Text

. - - . - - _- .__ _ - .

..L g Entergy 5 im c a <=tia ia=.

Opeintions 7 ,,y-July 14, 1992 2CAN079205 U. S. Nuclear Regulatory Commisslor Document Control Desk Mall Station p1-137 Washington, DC 20555

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Voluntary Feport of the Steam Generatar Tube Inservice Inspections Forced Outage 1992 Gentlement The Arkansas Nuclear One, Unit 2 (ANO-2) Technical Specifications 4.4.5.5.b and 6.9.1.5.b requires the complete results of all ANO-2 steam generator tube inservice Inspections (151) perf ormed during the report period be submitted on an annual basis. The inspections performed during the forced outage in March 1992 (2F92-1), were not Technical Specification required inservice inspections.

In letter dated May 12, .992 (2CAN059202), Entergy Operations provided the initial tube inspection results and stated that the complete results of the tube inspections performed during 2F92-1 would be submitted to the Staff. Attached is the Steam Generator Tubing Inservice Inspection Report for 2F92-1.

Should you have any questions regarding this issue, please contact me.

Very truly yours, T.

hsittA*

ames J.-Fisicato Director, Licensing JJF/RWC/mmg Attachments

/

M I

-[

[, k 9 Q 9207220L68 920714 I '}

gDR ADOCK 05000360 1 PDR j

. U. S. NRC July 14, 1992 Pag,e 2 cci Mr. James L. Milhoan U. S. Nuclear Regulatory Conynission Region IV 611 Ryan Plaza Jrive, be'te 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1. Nuclear Plant Road Russellville, AR 72801 Mr. Thomas d. Alexion NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike R oc kv1.' ' ? , Maryland 20852 Ms. Sheri Peterson NRR Project Manager. Region IV/ ANO-2 U. S. Nuc1 car Regulatory Commission NRR Mail Stop 13-ll-3 N. M ito Flint North 11555 Rockville Pike Rockville, Maryland 20852 i

- - - ~ . - - - - _ - ... _ . - -__

i Att'achment tot 2CAN079205 Page 1 ARKANSAS NUCbEAR ONE, UNIT 2 .

STEAM GENERATOR TUBING INSERVICE INSPECTION REPORT l MARCH.1992 FORCED OUTAGE (2F92-1)

EXAMINATION

SUMMARY

On March 9, 1992. Arkansas Nuclear One, Unit 2 (ANo-2) was shut down due to a 0.25 GPM leak in the "A" Steam Generator (SG). The leaking tube was found to have a circumferential crack in the expansion transition region at the top of the tubesheet. .

After stabilizing and plugging the leaking tube, AWO-2 examined 100% of the "A" and "B" SC.hotleg inservice tubes at i 2" of the tubesheet secondary side interface.- Due to the number of indications present in the "A" SG hotleg tubing, en-examination was performed in the "A" SG coldleg inservice tubing. _Tnis examination consisted of 20% of the SG tubing located in the center of the sludge pile " kidney" region (- 1000 tubes) at + 2" of the tubesheet secondary side intwrface.

The "A" rnd "B" SG tubing examination was performed utilizing the Motorized Rotating Pancake Coil (MRPC) probe. All tubes found with indications were inspected full length with a bobbin probe. A portion of the tubes with indications were tested using a rotating ultrasonic technique.

The previous inservice inspection was conducted in March 1991 during the l eighth refueling outage (2R8). The inservice inspection expanded to 9% ,

of the "A" SG tubes and 100%'of the "B" SG tubes. Zero (0) tubes were plugged in the "A" SG and seventy-three (73) tubes were plugged in the "B". . The tube indications,- causing the expansion from th3 original planned 3%. was found in the tube support plate regions of the "B" SG and believed to be outside olameter Intergranular Attack (IGA) and Axial +

Stress Corrosion Cracking (SCC).

EXAMINATION RESULTS ,

Circumfe rential crack indications were found in the "A" and "B" SG hotleg tubing. No indications were found in the."A" SG coldleg tubing,_ ,

examination. In the "A" SG, 421 tubes were identified with indications. ~

In the "B" SG, 67 tubes were identified with indications. A11 tubes wi+.h indications were repaired by sleeving or removed from service by plugging. . All tubes plugged due to circumferential indications were also stabilized.

Tebles 1 an'd 2 lis't'the tubes with indications for the "A" and "B" SGs, respectively. Indication location, size (if quantifiable). and disposition as' analyzed by the MRPC examination technique I

L

At.tachment to 2CAN079205 Page 2 l

in the "A' SG. 407 tubes were sleeved and 14 tubes were plugged with 8 4 plugged tubes stabilized. Tube segments were removed from 2 of the 14 plugged tubes for laboratory examinations. During the secondary side pressure test. 15 of the 407 installed sleeves leaked. Th 15 sleeved tubes were preventively plugged, bringing the total number of plugged tubes to 29, with 392 sleeved tubes remaining in service.

In the."B" SG, 59 tubes were sleeved and 8 tubes were plugged with 3 plugged tubes stabilized. Tube segments were removed from 3 of the 8 plugged tubes for laboratory examinations. During the secondary side pressure test. 3 of the 59 installed sleeves leaked. The 3 sleeved tubes were prever;tively plugged, bringing the total number of plugged tubes to 11, with 56 sleeved tubes remaining in service.

