Withdraws Utils Pending Request for Exemption to 10CFR50 App R ,as Supplmented on 960110 & 961121.Overall Resolution of Thermo-Lag Issue at BSEP Will Be Achieved within 60 Days of Completion of B215R1 Outage
ML20205E134
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/26/1999
From: Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-99-0053, BSEP-99-53, TAC-M93545, TAC-M93546, NUDOCS 9904050068
Download: ML20205E134 (3)


Text

. .- -- - -. - - - .- -

i. CP&L Carolina Power & Light C oy P.O. Box 10429 Southport. NC 28461-0429 MAR 2 61999 SERIAL: BSEP99-0053 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT.NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324/ LICENSE NOS. DPR-71 AND DPR-62 l WITHDRAWAL GF REQUEST FOR EXEMPTION TO 10 CFR 50, APPENDIX R (NRC TAC NOS. M93545 AND M93546)

Gentlemen:

The purpose of this letter is to withdraw Carolina Power & Light (CP&L) Comp _.ny's pending r: quest for exemption to 10 CFR 50, Appendix R dated August 31,1995 (Serial:

BSEP 95-0378), as supplemented on January 10,1996 (Serial: BSEP 95-0659), and November 21,1996 (Serial: BSEP 96-0354). l CP&L's overall resolution of the Thermo-Lag issue at the Brunswick Steam Electric Plant (BSEP) has been contingent upon approval of this exemption request. As a result of withdrawing  ;

this exemption request, CP&L will now implement modifications to resolve the Thermo-Lag i issue at the BSEP. In order to allow orderly planning and implementation of these modifications, CP&L will complete those changes requiring a plan: outage during the Unit I refueling outage l currently scheduled to begin in February 2000 (i.e., Bil3RI), and during the Unit 2 refueling outage currently scheduled to begin in February 2001 (i.e., B215RI). Non-outage portions of the modifications will be implemented within 60 day s of completion of each refueling outage.

Overall resolution of the Thermo-Lag issue at the BSEP will be achieved within 60 days of completion of the B215R1 outage.

Please refer any questions regarding this submittal to Mr. Warren J. Dorman, Supervisor -

Licensing, at (910) 457-2068.

/

Sincerely, L '

G4L f.

Keith R. Jury 6 "h i Manager- Regulutory Affairs Brunswick Steam Electric Plant I d

!' 9904050068 990326 l PDR ADOCK 05000324 '

P PDR l ,

. i I

i Document Control Desk ,

BSEP 99-0053 / Page 2 MAT / mat l

Enclosure:

4 List of Regulatory Commitments cc (with enclosure):

_ U. S. Nuclear Regulatory Commission, Region 11 j

ATTN: Mr. Luis A. Reyes, Regional Administrator Atlanta Federal Center l61 Forsyth Street, SW, Suite 23T85

Atlanta, GA 30303-3415 U. S. Nuclear Regulatory Commission ATTN
Mr. Theodore A. Easlick, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869.

U. S. Nuclear Regulatory Commission ATTN: Mr. David C. Trimble, Jr. (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 l

l l

l d

ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS DPR-71 AND DPR-62 WITHDRAWAL OF REQUEST FOR EXEMPTION TO 10 CFR 50, APPENDIX R LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light (CP&L)

Company in this document. Any other actions discussed in the submittal represent intended or planned actions by CP&L. They are described for the NRC's information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs at the Brunswick Steam Electric Plant of any questions regarding this document or any associated regulatory commitments.

Commitment Committed date or outage

1. CP&L will complete resolution of the Thermo-Lag issue for B113R1 + 60 Days Unit I within 60 days after the refueling outage currently scheduled to begin in February 2000 (i.e., B 112R1).
2. CP&L will complete resolution of the Thermo-Lag issue for B215R1 + 60 Days Unit 2 within 60 days after the refueling outage currently scheduled to begin in February 2001 (i.e., B215RI),