Letter Sequence Request |
---|
|
|
MONTHYEARML20211N9011997-10-10010 October 1997 Forwards Request for Addl Info Related to License Amend Submittal Dtd 970909,addressing Analysis Rev for Makeup Sys Letdown Line Failure Accident Project stage: RAI ML20198T3611997-11-0707 November 1997 Responds to 971010 RAI Re License Amend Request 218.Increase in Mass Release & Consequences for Changes in Letdown Line Break Transient Do Not Warrant Consideration of Change in Es Actuation Setpoint Project stage: Other 3F1197-26, Corrected First Page to to NRC Re Response to RAI for LAR 218 Re Rev of Makeup Sys Letdown Line Failure Accident Analysis.Ltr Was Previously Submitted to NRC W/O Addressee Info on Page1997-11-0707 November 1997 Corrected First Page to to NRC Re Response to RAI for LAR 218 Re Rev of Makeup Sys Letdown Line Failure Accident Analysis.Ltr Was Previously Submitted to NRC W/O Addressee Info on Page Project stage: Response to RAI 3F1197-41, Forwards Corrected First Page to Re Response to RAI for LAR 218,rev of Makeup Sys Letdown Line Failure Accident Analysis1997-11-12012 November 1997 Forwards Corrected First Page to Re Response to RAI for LAR 218,rev of Makeup Sys Letdown Line Failure Accident Analysis Project stage: Response to RAI 3F1197-51, Provides Addl Info Requested by NRC During 971119 Telcon Re LAR 218 on Rev of Makeup Sys Letdown Line Failure Accident Analysis1997-11-25025 November 1997 Provides Addl Info Requested by NRC During 971119 Telcon Re LAR 218 on Rev of Makeup Sys Letdown Line Failure Accident Analysis Project stage: Other 3F0198-15, Provides Response to RAI Dtd 971209,re LAR 218 Concerning Rev of Makeup Sys Letdown Line Failure Accident Analysis1998-01-20020 January 1998 Provides Response to RAI Dtd 971209,re LAR 218 Concerning Rev of Makeup Sys Letdown Line Failure Accident Analysis Project stage: Response to RAI ML20153C4651998-09-18018 September 1998 Requests Addl Info Re 970909 Amend Request Which Addressed Analysis Rev for Makeup Sys Letdown Line Failure Analysis at Crystal River Unit 3,by 981030 Project stage: Other 3F1098-17, Forwards Response to Request for Addl Info for LAR 218 Re Revised Analysis of Makeup Sys Letdown Line Failure Accident.Nrc Criteria for Reliance on BAW-10192-P Has Been Satisfied Based on Assessment.No New Commitments Made1998-10-30030 October 1998 Forwards Response to Request for Addl Info for LAR 218 Re Revised Analysis of Makeup Sys Letdown Line Failure Accident.Nrc Criteria for Reliance on BAW-10192-P Has Been Satisfied Based on Assessment.No New Commitments Made Project stage: Request 1997-11-07
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-12, Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested1999-06-23023 June 1999 Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 3F0699-08, Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments1999-06-21021 June 1999 Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl1999-06-0404 June 1999 Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads1999-05-28028 May 1999 Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl1999-05-26026 May 1999 Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs1999-05-21021 May 1999 Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM1999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments1999-05-14014 May 1999 Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments 3F0599-07, Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 19781999-05-14014 May 1999 Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 1978 3F0599-03, Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR1999-05-12012 May 1999 Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl1999-05-12012 May 1999 Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl 3F0599-08, Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments1999-05-0303 May 1999 Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments 3F0599-09, Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 19981999-05-0101 May 1999 Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 1998 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent1999-04-30030 April 1999 Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent 3F0499-09, Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 9907301999-04-30030 April 1999 Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 990730 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements1999-04-23023 April 1999 Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl1999-04-20020 April 1999 Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin1999-04-16016 April 1999 Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin 3F0499-08, Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 19981999-04-16016 April 1999 Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 1998 1999-09-27
[Table view] |
Text
.
Fisrida Power CORPORATION NYNE*loYa i, Operst6ng ucense No. DPR 72 October 30,1998 l 3F1098-17 l U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 Response to Request for Additional Information - l License Amendment Request #218 Related to Revised Analysis of Makeup System I Letdown Line Failure Accident (TAC NO. M99571) I i
References:
- 1. NRC to FPC letter, 3N0998-05, dated September 18,1998
- 2. NRC to Framatome Technologes, Inc. (FTI) letter dated February 18,1997
Dear Sir:
In Reference 1, Florida Power Corporation (FPC) was requested to provide information demonstrating how each of the restrictions and conditions reflected in Reference 2 were met. Reference 2 is the NRC's acceptance for referencing Topical Report BAW-10192-P, " Loss-of-Coolant Accident Evaluation Model for Once-Through Steam Generator Plants," which is based on RELAP-5/ MOD 2-B&W.