Tables 3 and 4 list the tubes of which segments were removed from the "A" and "B" SG hotlegs, respectively.

During the sixth refueling outage (2R6), March 1988, Westinghouse installed six mechanical ribbed plugs of Alloy 600 in the "B" SG hotleg '

tubing. In response to NRC Bulletin 89-01, Supplement 2 " Failure of Westinghouce Steam Generator Tube Mechanical Plugs". Entergy Operations committed in letter dsted August 8, 1991 (OCAN089108), to remove and replace or repair these six plugs during the next refueling outage (2R9).

Entergy Operations also stated that if an extended outage (greater than 4 weeks) were to occur before 2R9, these plugs would be replaced or repaired at that time.- The six plugs were repaired by stabilization  ;

utilizing Babcock & Wilcox Nuclear Service (BWNS) Plug-A-Plug (PAP) technique while working the "B" SG during 2F92-1.  ;

I' Table 5 lists the."B" SG hotleg tube plugs that were stabilized utilizing the BWNS PAP-technique.

t

. . , - . .g._,.ym,y, . . . , _ , _ , , , _ , . , , . . , , ,.__,,,--r im+- e ~& 1 rvv e--

-e,--,,v -w ww.= ,m .,

Attachment to:

2CAN079205 Page 3 TABLE 1 "A" STEAM GENERATOR ROW TUBE INDICATION LOCATION DISPOSITION 4 38 DTI TSH + 0.01 SLEEVED 5 53 DTI TSH + 0.09 SLEEVED 5 55 DTI TSH + 0.06 SLEEVED 6 114 DTI TSH + 0.20 SLEEVED 8 16 D11 TSH + 0.12 SLEEVED 8 54 DTI TSH + 0.11 SLEEVED 8 114 DTI TSH + 0.08 SLEEVED

? 151 DTI TSH - 0.03 SLEEVED _

11 19 DTI TSH + 0.09 SLEEVED 11 45 DTI TSH + 0.00 SLEEVED 11 61 DTI TSH - 0.08 SLEEVED 11 145 DTI TSH + 0.01 SLEEVED 11 149 DTI TSH + 0.09 SLEEVED DTI TSH + 0.11 11 151 DTI TSH + 0.09 SLEEVED DTI TSH + 0.07 12 28 DTI TSH + 0.00 SLEEVED 12 128 DT? TSH + 0.16 SLEEVED 12 142 DTI TSH + 0.06 SLEEVED 12 146 DTI TSH + 0.06 SLEEVED 13 17 DTI TSH + 0.00 SLEEVED 13 25 DTI TSH - 0.01 SLEEVED 13 27 DTI TSH + 0.09 SLEEVED 13 53 DTI TSH + 0.09 SLEEVED 13 127 DTI TSH + 0.12 SLEEVED 13 141 DTI TSH + 0.11 SLEEVED 13 147 DTI TSH + 0.10 SLEEVED _

l'a 149 DTI TSH + 0.16 SLEEVED DTI TSH + 0.13 13 151 DTI TSH + 0.08 SLEEVED 13 153 DTI TSH + 0.09 SLEEVED 14 28 DTI TSH + 0.00 SLEEVED 14 142 DTI TSH + 0.02 SLEEVED DTI TSH + 0.00 14 144 DTI TSH + 0.07 SLEEVED DTI TSH + 0.09 DTI TSH + 0.08 14 148 DTI TSH + 0.19 PLUGGED 14 152 DTI TSH + 0.08 SLEEVED 15 31 DTI TSH - 0.03 SLEEVED 15 59 DTI TSH + 0.04 SLEEVED 15 141 DTI TSH + 0.17 SLEEVED 15 143 DTI TSH + 0.09 SLEEVED 15 145 DTI TSH + 0.06 SLEEVED 15 147 DTI TSH + 0.13 SLEEVED DTI TSH + 0.03 15 149 LTI TSH + 0.10 SLEEVED Iv 112 DTI TSH + 0.15 SLEEVED 16 146 DTI TSH + 0.07 SLEEVED

. - -_ _~. - - . . . .

u .

l i

Attochment to:

2CAN079305 Page 4.

TABLE 1 i "A" STEAH GENERATOR ROW TUBE. INDICATION LOCATION DISPOSITION 16 148 DTI TSH + 0.05 SLEEVED 16 152 DTI TSH + 0.09 SLEEVED 17 33 .DTI TSH + 0.05 SLEEVED 17 147 DTI TSH + 0.10 SLEEVED l 17 151 DTI TSH + 0.15 SLEEVED DTI- TSH + 0.13 18 32 DTI TSH + 0.02 SLEEVED f 18 34 DTI TSH + 0.08 SLEEVED 18 .136 DTI TSH + 0.02 SLEEVED 18 138 DTI TSH + 0.03 SLEEVED f 19 35 DT' TSH + 0.01 SLEEVED 19 137 DTI TSH + 0.06 PLUGGED h 20 36 DTI TSH + 0.10 SLEEVED 20 52 30%TW BW1 - 0.88 SLEEVED DTI- TSH + 0.02

20. 60 DTI TSH + 0.00 SLEEVED 20 ' 136 DTI TSH + 0.05 SLEEVED 1 21 .33 DTI TSil + 0.02 SLEEVED

.21 35 DTI TSit - 0.03 SLEEVED 21 39 DTI TSH + 0.05 SLEEVED 21 53 DTI TSH + 0.06 - SLE5VED  ;

