05000498/LER-1992-018, Forwards Rev 1 to Voluntary LER 92-018 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Voluntary LER 92-018 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages
ML20078Q917
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 02/14/1995
From: Cloninger T
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078Q919 List:
References
ST-HL-AE-4990, NUDOCS 9502220127
Download: ML20078Q917 (3)


LER-2092-018, Forwards Rev 1 to Voluntary LER 92-018 Re Pressurizer Safety Valve (Psv) & MSSV Setpoints Outside Required Tolerance.Rev Incorporates Info Re MSSV & Psv Setpoints Found Out of Tolerance During Past Outages
Event date:
Report date:
4982092018R00 - NRC Website

text

-

l The Light cg,o m p a n; yg South p, Texas Project Electric Generating Station P. O. Box 289 Wadsworth, Temas 77483 February 14,1995 ST-HL-AE-4990 File No.: G26 10CFR50.73 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Unit 1 Docket No. STN 50-498 Revision I to Voluntary Licensee Event Report 92-018 Pressuri7.er Safety Valve Setpoints and Main Steam Safety Valve Outside Reauired Tolerance Pursuant to 10CFR50.73, Houston Lighting & Power Company submits the attached revision to Unit i Voluntary Licensee Event Report 92-018, regarding Pressurizer Safety Valve and Main Steam Safety Valve setpoints outside required tolerance. This event did not have an adverse effect on the health and safety of the public.

The purpose of this revision is to incorporate information regarding several Main Steam Safety Valve and Pressurizer Safety Valve setpoints that were found to be out of tolerance during past outages. The out of tolerance conditions of the Main Steam and Pressurizer Safety Valves were evaluated for impact to the design basis analysis. The safety analysis concluded that all criteria are met, thus, the past safety analyses bounded each situation. This revision includes an expanded safety analysis regarding out of tolerance conditions and their impact on Unit operation.

Changes are indicated by revision bars.

This Licensee Event Report was originally submitted prior to the issuance of the guidance which was provided by letter from Mr. S. J. Collins, Nuclear Regulatory Commission Division Director of Reactor Safety, to Mr. W. T. Cottle, Nuclear Group Vice President, Houston Lighting

& Power, dated December 8,1993. This guidance clarified interpretation of reporting requirements related to out of tolerance conditions on primary or secondary safety relief valves.

Prior to the issuance of this guidance, Hcaston Lighting & Power had a different interpretation of the application of this reporting requirement.

9502220127 950214 PDR ADOCK 05000498 S PDR i.r,.m n u sooins .u2 I Project Manager on Behalf of the Participanu in the South Texas Project

Houston Lighting & Power Company South Texas Project Electric Generating Station ST-IIL-AE-4990 File No.: G26 Page 2 The original Licensee Event Report was focused on Pressurizer Safety Valves and did not include identification of similar conditions on the Main Steam Safety Valves or prior occurrences of these conditions. Additionally, the original Licensee Event Report did not provide an evaluation of the impact of the out of tolerance condition on the design basis analysis. After analysis of the out of tolerance data, it was determined that the out of tolerance conditions experienced as a result of the Pressurizer Safety and the Main Steam Safety Valves did not result in a condition that was unanalyzed or outside the design basis of the plant.

IIouston Lighting & Power will ensure that this guidance is appropriately applied to out of tolerance coaditions for surveillances in future outages. Personnel have been sensitized to the ,

analysis and reporting requirements for these type of conditions. ,

i If you should have any questions on this matter, please contact Mr. J. M. Pinzon at ,

(512) 972-8027 or me at (512) 972-8787

/ l

11. Clo ger

/ Vice Pr ide , ,

Nucle gineerir g  !

JMP/lf i

Attachment:

Revision I to Voluntary LER 92-018 (South Texas, Unit 1)

.. l i

i LER-94\t2.146001R1 U1 l

t

., , p l ,

l i

. Houston Lighting & Power Company - ST-HL-AE-4990. l South Texas Project Electric Generating Station File No.: G26-Page 3 c: j Leonard J. Callan Rufus S. Scott  !

Regional Administrator, Region IV Associate General Counsel. .!

U. S. Nuclear Regulatory Commission Houston Lighting & Power Company l l

611 Ryan Plaza Drive, Suite 400 P. O. Box 61067

  • Arlington, TX 76011-8084 Houston, TX . 77208 i

Thomas W. Alexion Institute of Nuclear Power  !

Project Manager Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 l David P. Loveless Dr. Joseph M. Hendrie j Sr. Resident Inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm. Bellport, NY 11713  ;

P. O. Box 910 .

Bay City, TX 77404-0910 Richard A. Ratliff l Bureau of Radiation Control  !

3. R. Newman, Esquire Texas Department of Health j Morgan, Lewis & Bockius 1100 West 49th Street .  ;

1800 M Street, N.W. Austin, TX 78756-3189 i Washington, DC 20036-5869 }

U. S. Nuclear Regulatory Comm.  ;

K. J. Fiedler/M. T. Hardt Attn: Document Control Desk .

j City Public Service Washington, D. C. 20555 0001 P. O. Box 1771 l San' Antonio, TX 78296 i J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.  ;.

Electric Utility Department 2300 N Street, N.W.

721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704  ;

i G. E. Vaughn/C. A. Johnson

{

Central Power and Light Company j P. O. Box 2121  !

Corpus Christi, TX 78403 l

I I

[

i i

f