With support from Framatome Technologies, Inc., FPC preparea the attached response to the requested NRC information. Based on this assessment, the NRC's criteria for reliance on BAW-10192-P have been satisfied.
There are no new regulatory commitments established by this letter. Please contact Ms. Sherry Bernhoft, Manager, Nuclear Licensing at (352) 563-4566, if you have any questions regarding this letter.
Sincerely, f l
M.W. Rencheck M '
- 4. ,,j )
Director, Nuclear Engineering and Projects
/ l U
MWR/twc 9811060108 991030 t DR
- p ADOCK 05000302 Attachment PDR xc: Regional Administrator, Region 11 NRR Project Manager Senior Resident Inspector CRYSTAL RIVER ENERGY COMPLEX: 16760 W. Power Line Street
- Crystal River, Florida 34428-6708 * (352)7954486 A Florida Progress Company
/ .
l . .
L '; . U_.S. Nuclear Regulatory Commission Attachment 3F1098-17 Page1of5 l
ASSESSMENT OF USING RELAPS FOR LETDOWN LINE FAILURE ACCIDENT I, Background In support of the spring 1996 refueling outage at the Crystal River Unit 3 (CR-3) plant, an analysis was performed of a break in the reactor coolant letdown line. The reactor coolant system (RCS) response
- for the letdown line failure accident was performed with the RELAPS/ MOD 2-B&W computer code
'(BAW-10164P). The computer code used in the analysis of record referenced in the CR-3 Final Safety Analysis Report (FSAR) was CRAFT 2, The RELAPS analysis was performed with the Framatome Technologies, Inc. (FTI) NRC-approved version of RELAPS/ MOD 2, and, with the ' exceptions described below, was done with the ECCS evaluation model (EM) as approved in BAW-10192-P.
The EM adequately determines the transient evolution; however, its primary purpose is to calculate a conservative peak cladding temperature (PCT) following a postulated LOCA. The EM models and methods are developed to predict core uncovering and resulting PCTs for transients with typical end times of less than two hours. The acceptance criterion for the letdown line failure accident, as reported in the CR-3 FSAR is the offsite dose released, and not core cooling. This break is limited in size and i location, and can be isolated such that core cooling will always be assured due to isolation of the break and/or initiation of ESAS. Given that this analysis was specifically performed to address offsite dose (or release) consequences, two adjustments were made to the EM input deck. These changes were: (1) the break discharge volume initial pressure, and (2) the critical flow model. In addition, the INEL interphase drag model was used in the steam generator tubes instead of the B&W slug drag model. '
These adjustments are described in Section Ill, below.
l 11. NRC Topical Report BAW-10192-P r
The NRC documented its review of the subject topical report (dated February 1994), along with Framatome's May 6,1996; October 11, 1996; and January 7,1997 responses to NRC requests for additional information in a February 18, 1997 letter to Framatome.' On the basis of its review, the l- NRC concluded _that BAW-10192 (hereinafter, the topical) is acceptable for referencing in licensing
! applications in the analysis of LOCA accidents for once-through steam generator plants. The NRC also noted that when the report is referenced in a license application (as exists in the CR-3 FSAR), it will not repeat its review of matters described in the report and found acceptable.
Enclosure 1 of the NRC's February 18, 1997, letter states, in part, that use of the topical methodology for reference in licensing applications involving large and small break LOCA analysis for B&W plants is acceptable, subject to eleven conditions. Accordingly, justifying use of the topical in licensee actions by comparing code use to the eleven conditions is necessary for plant-specific utilization of the topical.
In that regard, this text addresses those eleven conditions and demonstrates that use of the topical in support of this license amendment is acceptable.
(See letter from James E. Lyons, Acting Chief, Reactor Systems Branch, NRC, to J.H. Taylor, Manager, Licensing 4- Services, Framatome ' Technologies Inc.; " Acceptance for Referencing of Topical Report BAW 10192 P, <
' Loss-of-Coolant Accident Evaluation Model For Once-Through Steam Generator Plants'(TAC No. M89400)."
i L
.. . . - . . - . ~ . - --- .. - . - - - - - - .. - - ._ - - . -
w
'i U.S. Nuclear Rrgulatory Commission ~ Attachment 3F1098 {
Page 2 of 5 l
i o Ill. ~ NRC Conditions for Licensee Use of BAW-10192P -
FTI provides below, its evaluation of the eleven conditions that must be satisfied for a licensee to justify use of the Topical:
- 1. The LOCA methodology should include any NRC restrictions placed on the individual codes usedin the evaluation model.
