z INDIANA Indiana Michigan Power MICHIGAN Cook-Nuclear Plant 11WdERe One Cook Place Bridgrnan, MI 49106 A unit of American Electric Power Indiana Michiga nPower.com March 20, 2015 AEP-NRC-2015-16 10 CFR 50.75(0(1)

Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Donald C. Cook Nuclear Plant Units 1 and 2 DECOMMISSIONING FUNDING STATUS REPORT In accordance with the requirements of 10 CFR 50.75(f)(1), Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP), Units 1 and 2, hereby submits the biennial report on the status of decommissioning funding. The recovery of decommissioning funds for the eventual decommissioning of CNP Units 1 and 2 is fully assured through cost of service regulation and the resulting contribution of funds into an external trust.

When projected to the current license expiration date for each unit, the Nuclear Decommissioning Trust balance is greater than the U. S. Nuclear Regulatory Commission calculated minimum cost of decommissioning pursuant to 10 CFR 50.75(b) and (c), confirming compliance with the financial assurance requirements of 10 CFR 50.75.

This letter contains no new commitments. If you have any questions regarding the report or decommissioning funding, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, W A~PAo,1 Joel P. Gebbie Site Vice President KMH/amp Enclosure c: M. L. Chawla - NRC Washington DC J. T. King - MPSC MDEQ - RMD/RPS NRC Resident Inspector C. Pederson - NRC Region III A. J. Williamson - AEP Ft. Wayne, w/o enclosure Aw.

ENCLOSURE TO AEP-NRC-2015-16 Indiana Michigan Power Company, Donald C. Cook Nuclear Plant Units 1 and 2 2014 U. S. Nuclear Regulatory Commission Financial Assurance Requirements Report for Decommissioning Nuclear Power Reactors As provided in 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the U. S. Nuclear Regulatory Commission on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactors it owns.

1. The minimum decommissioning cost estimate, pursuant to 10 CFR 50.75(b) and (c):
a. Cook Unit 1 $517,252,703
b. Cook Unit 2 $521,848,950
c. Total $1,039,101,653 These cost estimates were determined using the burial cost escalation values and the methods outlined in NUREG-1307, Revision 15, to determine minimum values.
2. The amount accumulated in the fund allocated to radiological decommissioning reflects the market value of the funds accumulated through December 31, 2014, net of all taxes currently due for items included in 10 CFR 50.75(b) and (c) are:
a. Cook Unit 1 $537,925,429
b. Cook Unit 2 $489,331,963
c. Total $1,027,257,392
3. A schedule of the annual amounts to be collected for items in 10 CFR 50.75(b) and (c) are as follows:
a. Cook Unit 1 - $3,100,000 for years 2015 - 2033 and $2,583,333 for year 2034 (current license expires in October 2034)
b. Cook Unit 2 - $3,100,000 for years 2015 -2037 The citations for the Orders that provide these rates are the State of Michigan Case Number U-1 5276 and the State of Indiana Cause Number 44075
4. The assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections are as follows:

A two percent real rate of return was applied to the annual balance for future funding projections. Incorporating the two percent real rate of return on trust assets as well as future contributions to the trust results in projected trust fund balances of approximately

$811 million for Unit 1 and $791 million for Unit 2 net of tax at the time those units are shut-down, which are above the NRC minimum decommissioning cost estimates.

5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v):

None

6. Any modifications occurring to a licensee's current method of providing financial assurances since the last submitted report:

None

7. Any material changes to trust agreements:

None