21 135 'DTI TSH + 0.03 SLEEVED 21 147 DTI TSH + 0.05 SLEEVED 21' 149 D1I TSH'+ 0.02- SLEEVED 21 151 DTI - TSH + 0.11 SLEEVED 22 30 DTI TSH + 0.22 SLEEVED 22 36~ DTI- TSH + 0.03 SLEEVED  :

'22 134 DTI TSH + 0.09 SLEEVED 22 - 136 DTI TSH + 0.04 SLEEVED 22 146 DTI 7SH + .0.07- SLEEVED 23- 31- DTI TSH + 0.07 - SLEEVED ,

23- 53 DTI -TSH + 0.05 SLEEVED 23 125 DTI - TSH + 0.01 SLEEVED-23 133 DTI TSH + 0.00 SLEEVED 24 :34 DTI TuH + 0.05 SLEEVED 24- 114. DTI TSH - 0.02 SLEEVED 24 - 146 -DTI TSH + 0.10 - SLEEVED 25' 39 DTI TSH +. 0.09 SLEEVED 25 131 DTI - TSH + 0.02 PLUGGED '

-- 2 6 34 DTI- TSH +- 0.02 SLEEVED 26 52- DTI- TSH - 0.07 FLUGGED 22%TW TSC - 1.31 26 128 DTI TSH + 0.04 SLEELED 26 - 130 DTI TSH + 0.05 SLEEVED

26 132' DTI TSH +' O.05 SLEEVED s27 ;33~ DTI TSH + 0.00 SLEEVED
27 35
DTI. TSH-- 0.04 SLFEVED 27 39 DTI TSH + 0.04 SLEEVED 27 111 DTI TSH + 0.06 SLEEVED
DTI TSH +' O.01 p

q g g +- 4 4ry-ro 9 -- t,,,y --

r e--v w w ---*.v

. w wwmm w p m w-en - - rrrer e .==-r-me-.e- ,i-a-w++r =-mnw- er m e.-.ae* - - - =-,. en-+-m--i =--r- = + =a-..n .-=n--m.... . . ~

_, _ . _. ..m_____ . _ - - . _ - . . _ _ . _ _ - . _ . _ _._

h . ..- l

', 4 a

.L  ? .: Attachmsnt tos-

[ 2CAN079205 P.a ,' 5 TABLE 1 "A" STEAM GENERATOR ROW TUBE INDICATION- -LOCATION DISPOSITION 27- - 129 DTI TSH +' O.01 SLEEVED 28 32 DTI TSH + 0.0b SLEEVED 28 52 DTI TSH + -0.06 SLEEVED 28 112 DTI TSH + 0.10 SLEEVED 28 126 DTI TSH + 0.07- SLEEVED  :

i. 28 128 DTI TSH + 0.02 PLUGGED 28 130 DTI i:SH + 0.03 SLEEVED 28' 132 DTI- TSH + 0.04 SLEEVED
29 /.1 DTI- TSH + 0.17 SLEEVED 28%TW TSC + 0.94 29 51 DTI TSH + 0.19 SLEEVED

'29 111 DTI- TSH +- 0.00 SLEEVED DTI TSH + 0.12 29 127 DTI TSH + 0.10 SLEEVED 12 9 129 - DTI TSH +. 0.08 SLLEVED DTI - TSH + 0.09 DTI- TSH + 0.10 29 133 DTI TSH + 0.11 SLEEVED 30 38 DTI TSH + 0.12 SLEEVED 30 50: DT; TSH +- 0.02 SLEEVED 3 30 112. DTI TSH + 0.03 SLEEVED 30 114 DTI TSH + 0.02 - SLEEVED ,

T 30 120 DTI TSh + 0.13 SLEEVED 30 124 DTI TSH + 0 09 PLUGGED 31 41 DTI TSH + 0.03 SLEEVED 31- 51 DTI TSH -- 0.05 SLEEVED 31 53 DTI TSH + 0.07 SLEEVED 3L 63. DTI TSH - 0.05 SLEEVED 31 123 DTI TSH + 0.03 SLEEVED 31' 125 DTI TSH + 0.05 SLEEVED 31 127 DTI TSH + -0.04 SLEEVED 32- 20 DTI TSH v 0.11. SLEEVED 32- 46 DTI TSH + 0.11 SLEEVED w 32: 48 21%TW 07H + 12.01 SLEEVED y

DTI - TSH + 0.18 32 150 DTI TSH - 0.02 SLEEVED 32- -52 DTI TSH~+ 0.00- SLEEVED as .

27%TW TSC + 1.33 32 124. DTI' TSH + 0.08 SLEEVED

, 32 130- DTI TSH + 0.05 SLEEVED l 34 2 4 -- JTI TSH + 0.05= SI 'SVED

'34 40' JTI TSM + 0 . '- ). SLuBVED

,34 42 DT1 TSH + -0.09 SLEEVED

.34 44 DTI TSH + 0.10 SLEEVED 34 50 DTI TSH - 0.05 SLEEVED 34 98 'DTI TSH + 0.07 SLEEVED 34- 112 -DTI TSH + 0.11 SLEEVED ,

'. 3 4 128 DTI- TSH + 0.00 SLEEVED 35, 121 DTI TSH + 0.08 SLEEVED L 36" 38- DTI TSU +- 0.03 SLEEVED w..p.+- f w- ,..-sw,,-#,w. .-, , - . . . , y,, . . . - +s,-m., .,,,,.y,,.mw-- -=- we m = -= -- e ee vw+w- * * + r-r--r- ev'-- w~"' " ' - >

.,. , - ~ . . ~ ~ - . _ - - - . _ _ . - . - . _..- ~. ~ - - .. ..- . . . - - . - .~. . .