Response
L FPC (with FTI being the user of the code) has satisfied all NRC restrictions placed on the use of RELAP5 as defined in the evaluation model presented by Framatome to the NRC in its ;
1 . letters dated February 1994 and as supplemented in correspondence' dated May 6,1996 except l
, for the input options noted in item I and described in detail in item III.2 below. j i
- 2. The guidelines, code options, and prescribed input specified in Tables 9-1 and 9-2 in both !
' Volume I and Volume 11 of BAW-10192P should be used in LBLOCA and SBLOCA evaluation model applications, respectively.
Response
. Given that this analysis was not specifically performed to address core cooling, two adjustments ,
were made to the EM input deck. These changes were: (1) the break discharge volume initial i pressure, and (2) the critical flow model. In addition, the INEL interphase drag model was used in the steam generator tubes instead of the B&W slug drag model.
The letdown line failure accident is represented by a break in the letdown line downstream of ,
the outboard isolation valve (inside the auxiliary building). The break discharge control volume pressure was set to 34 psia to simulate the presence of letdown line resistance before the break was opened. The transient output was reviewed and it was confirmed that the break flow remained choked throughout the transient. Therefore, no other changes to sink pressure were required.
The EM critical flow model was initially used, but the break void fraction exceeded 70 percent.
At this value, the static model may not be valid because it could under predict the break flow.
Therefore, the critical flow model was changed and separate cases were run to compare the integrated break flow. The first cases calculated break flow based on stagnation properties.
The next two cases investigated the Ransom-Trapp critical flow model and the EM model with a 0.7 multiplier on the transition and saturated conditions. The limiting case, the one that produced the greatest mass loss, was reported in the FSAR.
The INEL interphase' drag model was used on the inside of the steam generator tubes instead of the B&W slug drag model. The drag models calculate the interfacial effects between the two phases. However, in this analysis, the primary tube regions remained in single phase conditior.s, ilierefore there was no effect on the results.
- 3. The limiting linear heat rate for LOCA limits is determined by the power level and the product of the axial and radial peaking factors. An appropriate axial peaking factor for use in determining LOCA limits is one that is representative of thefuel and core design and that may
. __-.m ..
y_ _ ___ _ - _ . . - _ _ _ _ . . _ . _ . . _ . _ _ . _ . _ _ . . _
a
'; U.S. Nuclear Regulatory Commission Attachment 3F1098-17c Page 3 of 5
( occur over the core lifetime. The radialpeaking factor is then set to obtain the limiting linear
[
heat rate. .For this demonstration, calculations were performed with axial peak of1.7. The general approach is acceptablefor demonstrating the LOCA limits methodology. However, as future fuel or core designs evolve, the basic approaches that were used to establish these l
conclusions may change. FTI must revalidate the acceptability of the evaluation modelpeaking methods if: (1) sigmpcant changes arefound in the core elevation at which the minimum core LOCA margin is predicted or (2) the core maneuvering analyses radial and atlat peaks that approach the LOCA LHR limits dfer appreciablyfrom those used to demonstrate Appendix K
- compliance.
Response
)
. (
- The analyses performed did not relate to core kw/ft limits, so this restriction does not apply. I E
1 l- -4. lhe ' mechanistic ECCS bypass model is acceptablefor cold leg transition (0.75ft' to 2.0ft') l i , and hot let break calculations. The nonmechanistic ECCS bypass model must be used in the )
large cold leg break (> 2.0 ft') methodology since the demonstration calculations and 1 sensitivities were run with this model.
. Response I
~
The letdown line break is considered an isolatable SBLOCA'with the limiting break location )
being outside the reactor building. For SBLOCA applications, the ECCS bypass model is {
. typically not executed. ECCS bypass is a phenomenon applicable to blowdown during a large j, break of the reactor coolant piping in the reactor coolant pump leg. Therefore, this restriction ;
does not apply to the letdown line break analysis. !
l=~ l l 5. Time-in-hfe LOCA limits must be determined with, or shown to be bounded by a specepc '
application of the NRC-approval evaluation model. l
Response
No LOCA' limits were calculated; therefore, the restriction does not apply.
