05000483/LER-2022-002, Forward LER 2022-002-00 for Callaway Plant, Unit 1, Containment Spray and Cooling Systems, and a Condition Which Could Have Prevented Fulfillment of the Safety Function of the Containment Spray System (Letter Only)

From kanterella
Jump to navigation Jump to search
Forward LER 2022-002-00 for Callaway Plant, Unit 1, Containment Spray and Cooling Systems, and a Condition Which Could Have Prevented Fulfillment of the Safety Function of the Containment Spray System (Letter Only)
ML22230C933
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/18/2022
From: Bianco F
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22230C932 List:
References
ULNRC-06759
Download: ML22230C933 (3)


LER-2022-002, Forward LER 2022-002-00 for Callaway Plant, Unit 1, Containment Spray and Cooling Systems, and a Condition Which Could Have Prevented Fulfillment of the Safety Function of the Containment Spray System (Letter Only)
Event date:
Report date:
4832022002R00 - NRC Website

text

Ameren MISSOURI Callaway Plant August 18, 2022 ULNRC-06759 U. S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.73(a)(2)(i)(B) 10 CFR 50.73(a)(2)(v)(C) 10 CFR 50.73(a)(2)(v)(D)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 LICENSEE EVENT REPORT 2022-002-00 CONTAINMENT SPRAY RECIRCULATION VALVE OUT OF POSITION WHICH RESULTED IN CONDITION PROHIBITED BY TECHNICAL SPECIFICATIONS AND CONDITION WHICH COULD HAVE PREVENTED FULFILLMENT OF A SAFETY FUNCTION The enclosed Licensee Event Report (LER) is submitted in accordance with 10 CFR 50.73(a)(2)(i)(B),

10 CFR 50.73(a)(2)(v)(C), and 10 CFR 50.73(a)(2)(v)(D) to report a violation of Technical Specification 3.6.6, Containment Spray and Cooling Systems, and a condition which could have prevented fulfillment of the safety function of the Containment Spray System.

This letter does not contain new commitments.

çO7.

Fred Bianco Senior Director, Nuclear Operations Enclosure LER 2022-002-00 83 15 County Road 459 Steedman, MO 65077 AmerenMissouricom

ULNRC-06759 August 18, 2022 Page 2 of 3 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1 600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001

ULNRC-06759 August 18, 2022 Page3of3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via LER ULNRC Distribution:

F. M. Diya B. L. Cox F. J. Bianco D. E. Farnsworth T. A. Witt T. B. Elwood Corporate Oversight NSRB Secretary Performance Improvement Coordinator Resident Inspectors (NRC)

STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Kathleen McNelis (Public Service Commission)

Ms. Claire Eubanks (Public Service Commission)