^L. -

id-

. Attachment tot n 2CAN07C205 Page 6 n

~

i TABLE 1 i l

"A" STEAH GENERATOR R0W- TUBE INDICATION LOCATION DISPOSITION 36 44 DTI- TSH + 0.02 SLEEVED

?6 50 DTI TSH + 0.06 SLEEVED r36, 52 DTI TSH + 0.04 SLEEVED 3; 36_ 130 .DTI TSH + 0.12 SLEEVED TSH + 0.00

'37- 27 DTI SLEEVED 37 37. DTI TSH + 0.08 SLEEVED 37 39 DTI TSH + 0.04 SLEEVED 37 95 DTI- TSH + 0.26 SLEEVED 40 22 DTI TSH + 0.19 SLEEVED 40 56 DTI TSH + 0.00 SLEEVED

'40 120: .DTI TSH d 0.03 PLUGGED l 40 140' .DTI TSH + 0.14 SLEEVED 41 35' DTI TSH + 0.03 SLEEVED 41 39= DTI TSH + 0.05 SLEEVED 41 109 DTI TSH + 0.02 SLEEVED 42 118 DTI TSH + 0.02 SLEEVED 42 132 DTI TSH + 0.12 SLEEVED I 43 119 DTI TSH + 0.04 SLEEVED l 44 46 DTI TSH + 0.1? SLEEVED 44 4 8.. DTI TSH + 0.12 SLEEVED-

-44 108 DTI TS!! + 0.02 SLEEVED '

44 120 DTI TSH + 0.10 SLEEVED 45 47 DTI TSH + 0.00 SLEEVED 4 5 .. 49 DTI TSH + 0.03 SLEEVED ,

45 _ 119 DTI TSH + 0.11 SLEEVED F e5 121 'DTI TSH + 0.04 SLEEVED

, 45 DTI TSH + 0.08 SLEEVED a 48 DTI TSH + 0.04- SLEEVED

46. 50 DSI 01H + 0.87 PLUGGED  !

46 54 DTI TSH +. 0.01 SLEEVED ,

46 56 25%TW TSC + 0.74 46 58 DTI TSH + 0.05 SLEEVED 46 74 DTI TSH + 0.00 SLEEV"D 46 .78 41%TW 02H + 0.85 PLUGGED DTI TSH + 0.07 46' 106 DTI TSH + 0.14 SLEEVED 46 120- D1I TSH + 0.06 SLEEVED 47 49 DTI TSH +~ 0,06 SLEEVED 47 63 DTI TSH + 0.17 SLEEVED c 47 121 DTI TSH + 0.03 SLEEVED h

47 139' DTI TSH + 0.08' SLEEVED 48 104 DTI. TSH + 0.08 SLEEVED

-48 106 DTI TSH + 0.07 SLEEVED 49 4( :DTI TSH + 0.05 SLEEVED 50 38. DTI TSH + 0.10 SLEEVED 50 64 DTI TSH + 0.11 SLEEVED 50 66 DTI TSH + 0.08 3LEEVED T1 102 DTI TSH - 0.06 SLEEVED 50 104 DTI TSH + 0.10 SLEEVED 50 -114 DTI TSH +- 0.16 SLEEVED I - _

Attachment to

( 2CAN079205 Page 7 TABLE 1 "A" STEAM GENERATOR ROW TUBE INDICATION LOCATION DISPOSITION 50 118 DTI TSH - 0.02 SLEEVED 50 120 DTI TSH + 0.08 SLEEVED 51 45 DTI TSH + 0.03 SLEEVED

$1 51 DTI TSH + 0.11 SLEEVED 51 117 DTI TSH - 0.01 ELEEVED DTI TSH + 0.01 51 119 DTI TSH + 0.03 SLEEVED 52 44 DTI TSH + 0.09 SLEEVED __

$2 52 DTI TSH - 0.03 PLUGGED 52 54 DTI TSH - 0.02 SLEEVED 52 102 DTI TSH + 0.16 SLEEVED 52 106 DTI TSH + 0.05 SLEEVED 52 116 DTI TSH - 0.02 SLEEVED 53 33 DTI TSH - 0.15 SLEEVED 53 67 DTI TSH + 0.08 SLEEVED 53 115 DTI TSH + 0.09 SLEEVED 54 54 DTI T3H + 0.04 SLEEVED 54 114 DTI TSH + 0.07 SLEEVED 24%TW O1H + 0.89 54 116 DTI TSH + 0.05 SLEEVCD 55 53 DTI TSH + 0.03 SLEEVED

$5 63 DTI TSH + 0.11 PLUGGED 55 65 DTI TSH + 0.05 SLEEVED 55 77 DTI TSH + 0.04 SLEEVED 22%TW 07H + 18.81 21%TW 07H + 15.46 23%TW 07H + 5.58 56 54 DTI TSH + 0.00 SLEEVED 56 62 DTI TSti + 0.05 SLEEVED

$6 6C DTI TSH + 0.04 SLEEVED .

