 2 - Triennial Decommission Funding Plans for Independent Spent Fuel Storage Installations
- CNL-25-004, Decommissioning Funding Status Report
- CNL-25-008, Application to Modify Sequoyah Nuclear Plant, Unit 2 Technical Specifications to Extend Surveillance Requirement (SR) Intervals for SRs 3.6.12.2 and 3.6.12.3 (SQN-TS-24-006)
- CNRO-2005-00028, Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling
- CNRO-2007-00018, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)
- CNRO-2009-00010, Transmittal of Decommissioning Funding Assurance Plans
- CNRO-2009-00013, Response to Request for Additional Information Re Decommissioning Funding Assurance
- CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications
- CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc
- CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations
- CNRO-2015-00011, Submittal of Decommssioning Funding Status Report for 2014
- CNRO-2016-00010, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report, Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)
- CNRO-2018-00008, ISFSI, Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2017 Per 10 CFR Part 30 Appendix a
- CNRO-2018-00012, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)
- CNRO-2018-00019, Entergy Nuclear Operations, Inc. ISFSI - Submittal of Response to Request for Additional Information Re ISFSI Decommissioning Funding Plans
- CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc
- CNRO-2019-00007, And Waterford 3 Steam Electric Station - Decommissioning Funding Status Report
- CP-200900473, Decommissioning Report
- CP-201100295, Decommissioning Report
- CP-201300390, Decommissioning Report
- CP-201500264, Decommissioning Report
- CP-201601147, & ISFSI - Updated Information Regarding Notice of Planned Reallocation of Funds Between Nuclear Decommissioning Trust (NDT) Funds
- CP-201700223, Decommissioning Funding Status Report for Financial Assurance as of 12/31/2016
- CP-201900155, Decommissioning Report
- CP-202100155, (CPNPP) - Decommissioning Report
- CP-202300144, (CPNPP) - Decommissioning Report
- CP-202500086, Decommissioning Report
- CPSES-200300601, Decommissioning Report
- CPSES-200700606, Decommissioning Report
- CY-03-040, Decommissioning Funding Assurance
- CY-04-033, Decommissioning Funding Assurance
- CY-04-115, Update of License Termination Plan - Revision 2
- CY-04-168, Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002
- CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75
- CY-10-005, Decommissioning Funding Assurance Status Report
- CY-12-009, Redacted - Connecticut Yankee, Decommissioning Funding Assurance Status Report- 10CFR 50.75
- CY-12-064, Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation
- CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report
- CY-14-011, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-15-007, Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report
- CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan
- CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report
- CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report
- CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan
- CY-19-006, Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report
- CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan
- CY-22-003, And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report
- CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan
- CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-24-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-24-010, Independent Spent Fuel Storage Installation - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan
- CY-25-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report
- CY-25-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste
D
- DCL-03-035, Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 7
- DCL-05-026, Decommissioning Funding Report
- DCL-07-028, Supplemental to Decommissioning Funding Report
- DCL-09-021, Submittal of Decommissioning Funding Report
- DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010
- DCL-11-039, Submittal of Decommissioning Funding Report
- DCL-13-033, Decommissioning Funding Report
- DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 2
- DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits
- DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2
- DCL-19-055, Revised Enclosure for the Decommissioning Funding Report
- DCL-19-082, Site-Specific Decommissioning Cost Estimate
- DCL-20-014, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 2
- DCL-21-026, Decommissioning Funding Report
- DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections
- DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2
- DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 1
- DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 1
- DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2
- DCL-23-118, License Renewal Application
- DCL-24-031, Decommissioning Funding Report
- DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment
- DCL-25-031, Decommissioning Funding Report
E
- E910-03-010, Decommissioning Reports for Three Mile Island Unit 2, & Saxton Nuclear Experimental Corporation
- ENOC-07-00007, Status of Decommissioning Funding for Year Ending December 31. 2006 - 10 CFR 50.75(f)(1)
- ENOC-08-00018, Stations - Decommissioning Fund Status Report for the Period Ending December 31, 2007
- ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report
- ENOC-09-00007, Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1)
- ENOC-09-00024, Decommissioning Funding Assurance Plans
- ENOC-09-00034, Revised Decommissioning Funding Assurance Plan
- ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009
- ENOC-12-00039, ISFSI Decommissioning Funding Plans (10 CFR 72.30)
- ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc
- ENOC-14-00008, Entergy Nuclear Operations, Inc. - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2013 Per 10 CFR Part 30 App. a
- ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc
- ENOC-15-00005, Decommissioning Funding Status Report Entergy Nuclear Operations, Inc
- ENOC-15-00006, ISFSI and Vermont Yankee - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2014 Per 10 CFR Part 30 App. a
- ENOC-15-00007, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2014
- ENOC-16-00008, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2015, Per 10 CFR 50.82(a)(8)(vii)
G
- GNRO-2014/00068, License Amendment Request to Revise Technical Specification 2.1.1.2
- GO2-07-057, Decommissioning Fund Status Report
- GO2-09-059, Decommissioning Fund Status Report
- GO2-09-153, Submittal of an Amendment Request for Approval of Cyber Security Plan
- GO2-10-094, License Renewal Application First Annual Update
- GO2-12-026, License Renewal Application Third Annual Update
- GO2-12-183, & Independent Fuel Storage Installation, Submittal of Decommissioning Cost Estimate and Decommissioning Funding Plan
- GO2-13-051, Decommissioning Fund Status Report
- GO2-15-049, Submittal of Decommissioning Fund Status Report
- GO2-17-065, Plant Decommissioning Fund Status Report
- GO2-18-134, Decommissioning Cost Estimate and Decommissioning Funding Plan - 2018 Updates
- GO2-19-073, Supplemental Information for Plant Decommissioning Fund Status Report
- GO2-21-012, License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35)
- GO2-21-149, Independent Spent Fuel Storage Installation - Decommissioning Cost Estimate and Decommissioning Funding Plan - 2021 Updates
- GO2-23-038, Plant Decommissioning Fund Status Report
- GO2-24-101, Independent Spent Fuel Storage Installation - Decommissioning Cost Estimate and Decommissioning Funding Plan -2024 Update
H
- HBL-05-008, Decommissioning Funding Report
- HBL-05-013, Correction to Decommissioning Funding Report,
- HBL-08-007, Decommissioning Funding Report
- HBL-09-004, Decommissioning Funding Report
- HBL-10-009, P01-1604-002, Rev. 0, Decommissioning Cost Study for the Humboldt Bay Power Plant Unit 3, 2010 Safstor
- HBL-11-003, Decommissioning Funding Report
- HBL-12-006, Submittal of Decommissioning Funding Report
- HBL-13-003, Decommissioning Funding Report, Page 86 of 120 Through End
- HBL-14-009, Submittal of Decommissioning Funding Report
- HBL-15-003, Decommissioning Funding Report for Humboldt Bay, Unit 3
- HBL-17-006, Decommissioning Funding Report
- HBL-18-004, Decommissioning Funding Report for Humboldt Bay Power Plant. Unit 3
- HBL-19-007, Decommissioning Funding Report
- HBL-20-006, Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 3
- HBL-21-003, Decommissioning Funding Report for Humboldt Bay Power Plant, Unit 3
- HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations
I
J
- JAFP-01-0246, Proposed Change to the Technical Specifications Regarding Allowable MSIV Leakage (JPTS-01-004)
- JAFP-05-0084, Application for Technical Specifications (TS) Change Regarding Mode Change Limitations (TSTF-359) Using the Consolidated Line Item Improvement Process (CLIIP)
- JAFP-11-0003, Application for Amendment to Modify the Facility Operating License Condition 2.C(3), Fire Protection
L
- L-02-067, Revised Decommissioning Funding Report for 2001
- L-02-106, License Amendment Request Nos. 299 & 171
- L-03-034, Decommissioning Reports for Beaver Valley Power Station, Units 1 & 2
- L-07-038, Decommissioning Report for Year Ending December 31, 2006
- L-08-332, Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2. License Renewal Application (TAC Nos. MD6593 and MD6594) and License Renewal Application Amendment No. 30