- 6. LOCA limits for three pump operation must be established for each class of plants by application of the methodology described in this report. An acceptable approach is to demonstrate that three pump operation is bounded byfourpump LHR limits. l J
Response
l No LOCA limits were calculated; therefore, the restriction does apply.
l - 7.- The limiting ECCS conpguration, including minimum versus maximum ECCS must be l determinedfor each plant or class ofplants using this methodology.
i
Response
[
L This restriction applies to analyses of large break LOCAs. As mentioned above, the letdown line break is considered an isolatable SBLOCA, and the use of minimum ECCS flow rates is 4 per se the limiting case for SBLOCA analyses. However, in order to maximize releases and
, U.S. Nuclear Regulatory Commission Attachment 3F1098-17 Page 4 of 5 dose consequences, normal makeup is maximized, and the engineered safeguards pressure setpoint for. high pressure injection actuation is minimized such that ECCS is not automatically l actuated. Therefore, this restriction does not apply.
- 8. For the small break model, the hot channel radial peaking factor to be used should correspond to that of the hottest rod in the core, and not to the radialpeaking factor of the 12 hottest
- bundles.
l
Response
The hot channel radial peaking factor used corresponded to the hottest rod in the core. Since )
- this analysis is primarily for a radiological consequence, no core heatup calculations were performed, or required to be performed, and therefore, this restriction is not relevant.
- 9. The constant discharge coeficient model (discharge coeficient = 1.0) referred to as the "High or Low Break Voiding Nonnalized Value," should be usedfor all small break analyses. The rnodel which changes the discharge coeficient as a function of void fraction, i.e., the
~1ntennediate Break Voiding Normalized Value" should not be used unless the transient is analyzed with both discharge models and the intermediate void method produces the more conservative results.
Response
The constant discharge coefficient model (discharge coefficient = 1.0) referred in the BAW-10192-P analysis as the "High or Low Break Voiding Normalized Value," was used for the makeup system letdown line failure accident analysis.
- 10. For a specific application of the FTl sinall break LOCA methodology, the break si:e which yiehis the local marimum PCT must be idennfied. In light of the different possible behaviors of the local marimum, FTl shouldjustify its choice of break sizes in each application to assure that
, either there is no local maximum or the si:e yielding the maximum local PCT has been found.
Break sizes down to 0.01ft'should be considered.
Response
l I
The analyses done to support the evaluations reported in this document were not done to predict limiting PCT consequences for SBLOCA, therefore the requirement does not apply.
- 11. B&W-designed plants have internal reactor vessel vent valves (RVVVs) that provide a path for j l core steam venting directly to the cold legs. The BWNT LOCA evaluation model credits the RVVV steamflow with the loop steam ventingfor LBLOCA analyses. The possibility existsfor a 1 cold leg pump suction seal to clear during blowdown and then reform during reflood before the evaluation inodel analyses predict average core quench. Since the REFLOOD3B code cannot predict this reformation of the loop seal, FTl is required to run the RELAP5/ MOD 2-B&W system model until the whole core qucnch, to confirin that the loop seal does not reform. This documentation should be performed at least once for each plant type (raised loop and lowered loop) and bejudged applicablefor all LBLOCA break sizes.
I
, U.S. Nuclear Regulatory Commission Attachment 1 3F1098-17 Page 5 of 5 )
, Response i
. . l This restriction applies to post-blowdown RCS behavior following a large break LOCA. None l of the cases analyzed to support the evaluations in this document were for break sizes sufficient to produce formation of a cold leg pump suction seal. Therefore, the restriction does not apply.
1 IV. Interface of RELAPS Use and CRAFT / THETA (FSAR Chapter 14) ;
The use of RELAPS for the letdown line failure accident analyses has been evaluated to determine if it is compatible with the use of CRAFT 2 in the CR-3 FSAR Chapter 14 accident analyses. This accident consists of an isolatable SBLOCA that is perfonned to determine the offsite dose consequences of a failure in a line carrying primay coolant outside of the reactor building. RELAPS was used because the code allows for more detailed modeling of the system but still produces a conservative prediction of '
the RCS pressure response. The higher RCS pressure (as predicated with RELAPS), coupled with a conservative critical flow calculation, results in a greater inventory loss through the broken letdown line and maximizes the dose consequences. It is concluded that no interface problems exist as a result of the use of the two codes because (1) the RELAP5 code has been reviewed and accepted by the NRC for application to SBLOCA transients, and (2) the analysis performed is more conservative and more reflective of the plant response to the letdown line failure accident.
V. Licensing Basis Based on the above discussions, the NRC's criteria for reliance on BAW-10192-P have been satisfied.
- Accordingly, for purposes of the letdown line failure accident, the licensing basis code is RELAPS !
(BAW-10192-P) as approved by the NRC in its letter dated February 18, 1997. !
l.
l l
+
i 1