56 100 DTI TSH + 0.00 SLEEVED 56 114 24%TW 06H + 0.12 57 65 DTI TSH + 0.04 SLEEVED 57 67 DTI TSH + 0.13 SLEEVED 58 32 DTI TSH + 0.05 SLEEVED 58 56 DT1 TSH + 0.01 SLEEVED 58 64 DTI TSH + 0.14 SLEEVED 58 68 DTI TSH + 0.09 SLEEVED 59 57 DTI TSH + 0.13 SLEEVED 59 63 DTI TSH + 0.04 SLEEVED 59 65 DTI TSH + 0.07 SLEEVED 60 56 DTI TSH - 0.04 SLEEVED 60 66 DTI Tt H + 0.01 SLEEVED 60 68 DTI TSH + 0.09 SLEEVED 60 112 DTI TSH + 0.04 SLEEVED 60 114 DTI TSH - 0.02 SLEEVED 61 111 DTI TSH + 0.06 SLEEVED 62 58 DTI TSH + 0.03 SLEEVED 62 64 DTI TSH + 0.05 SLEEVED 62 66 DT! TSH + 0.03 SLEEVED

Attachment to:

2CAN079205 Page 8 TABLE 1 "A" STEAM GENERATOR ROW (UBE INDICATION LOCATION DISPOSITION 62 70 DTI TSH + 0.05 SLEEVED 62 112 DTI TSH + 0.09 SLEEVED 62 138 DTI TSH + 0.06 SLEEVED 63 59 DTI TSH + 0.06 SLEEVED 63 61 D11 TSH + 0.16 SLEEVED 63 67 DTI TSH + 0.07 SLEEVED 63 69 DTI TSH + 0.07 SLEEVED 63 77 DTI TSH + 0.05 SLEEVED __

63 81 DTI TSH + 0.08 SLEEVED 63 91 DTI TSH + 0.03 SLEEVED 63 97 DTI TSH + 0.07 SLEEVED 63 111 DTI TSH + 0.09 SLEEVED 64 68 DTI TSH + 0.07 SLEEVED 64 70 DTI TSH + 0.04 SLEEVED 64 76 DTI TSH + 0.04 SLEEVED 64 82 DTI TSH + 0.04 SLEEVED 64 90 DTI TSH - 0.04 SLEEVED 64 92 DTI TSH + 0.05 SLEEVED 65 77 DTI TSH + 0.05 SLEEVED 65 89 DTI TSH + 0.04 SLEEVED 65 93 DTI TSH + 0.02 SLEEVED 66 58 DTI TSH + 0.04 SLEEVED 66 82 DTI TSH + 0.04 SLEEVED 66 84 DTI TSH 0.03 SLEEVED 66 92 DTI T3H + 0.01 SLEEVED 66 106 DTI TSH + 0.02 SLEEVED 66 108 DTI TSH + 0.05 PLUGGED  ;

67 77 DTI TSH + 0.00 SLEEVED 67 81 DTI TSH - 0.06 SLEEVED 67 109 DTI TSH + 0.19 PLUGGED 68 32 DTI TSH + G.06 SLEEVED -

68 76 DTI TSH + 0.05 SLEEVED 68 78 DTI TSH + 0.03 SLEEVED 68 80 DTI TSH + 0.10 SLEEVED 68 84 DTI TSH + 0.11 SLEEVED 68 108 DTI TSH + 0.03 PLUGGED 68 110 DTI TSH + 0.00 SLEEVED 69 65 DTI TSH + 0.00 SLEEVED 69 95 DTI TSH + 0.25 SLEEVED 70 72 DTI TSH + 0.04 SLEEVED 70 74 DTI TSH + 0.03 PLUGGED 37%TW 06H + 0.26 70 78 DTI TSH + 0.04 SLEEVED 71 73 DTI TSH + 0.04 SLEEVED 71 105 DTI TSH + 0.12 SLEEVED 71 107 DTI TSH + 0 . 0 '. SLEEVED 71 131 DTI TSH + 0.04 SLEEVED 72 72 DTI TSH + 0.03 SLEEVED 72 74 DTI TSH + 0.00 SLEEVED 72 76 DTI TSH - 0.03 SLEEVED

. Attachment tot 2CAN079205 Page 9 l

TABLE 1 "A" STEAM GENERATOR ROW TUBE INDICATION LOGATION DISPOSITION 72 104 DTI TSH + 0.06 SLEEVED 73 69 DTI TSH + 0.10 SLEEVED 73 73 DTI TSH + 0.03 SLEEVED

/3 133 DTI TSH + 0.20 SLEEVt3 74 130 DTI TSH + 0.07 SLEEVED 74 132 DTI TSH + 0.03 SLEEVED 75 73 DTI TSH + 0.07 SLEEVED 75 131 DTI TSH + 0.13 PLUGGED _

76 74 DTI TSH + 0.04 SLEEVE 0 76 76 DTI TSH + 0.04 PLUGGED 76 80 DTI TSH + 0.07 SLEEVED 77 81 DTI TSH - 0.04 SLEEVED 77 99 DTI TSH + 0.00 SLEEVED 77 101 DTI TSH + 0.18 SLEEVED 78 78 DTI TSH + 0.02 SLEEVED 78 84 DTI TSH & 0.07 SLEEVED 78 86 DTI TSH + 0.02 SLEEVED 78 130 DTI TSH + 0.10 SLEEVED 79 79 DTI TSH + 0.00 SLEEVED 79 81 DTI TSH + 0.06 SLEEVED 79 87 21%TW TSH + 1.19 SLEEVED DTI TSH + 0.01 80 78 DTI TSH + 0.01 SLEEVED 80 82 DTI TSH + 0.01 SLEEVED 80 84 DTI TSH + 0.04 PLUGGED 31%TV 08H + 0.93 80 90 DTI TSH + 0.09 PLUGGED _

80 92 DTI TFH + 0.07 SLEEVED 80 94 DTI TSH + 0.08 SLEEVED 81 63 DTI TSH + 0.08 SLEEVED 81 93 DTI TSH + 0.12 SLEEVED 81 127 DTI TSH + 0.09 PLUGGED 82 80 DTI TSH + 0.00 SLEEVED 82 86 DTI TSH - 0.07 SLEEVED 83 83 DTI TSH + 0.04 PLUGGED 83 125 23%TW TSH + 3.56 83 127 DTI TSH + 0.03 PLUGGED 84 126 DTI TSH + 0.07 SLEEVED 85 133 DTI TSH + 0.03 SLEEVED 86 84 DT'- TSH + 0.16 SLEEVED 86 124 DTI TSH + 0.08 SLEEVED 87 43 DTI TSH + 0.12 SLEEVED 88 46 DTI TSH + 0.13 SLEEVED 88 126 DTI TSH + 0.12 PLUGGED 90 80 DTI TSH + 0.08 SLEEVED 90 84 DTI TSH + 0.31 SLEEVED DTI TSH + 0.33 90 122 DTI TSH + 0.08 SLEEVED 91 45 DTI TSH + 0.01 SLEEVED 91 119 DTI TSH + 0.11 SLEEVED

Attachment. tot 2CAN070305 Page 10 TABLE 1 "A" STEAH CENERATOR ROW TUBE INDICATION LOCATION DISPOSITION 92 46 DTI TSH + 0.24 PLUGGED 92 78 DTI TSH + 0.07 SLEEVED 92 -118 DTI .TSH + 0.07 SLEEVED 93 ' 45- DTI TSH - 0.01 SLEEVED 94 44 30%TW BW3 + .0.95 94 46 DTI TSH + 0.19 SLEEVED 94- 50 DTI TSH - 0.05 SLEEVED 95 119 DTI TSH + 0.04 SLEEVED 96 46 DTI TSH + 0.20- SLEEVED 96 84 - DTI TSH + 0.12 SLEEVED

-96 118 DTI TSH + 0.08 SLEEVED 97 115 DTI TSH +~ 0.09-SLEEVED 97 _ 121- DTI TSH + 0.13 SLEEVED 98 84.- DTI TSH + 0.03 SLEEVED 98- 110 DTI TSH - 0.03 SLEEVED 98 116 DTI TSH + 0.11 SLEEVED 99 109 DTI -TSH + 0.02 SLEEVED

~300 78 DTI TSH - 0.05- SLEEVED 100- 122 DTI TSH + 0.13 SLEEVED 101- 69 DTI TSH + 0.15 SLEEVED 101 73 DTI TSH + 0.05 SLEEVED 101 79 DTI TSH + 0.01 SLEEVED 101 109 DTI TSH + 0.16 SLEEVED 102- 72, DTI TSH + 0.03 SLEEVED 102 76 DTI TSH + o0.05 -SLEEVED 102 82 DTI TSH + 0.10 SLEEVED

-102 84 DTI TSH + _0.09 SLEEVED e 102: 94 DTI TSH + 0.07 SLEEVED 102 106 DTI TSH - 0.02 SLEEVED 103 63 DTI TSH + 0.14 SLEEVED'

-103 69 DTI TSH + 0.10 SLEEVED 103 97 DTI -TSH + 0.15 SLEEVED

-103 105 DTI TSH + 0.11 PLUGGED 103 107 DTI TSH + 0.06 SLEEVED 103' 109 DTI TSH + 0.10 SLEEVED

'104- 78 DTI. TSH + 0.04 SLEEVED

'104. '82 DTI TSH + 0.06 SLEEVED

.104 92 DTI TSH + 0.03 SLEEVED 104 96 DTI- TSH + 0.04 SLEEVED 104 108 DTI TSH + 0.01 SLEEVED 105 <61 - DTI TSH + 0.16 SLEEVED 105 63_ _DTI TSH + 0.03 SLEEVED 105' 67 DTI TSH + 0.06 SLEEVED

'105 69 DTI TSH + 0.13 SLEEVED 105 71- DTI TSH + 0.06 SLEEVED L 165' 73 DTI TSH + 0.04 SLEEVED l: -105 77 DTI TSH + 0.04 SLEEVED L .105- 79 DTI TSH-+ 0.06 SLEEVED

'105' 85 DTI TSH + 0.13 SLEEVEL c105' 103 DTI- TSH + . 0.14 SLEEVED <

l?

1 1- . _ _ . . _ . _ . _ . . _ . . _ . _ . _ . _ _ _ _ . _ __

Attachment tot 2CAN079205' Page 11 ,

TAELE 1  !

"A" STEAM GENERATOR R0W TUBE INDICATION LOCATION DISPOSITION 106 64 DTI TSH + 0.00 SLEEVED 1 106 68 DTI TSH + 0.09 SLEEVED 106 70 DTI TSH + 0.14 SLEEVED 106 76 D'. TSH + 0.07 SLEEVED 106 78 DTI TSH + 0.05 SLEEVED

- 106 80 DTI TSH + 0.10 SLEEVED 106 ~82 DTI TSH + 0.13 - SLEEVED

-106- 86 DTI TSH + 0.00 SLEEVED

-106~ 88 'DTI TSH - 0.02 SLEEVED '

106 92 DTI TSH + 0.03 SLEEVED 106 96 DTI TSH + 0.12_ SLEEVED 106- 98 'DTI TSH + 0.10 SLEEVED L '106. 100 DTI TSH + 0.00 SLEEVED 106 104 DTI TSH + 0.08 SLEEVED 107 63 DTI TSH + . 0.11 SLEEVED 107 65 DTI TSH + 0.08. SLEEVED ,

107 69 DTI TSH + 0.08 SLEEVED -

107 71 DTI TSH + 0.07 SLEEVED 107 73 DTI TSu + 0.10 SLEE"ED 107 75 DTI YSH + 0.05 SLEEVED 107 81 DTI TSH + 0.13 . SLEEVED 107 87 DTI TSH + 0.13 SLEEVED ,

107 89 DTI TSH + 0.08 SLEEVED 107 91 DTI TSH + 0.19' SLEEVED ,

107 .93 DTI TSH + 0.11 SLEEVED 107 95 DTI - TSH + 0.15 SLEEVED 107- 97 68%TW BW1 - 0.02 PLUGGED 47%TW: BW3 - 0.90 58%TW BW1 + 0.49 108- 72 .DTI TSH + 0.07 SLEEVED 108 74 DTI TSH + 0.09 SLEEVED-108 76 DTI TSH + 0.02 - SLEEVED 108- 18 2 DTI TSH + 0.18 SLEEVED 108 88 DTI TSH - 0.06 SLEEVED 108 90 DTI- TSH + 0.06 ' SLEEVED

_108 92 DTI TSH + 0.05 SLEEVED 108 -94 DTI. TSH + 0.01 SLEEVED 109- 77 DTI TSH + ~0.00 PLUGGED 109 65 DTI TSH_+ 0.11 SLEEVED 110, 62 DTI TSH + 0.03 SLEEVED

~ 110 68- DTI .TSH + 0.07 SLEEVED E -110- 74 DTI TSH + 0.05 SLEEVED L L110 92 .DTI TSH + 0.08 SLEEVED l 111 '93- 'DTI- TSH + 0.01 SLEEVED 11A- 95 DTI TSH + 0.16 SLEEVED

.113 67- DT1 TSH + 0.09 SLEEVED 113 71- DTI TSH + 0.11 SLEEVED 113 73 DTI TSH + - 0.05 SLEEVED 113 91 DTI TSH + 0.05 SLEEVED 113 93 DTI TSH + -0.07 SLEEVED e yr3 y- s-- 9-m.=- e'  % se g w4rge- p- y .w-=y9., ywm4,e ai ,p.1Iy %ep4 e.W-eq.y m1,. 4y3,- y y ae # r mis e, . H 4-p.---g -g4, yc, p. ., w r - w w-

i ' '

- . Attachment tot 2CAN079205 Page 12 TABLE 1 "A" STEAM GENERATOR ROW TUBE INDICATION LOCATION DISPOSITION 114 72 DTI- TSH + 0.18 SLEEVED 115- 71 DTI TSil + 0.05 SLEEVED-120 72 DTI TSit - 0.10 PLUGGED 133 85 DTI TSli + 0.05 SLEEVED 139 95 DTI TSil ~ + 0.68 SLEEVED i.

LEGEND: TSH - TUBESilEET IIOT LEG SIDE TSH + X.X - FLAW LOCATED X.X INCHES ABOVE TIIE Il0T LEG TUDESilEET DSI - DISTORTED SUPPORT INDICATION DTI-DIgf0RTEDTUBESHEETINDICATION OXH "X -

BWX "XY'"BATWING TUBESUPPORTSUPPORT Il0T LEG SIDE TW - THROUGli WALL 1

L

~. . _ . -

Attachment tot 2CAN079205 Page 13 TABLE 2 "B" STEAH GENERATOR ROW TUBE INDICATION LOCATION DISPOSITION 11 17 DTI TSH + 0.11 SLEEVED 14 148 DTI TSH + 0.06 SLEEVED 15 19 DTI TSH + 0.03 SLEEVED 15 31 64%TW 01H + 0.94- PLUGGED DTI TSH 4 0.00 15 145- DTI TSH + 0.08 SLEEVED 17 147 .DTI TSH + -0.00 SLEEVED 18 154 DTI TSH + 0.03 SLEEVED 19 55 37%TW' -02H + 0.70 PLUGGED DTI TSH + 0.00 25%TW TSH + 1.46 19 151 DTI .TSH + 0.00 SLEEVED 19 165 DTI TSH + 0.17 SLEEVED 20 16 DTI TSH + 0.09 SLEEVED 20 164 DTI TSH + 0.07 SLEEVED 21- 19 DTI TSH + 0.04 SLEEVED 24 54 DTI TSH + 0.11 SLEEVED 36 130 DTI TSH + 0.02 PLUGGED 43 67 DTI TSH + 0.06 SLEEVED 43 101 DTI TSH + 0.02 SLEEVED 53- 45 DTI TSH 1 0.12- -SLEEVED 60 32 DTI TSH + 0.00 SLEEVED 60- 100 47%TW 01H + 0.85 PLUGGED l DTI TSH + 0.00 66 DTI TSH + 0.06 SLEEVED 132

= 67: 45 DTI TSH + 0.15 SLEEVED 68 48 DTI TSH + 0.00 SLEEVED l 74 40 DTI- TSH + 0.10 -SLEEVED e 76 94 DTI TSH + -0.23' SLEEVED G , 81 39 DTI. TSH + 0.05 SLEEVED 81 43. DTI TSH + 0.03 SLEEVED 81- 45 DTI TSH + 0.02 SLEEVED 81 87 DTI TSH + 0.22 SLEEVED-84 40 DTI TSH + 0.04 PLUGGED 84 42 DTI TSH + 0.13 SLEEVED

-DTI TSH + 0.10 84 44 __ DTI. TSH + 0.13 SLEEVED 84 150- 25%TW BW3 + 0.00 PLUGGED 42%TW BW5 + 0.00 DTI TSH +' O.00 DTI TSH + 0.12 87 .119 DTI TSH + 0.00 SLEEVED 90 120 DTI TSH + 0.11 SLEEVED 91 53- DTI TSH + 0.04 SLEEVED 91 85 DTI TSH + 0.11 PLUGGED 91: 125 DTI TSH + 0.04 SLEEVED

-93 53 DTI- TSH + 0.02 SLEEVED 94- 542 DTI TSH + 0.04 St.EEVED L

Att.achment to 2CAN079205 Page 14 TABLE 2 "B" STEAM GENERATOR ROW TUBE INDICATION LOCATION DISPOSITION 96 116 56%TW 02H + 0.51 PLUGGED DTI TSH + 0.00 98 52 DTI TSil + 0.11 SLEEVED 100 106 DTI TSH + 0.0$ SLEEVED 102 96 UTI TSH + 0.37 SLEEVED 103 65 DTI TSH + 0.11 SLEEVED 104 60 D1I TSH + 0.20 PLUGGED 104 68 DTI TSil + 0.01 SLEEVED ,.

104 90 DTI TSH + 0.00 PLUGGED 104 106 DTI 7511 + 0.11 SLEEVED 105 61 DTI TSH + 0.00 SLEEVED 105 69 DTI TSH + 0.11 SLEEVED 105 89 DTI TSl! + 0.13 SLEEVED DTI TSH + 0.12 105 93 DTI TSH + 0.14 SLEEVED 106 70 DTI TSH + 0.34 SLEEVED 106 82 DT1 TSP + 0.04 SLEEVED 107 63 DTI TSH + 0.13 SLEEVED DTI 107 71 DTI TSil + 0.06 SLEEVED 107 79 DTI TSH + 0.00 SLEEVED 108 102 DTI TSH + 0.00 SLEEVED 108 136 DTI TSH + 0.00 SLEEVED DTI TSH + 0.22 110 70 DTI TSH + 0.14 SLEEVED 111 71 DTI TSil + 0.14 SLEEVED e 111 73 DTI TS11 + 0.09 SLEEVED -

111 85 DTI TSl! + 0.04 SLEEVED 111 99 DTI TSH + 0.31 SLEEVED 113 99 DTI TSH ^ 0.04 SLEEVED 131 113 73%TW BW1 + 0.85 PLUGCED DTI TSil + 0.00 LEGEND: TSH - TUBESHEET HOT LEG SIDS -

TSH + X.X - FLAW LOCATED X.X INCHES ABOVE 4

THE HOT LEG TUBESHEET DSI - DISTORTED SUPPORT INDICATION DTI-DI{f0RTEDTUBESHEETINDICATION OXH "X " TUBE SUPPORT HOT LEG SIDE BWX "X " BATWI"G SUPPORT TW - THROUGH WALL l

. Attachment tot j 2CAN079205 Page 15

. l l TABLE 3 l-1 I l "A" SG TUBES WITH REMOVED SEGMENTS l l 1 l ROW l LINE l l l l l 13 l 147 l l 55 l 63 l l l 1 o

l TABLE 4 l l- l l "B" SG TUBES WITil REMOVED SEGMENTS l' I I

-l ROW l LINE l l l l l 19 [ 55 l ,

l 36 l 130 l l 96 l 116 l l 1 1 l TABLE 5 l l 1 l "B" SG !!0TLEG TUBE PLUGS STABILIZED l 1 l l ROW l LINE l-1 I l l 28 l 100 l l 29 l 69 l 1 30 l 70 l ,

l 32 l 70 l

-l 36 l 92 l l 39 l 83 l I I I l-

~, --g-y-w.m . m - r e 'n-- r-. ,-.--,-,,-em-c..,. ,,ev ,r-,,,-.--.wwv.,